← Back
QUEENS
33-11 BELL BOULEVARD
QUEENS · BIN 4626049
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 1 filing · 16 docs
Floor 2Under Construction13p · 1 filing · 16 docs
Floor 1Under Construction12p · 1 filing · 16 docs
CellarUnder Construction13p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3315 BELL609/18/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.208/17/2026
MEI ARCHITECT PLLC104/24/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STREAM ROCK CONTSRUCTION*General Contractor409/18/2026
Building Lifecycle
All (43)Filed (3)Permit Issued (4)Objection (6)Special Inspection (30)
09/17/2026
Permit issued — Foundation
Q01391484-S1-FO-EA
09/17/2026
Permit issued — General Construction
Q01391484-I1-MS
09/17/2026
Permit issued — Mechanical Systems
Q01391484-I1-GC
09/16/2026
Permit issued — Structural
Q01391484-S2-ST
08/17/2026
Filed — New Building
PROPOSED A NEW 2-STORY RESIDENCE FOR A SINGLE-FAMILY DETACHED RESIDENCE WITH AN ANCILLARY DWELLING UNIT. PROPOSED ADU LOCATED AT THE REAR OF THE 1ST FLOOR WITH THE MAIN ENTRANCE FACING THE REAR YARD. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01391484-S2
08/16/2026
Filed — New Building
PROPOSED A NEW 2-STORY RESIDENCE FOR A SINGLE-FAMILY DETACHED RESIDENCE WITH AN ANCILLARY DWELLING UNIT. PROPOSED ADU LOCATED AT THE REAR OF THE 1ST FLOOR WITH THE MAIN ENTRANCE FACING THE REAR YARD. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01391484-S1
08/11/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
08/11/2026
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
08/11/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MEHDI GHAZI
08/11/2026
Special inspection requirement — Subgrade Inspections
MEHDI GHAZI
08/10/2026
Special inspection requirement — Final
08/10/2026
Special inspection requirement — Footing and Foundation
05/07/2026
Objection raised — Other
05/07/2026
Objection raised — Other
05/07/2026
Objection raised — Other
05/07/2026
Objection raised — Other
05/07/2026
Objection raised — Other
05/07/2026
Objection raised — Other
04/24/2026
Filed — New Building
PROPOSED A NEW 2-STORY RESIDENCE FOR A SINGLE-FAMILY DETACHED RESIDENCE WITH AN ANCILLARY DWELLING UNIT. PROPOSED ADU LOCATED AT THE REAR OF THE 1ST FLOOR WITH THE MAIN ENTRANCE FACING THE REAR YARD. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01391484-I1
04/22/2026
Special inspection requirement — Mechanical Systems
04/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/22/2026
Special inspection requirement — Heating Systems
04/22/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
04/22/2026
Special inspection requirement — Final
04/22/2026
Special inspection requirement — Energy Code Compliance Inspections
04/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
04/22/2026
Special inspection requirement — Air barrier — testing
04/22/2026
Special inspection requirement — Maintenance information
04/22/2026
Special inspection requirement — Duct leakage testing, insulation and design
04/22/2026
Special inspection requirement — Electric vehicle service equipment requirements
04/22/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
04/22/2026
Special inspection requirement — Metering
04/22/2026
Special inspection requirement — Permanent certificate
04/22/2026
Special inspection requirement — Protection of exposed foundation insulation
04/22/2026
Special inspection requirement — Fenestration air leakage
04/22/2026
Special inspection requirement — Fenestration areas
04/22/2026
Special inspection requirement — Air barrier - visual inspection
04/22/2026
Special inspection requirement — Insulation placement and R values
04/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/22/2026
Special inspection requirement — Ventilation and air distribution system
04/22/2026
Special inspection requirement — Interior lighting power
04/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
04/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedSTREAM ROCK CONTSRUCTION*09/17/2026
DOB NOWGeneral ConstructionPermit IssuedSTREAM ROCK CONTSRUCTION*09/17/2026
DOB NOWMechanical SystemsPermit IssuedSTREAM ROCK CONTSRUCTION*09/17/2026
DOB NOWStructuralPermit IssuedSTREAM ROCK CONTSRUCTION*09/16/2026
1 project · most recent 08/17/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/17/2026Permit IssuedSTREAM ROCK CONTSRUCTION*Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM60NL 60,000 BTU · Heat Pump Outdoor ×2
MXZ-SM36NLHZ 36,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 08/17/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
08/17/2026Permit IssuedSTREAM ROCK CONTSRUCTION*Steel, Concrete, Masonry, Wood
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
08/11/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
08/11/2026Concrete - Cast-In-PlaceMEHDI GHAZIspecial
08/11/2026Excavations - Sheeting, Shoring, and BracingMEHDI GHAZIspecial
08/11/2026Subgrade InspectionsMEHDI GHAZIspecial
08/10/2026Final—progress
08/10/2026Footing and Foundation—progress
04/22/2026Mechanical Systems—special
04/22/2026Fire-Resistant Penetrations and Joints—special
04/22/2026Heating Systems—special
04/22/2026Subsurface Investigations (Borings/Test Pits)—special
04/22/2026Final—progress
04/22/2026Energy Code Compliance Inspections—progress
04/22/2026Fire-Resistance Rated Construction—progress
04/22/2026Air barrier — testing —energy_progress
04/22/2026Maintenance information—energy_progress
04/22/2026Duct leakage testing, insulation and design—energy_progress
04/22/2026Electric vehicle service equipment requirements—energy_progress
04/22/2026Fenestration and door U-factor and product ratings—energy_progress
04/22/2026Metering—energy_progress
04/22/2026Permanent certificate—energy_progress
04/22/2026Protection of exposed foundation insulation—energy_progress
04/22/2026Fenestration air leakage—energy_progress
04/22/2026Fenestration areas—energy_progress
04/22/2026Air barrier - visual inspection—energy_progress
04/22/2026Insulation placement and R values—energy_progress
Latest 25 of 30.
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/29/2026Q01391484-S2Request digital key ↗
08/29/2026Q01391484-S1Request digital key ↗
08/29/2026Q01391484-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/29/2026Q01391484-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/29/2026Q01391484-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/29/2026Q01391484-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/29/2026Q01391484-I1Open ↗
08/18/2026Q01391484-S1Open ↗
08/18/2026Q01391484-S2Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/29/2026Q01391484-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT3
08/29/2026Q01391484-S1Open ↗
08/29/2026Q01391484-I1Open ↗
08/18/2026Q01391484-S1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/29/2026Q01391484-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/29/2026Q01391484-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/29/2026Q01391484-I1Open ↗