← Back
QUEENS
20-03 MURRAY STREET
QUEENS · BIN 4626026
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
20-05 MURRAY ST507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BRIAN ILL DEVELOPMENT LLC306/25/2026
AMERILAND BROOK LLC204/18/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STREAM ROCK CONTSRUCTION*General Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506204/19/2026
BRIAN ILL DEVELOPMENT LLC1402104/19/2026
Building Lifecycle
All (19)Filed (5)Permit Issued (1)Objection (4)Special Inspection (9)
06/25/2026
Filed — New Building
INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS
Q01389439-S5
06/01/2026
Permit issued — Construction Fence
Q01389439-S2-FN
04/30/2026
Objection raised — Other
04/22/2026
Objection raised — Structural
04/22/2026
Objection raised — Structural
04/22/2026
Objection raised — RP602 missing
04/19/2026
Filed — New Building
INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS
Q01389439-S4
04/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
04/19/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BRIAN ILL
04/19/2026
Special inspection requirement — Sprinkler Systems
XIAOHONG ZHAO
04/19/2026
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
04/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ILL
04/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ILL
04/19/2026
Special inspection requirement — Maintenance information
BRIAN ILL
04/19/2026
Special inspection requirement — Permanent certificate
BRIAN ILL
04/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ILL
04/18/2026
Filed — New Building
INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS
Q01389439-S1
04/18/2026
Filed — New Building
INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS
Q01389439-I1
04/18/2026
Filed — New Building
INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS
Q01389439-S2
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedSTREAM ROCK CONTSRUCTION*06/01/2026
1 project · most recent 06/25/2026
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/25/2026Permit IssuedSTREAM ROCK CONTSRUCTION*Heating Systems
Heating
Rheem PROPE50 M2 RH92 CS 40,000 BTU · Water Heater ×2
1 project · most recent 06/25/2026
Sprinkler System
FiledStatusContractorScope
06/25/2026——Sprinkler System
1 project · most recent 06/25/2026
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
06/25/2026——Plumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 06/25/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
06/25/2026Permit IssuedSTREAM ROCK CONTSRUCTION*Steel, Concrete, Masonry, Wood
1 project · most recent 06/25/2026
Fence
FiledStatusContractorScope
06/25/2026Permit IssuedSTREAM ROCK CONTSRUCTION*Fence
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
04/19/2026Fire-Resistant Penetrations and JointsBRIAN ILLspecial
04/19/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBRIAN ILLspecial
04/19/2026Sprinkler SystemsXIAOHONG ZHAOspecial
04/19/2026Energy Code Compliance InspectionsBRIAN ILLprogress
04/19/2026HVAC-R and service water heating equipmentBRIAN ILLenergy_progress
04/19/2026HVAC-R and service water heating system controlsBRIAN ILLenergy_progress
04/19/2026Maintenance informationBRIAN ILLenergy_progress
04/19/2026Permanent certificateBRIAN ILLenergy_progress
04/19/2026HVAC-R and service water piping design and insulationBRIAN ILLenergy_progress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/17/2026Q01389439-S2Request digital key ↗
08/17/2026Q01389439-S1Request digital key ↗
08/17/2026Q01389439-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/17/2026Q01389439-I1Open ↗
08/13/2026Q01389439-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q01389439-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01389439-I1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
08/26/2026Q01389439-S4Open ↗
08/26/2026Q01389439-S4Open ↗
08/26/2026Q01389439-S4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026Q01389439-S2Open ↗
08/17/2026Q01389439-S1Open ↗
08/17/2026Q01389439-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q01389439-S4Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/17/2026Q01389439-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01389439-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT2
08/17/2026Q01389439-S1Open ↗
08/17/2026Q01389439-I1Open ↗
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/17/2026Q01389439-I1Open ↗
08/13/2026Q01389439-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01389439-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026Q01389439-I1Open ↗