← Back
QUEENS
57-66 74 STREET
QUEENS · BIN 4625941
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
Architecture
Roof1p · 1 filing · 14 docs
2 jobs · most recent 09/14/2026
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
09/14/2026——Heating Systems
Heating
Rheem PROPE50 M2 RH92 CS 40,000 BTU · Water Heater ×4
01/11/2026——Heating Systems
Heating
Rheem PROPE50 M2 RH92 CS 40,000 BTU · Water Heater ×3
1 job · most recent 09/14/2026
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
09/14/2026——Plumbing-Sprinkler, Storm, Water/Sanitary
2 jobs · most recent 09/14/2026
Steel Masonry
FiledStatusContractorScope
09/14/2026——Steel, Masonry
01/11/2026——3 scope_items
1 job · most recent 01/11/2026
Fence
FiledStatusContractorScope
01/11/2026——Fence
Building Lifecycle
All (51)Filed (6)Objection (15)Special Inspection (30)
09/14/2026
Filed — New Building
INSTALL HOUSE CONNECTION FOR DEP: SD1&2 ONLY
Q01378461-S6
08/28/2026
Objection resolved — Resolved
08/28/2026
Objection resolved — Resolved
08/17/2026
Filed — New Building
INSTALL HOUSE CONNECTION FOR DEP: SD1&2 ONLY
Q01378461-P1
08/17/2026
Special inspection requirement — Energy Code Compliance Inspections
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/17/2026
Special inspection requirement — Maintenance information
08/17/2026
Special inspection requirement — Energy Code Compliance Inspections
08/17/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
08/17/2026
Special inspection requirement — Sprinkler Systems
08/17/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
08/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/17/2026
Special inspection requirement — Sprinkler Systems
08/17/2026
Special inspection requirement — Maintenance information
08/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/07/2026
Objection resolved — Resolved
08/06/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/03/2026
Filed — New Building
INSTALL HOUSE CONNECTION FOR DEP: SD1&2 ONLY
Q01378461-S5
07/02/2026
Special inspection requirement — Protection of exposed foundation insulation
07/02/2026
Special inspection requirement — Metering
06/17/2026
Objection resolved — Resolved
06/17/2026
Objection resolved — Resolved
06/17/2026
Objection resolved — Resolved
04/14/2026
Objection raised — Admin
04/14/2026
Objection raised — Energy
04/14/2026
Objection raised — Other
04/14/2026
Objection raised — Structural
04/14/2026
Objection raised — Zoning
04/14/2026
Objection raised — Other
03/28/2026
Filed — New Building
INSTALL HOUSE CONNECTION FOR DEP: SD1&2 ONLY
Q01378461-I1
03/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/28/2026
Special inspection requirement — Insulation placement and R values
03/28/2026
Special inspection requirement — Air barrier - visual inspection
03/28/2026
Special inspection requirement — Air barrier — testing
03/28/2026
Special inspection requirement — Electric vehicle service equipment requirements
03/28/2026
Special inspection requirement — Fenestration areas
03/28/2026
Special inspection requirement — Interior lighting power
03/28/2026
Special inspection requirement — Permanent certificate
03/28/2026
Special inspection requirement — Maintenance information
03/28/2026
Special inspection requirement — Subgrade Inspections
03/28/2026
Special inspection requirement — Energy Code Compliance Inspections
01/12/2026
Objection raised — Admin
01/12/2026
Objection raised — Zoning
01/12/2026
Objection raised — Plumbing
01/11/2026
Filed — New Building
INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS
Q01344869-I1
01/11/2026
Filed — New Building
INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS
Q01344869-S4
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
5765 73RD PL609/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMERILAND BROOK LLC309/14/2026
BRIAN ILL DEVELOPMENT LLC308/17/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERILAND BROOK LLC203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506101/11/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
08/17/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
08/17/2026Fire-Resistant Penetrations and Joints—special
08/17/2026Sprinkler Systems—special
08/17/2026Energy Code Compliance Inspections—progress
08/17/2026HVAC-R and service water piping design and insulation—energy_progress
08/17/2026Maintenance information—energy_progress
08/17/2026HVAC-R and service water heating system controls—energy_progress
08/17/2026HVAC-R and service water heating equipment—energy_progress
08/17/2026Maintenance information—energy_progress
08/17/2026HVAC-R and service water piping design and insulation—energy_progress
08/17/2026HVAC-R and service water heating system controls—energy_progress
08/17/2026HVAC-R and service water heating equipment—energy_progress
08/17/2026Energy Code Compliance Inspections—progress
08/17/2026Sprinkler Systems—special
08/17/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
08/17/2026Fire-Resistant Penetrations and Joints—special
08/06/2026Subsurface Investigations (Borings/Test Pits)—special
07/02/2026Protection of exposed foundation insulation—energy_progress
07/02/2026Metering—energy_progress
03/28/2026Fenestration and door U-factor and product ratings—energy_progress
03/28/2026Concrete - Cast-In-Place—special
03/28/2026Fire-Resistant Penetrations and Joints—special
03/28/2026Heating Systems—special
03/28/2026Masonry—special
03/28/2026Subgrade Inspections—special
Latest 25 of 66.
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026Q01378461-I1Request digital key ↗
08/17/2026Q01378461-S6Request digital key ↗
08/17/2026Q01378461-S5Request digital key ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/17/2026Q01378461-I1Open ↗
08/13/2026Q01344869-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/17/2026Q01378461-I1Open ↗
08/13/2026Q01344869-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026Q01378461-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/19/2026Q01378461-P1Open ↗
08/17/2026Q01378461-S6Open ↗
08/17/2026Q01378461-S5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026Q01344869-I1Open ↗
08/25/2026Q01344869-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026Q01344869-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/17/2026Q01378461-I1Open ↗
08/13/2026Q01344869-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/17/2026Q01378461-I1Open ↗
▸DOB NOWSOIL REPORT1
08/17/2026Q01378461-I1Open ↗
▸Other Documents5
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/17/2026Q01378461-I1Open ↗
08/13/2026Q01344869-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/17/2026Q01378461-I1Open ↗
08/13/2026Q01344869-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026Q01378461-I1Open ↗