← Back
QUEENS
20-02 154 STREET
QUEENS · BIN 4626000
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 1 filing · 20 docs
Floor 2Under Construction9p · 1 filing · 20 docs
Floor 1Under Construction9p · 1 filing · 20 docs
CellarUnder Construction11p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.408/24/2026
MEI ARCHITECT PLLC103/12/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALPHA HOME DESIGN LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&L CONSTRUCTION DEVELOPGeneral Contractor507/31/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES7495108/24/2026
MEHDI GHAZI, P.E. P.C.7129307/21/2026
Building Lifecycle
All (43)Filed (5)Permit Issued (5)Inspection (2)Objection (1)Special Inspection (30)
08/24/2026
Filed — New Building
INSTALLATION OF STRUCTURAL FRAMING AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01367222-S3
08/06/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/30/2026
Permit issued — Mechanical Systems
Q01367222-I1-GC
07/30/2026
Permit issued — Foundation
Q01367222-S1-FO-EA
07/30/2026
Permit issued — General Construction
Q01367222-I1-MS
07/29/2026
Permit issued — Structural
Q01367222-S2-ST
07/21/2026
Filed — New Building
INSTALLATION OF STRUCTURAL FRAMING AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01367222-S1
07/21/2026
Filed — New Building
INSTALLATION OF STRUCTURAL FRAMING AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01367222-S2
07/20/2026
Special inspection requirement — Structural Wood Frame
MEHDI GHAZI
07/20/2026
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
07/20/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MEHDI GHAZI
07/20/2026
Special inspection requirement — Subgrade Inspections
MEHDI GHAZI
07/20/2026
Special inspection requirement — Masonry
MEHDI GHAZI
07/20/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
07/19/2026
Special inspection requirement — Final
MEHDI GHAZI
07/19/2026
Special inspection requirement — Final
MEHDI GHAZI
07/19/2026
Special inspection requirement — Footing and Foundation
MEHDI GHAZI
06/05/2026
Permit issued — Construction Fence
Q01367555-I1-FN
05/29/2026
Filed — Alteration
Q01367555-I1
03/30/2026
Objection raised — Other
03/12/2026
Filed — New Building
INSTALLATION OF STRUCTURAL FRAMING AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01367222-I1
03/04/2026
Special inspection requirement — Maintenance information
MEHDI GHAZI
03/04/2026
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
03/04/2026
Special inspection requirement — Metering
MEHDI GHAZI
03/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
03/04/2026
Special inspection requirement — Air barrier - visual inspection
MEHDI GHAZI
03/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MEHDI GHAZI
03/04/2026
Special inspection requirement — Permanent certificate
MEHDI GHAZI
03/04/2026
Special inspection requirement — Fenestration areas
MEHDI GHAZI
03/04/2026
Special inspection requirement — Protection of exposed foundation insulation
MEHDI GHAZI
03/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
03/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
03/04/2026
Special inspection requirement — Ventilation and air distribution system
MEHDI GHAZI
03/04/2026
Special inspection requirement — Duct leakage testing, insulation and design
MEHDI GHAZI
03/04/2026
Special inspection requirement — Interior lighting power
MEHDI GHAZI
03/04/2026
Special inspection requirement — Electric vehicle service equipment requirements
MEHDI GHAZI
03/04/2026
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
03/04/2026
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
03/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
03/04/2026
Special inspection requirement — Heating Systems
MEHDI GHAZI
03/04/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
03/04/2026
Special inspection requirement — Final
MEHDI GHAZI
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedL&L CONSTRUCTION DEVELOP07/30/2026
DOB NOWFoundationPermit IssuedL&L CONSTRUCTION DEVELOP07/30/2026
DOB NOWGeneral ConstructionPermit IssuedL&L CONSTRUCTION DEVELOP07/30/2026
DOB NOWStructuralPermit IssuedL&L CONSTRUCTION DEVELOP07/29/2026
DOB NOWConstruction FencePermit IssuedL&L CONSTRUCTION DEVELOP06/05/2026
1 project · most recent 08/24/2026
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
08/24/2026——Plumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 08/24/2026
Masonry Wood
FiledStatusContractorScope
08/24/2026Permit IssuedL&L CONSTRUCTION DEVELOPMasonry, Wood
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/06/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/06/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
07/20/2026Structural Wood FrameMEHDI GHAZIprogress
07/20/2026Concrete - Cast-In-PlaceMEHDI GHAZIspecial
07/20/2026Excavations - Sheeting, Shoring, and BracingMEHDI GHAZIspecial
07/20/2026Subgrade InspectionsMEHDI GHAZIspecial
07/20/2026MasonryMEHDI GHAZIspecial
07/20/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
07/19/2026FinalMEHDI GHAZIprogress
07/19/2026FinalMEHDI GHAZIprogress
07/19/2026Footing and FoundationMEHDI GHAZIprogress
03/04/2026Maintenance informationMEHDI GHAZIenergy_progress
03/04/2026Fenestration air leakageMEHDI GHAZIenergy_progress
03/04/2026MeteringMEHDI GHAZIenergy_progress
03/04/2026HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
03/04/2026Air barrier - visual inspectionMEHDI GHAZIenergy_progress
03/04/2026Fenestration and door U-factor and product ratingsMEHDI GHAZIenergy_progress
03/04/2026Permanent certificateMEHDI GHAZIenergy_progress
03/04/2026Fenestration areasMEHDI GHAZIenergy_progress
03/04/2026Protection of exposed foundation insulationMEHDI GHAZIenergy_progress
03/04/2026HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
03/04/2026HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
03/04/2026Ventilation and air distribution systemMEHDI GHAZIenergy_progress
03/04/2026Duct leakage testing, insulation and designMEHDI GHAZIenergy_progress
03/04/2026Interior lighting powerMEHDI GHAZIenergy_progress
03/04/2026Electric vehicle service equipment requirementsMEHDI GHAZIenergy_progress
03/04/2026Insulation placement and R valuesMEHDI GHAZIenergy_progress
Latest 25 of 33.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/17/2026Q01367222-I1Request digital key ↗
08/17/2026Q01367222-S2Request digital key ↗
08/17/2026Q01367222-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026Q01367222-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026Q01367222-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026Q01367222-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/17/2026Q01367222-I1Open ↗
08/17/2026Q01367222-S4Open ↗
08/17/2026Q01367222-S3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/27/2026Q01367222-S1Open ↗
08/27/2026Q01367222-S1Open ↗
08/26/2026Q01367222-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/27/2026Q01367222-S1Open ↗
08/26/2026Q01367222-I1Open ↗
08/26/2026Q01367222-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist1
08/17/2026Q01367222-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026Q01367222-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/17/2026Q01367222-S1Open ↗
08/17/2026Q01367222-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/17/2026Q01367222-S1Open ↗
08/17/2026Q01367222-I1Open ↗
▸Other Documents4
▸DOB NOWSite Survey: Initial1
08/17/2026Q01367222-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026Q01367222-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/17/2026Q01367222-S1Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026Q01367222-I1Open ↗