← Back
QUEENS
165-16 HORACE HARDING EXPRESSWAY
QUEENS · BIN 4626055
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructural
Roof1p · 1 filing · 14 docs
Floor 22p · 1 filing · 14 docs
Floor 1
Cellar1p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEVELOPMENT 166209/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMERILAND BROOK LLC205/18/2026
CELTIC WAY CONSULTING LLC1—
Building Lifecycle
All (32)Filed (2)Objection (6)Special Inspection (24)
08/13/2026
Objection resolved — Resolved
06/15/2026
Objection raised — Fire_Protection
06/15/2026
Objection raised — Zoning
06/15/2026
Objection raised — Inspections
06/15/2026
Objection raised — Scope
05/29/2026
Special inspection requirement — Protection of exposed foundation insulation
05/25/2026
Objection raised — Other
05/18/2026
Filed — New Building
FILE FOUNDATION AND EARTH WORK IN CONJUNCTION WITH JOB#Q01403373
Q01403373-S1
05/17/2026
Filed — New Building
FILE FOUNDATION AND EARTH WORK IN CONJUNCTION WITH JOB#Q01403373
Q01403373-I1
05/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
05/17/2026
Special inspection requirement — Duct leakage testing, insulation and design
05/17/2026
Special inspection requirement — Fenestration areas
05/17/2026
Special inspection requirement — Interior lighting power
05/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/17/2026
Special inspection requirement — Maintenance information
05/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/17/2026
Special inspection requirement — Metering
05/17/2026
Special inspection requirement — Air barrier — testing
05/17/2026
Special inspection requirement — Insulation placement and R values
05/17/2026
Special inspection requirement — Fenestration air leakage
05/17/2026
Special inspection requirement — Air barrier - visual inspection
05/17/2026
Special inspection requirement — Ventilation and air distribution system
05/17/2026
Special inspection requirement — Permanent certificate
05/17/2026
Special inspection requirement — Mechanical Systems
05/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/17/2026
Special inspection requirement — Heating Systems
05/17/2026
Special inspection requirement — Final
05/17/2026
Special inspection requirement — Energy Code Compliance Inspections
05/17/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
05/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/17/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Nothing on file for this building.
1 project · most recent 05/18/2026
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
05/18/2026——Heating Systems
Heating
Rheem PROPE50 M2 RH92 CS 40,000 BTU · Electric Heater ×3
1 project · most recent 05/18/2026
FiledStatusContractorScope
05/18/2026——3 scope_items
1 project · most recent 05/18/2026
Fence
FiledStatusContractorScope
05/18/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
05/29/2026Protection of exposed foundation insulation—energy_progress
05/17/2026Fenestration and door U-factor and product ratings—energy_progress
05/17/2026Duct leakage testing, insulation and design—energy_progress
05/17/2026Fenestration areas—energy_progress
05/17/2026Interior lighting power—energy_progress
05/17/2026HVAC-R and service water piping design and insulation—energy_progress
05/17/2026HVAC-R and service water heating equipment—energy_progress
05/17/2026Maintenance information—energy_progress
05/17/2026HVAC-R and service water heating system controls—energy_progress
05/17/2026Metering—energy_progress
05/17/2026Air barrier — testing —energy_progress
05/17/2026Insulation placement and R values—energy_progress
05/17/2026Fenestration air leakage—energy_progress
05/17/2026Air barrier - visual inspection—energy_progress
05/17/2026Ventilation and air distribution system—energy_progress
05/17/2026Permanent certificate—energy_progress
05/17/2026Mechanical Systems—special
05/17/2026Fire-Resistant Penetrations and Joints—special
05/17/2026Heating Systems—special
05/17/2026Final—progress
05/17/2026Energy Code Compliance Inspections—progress
05/17/2026Excavations - Sheeting, Shoring, and Bracing—special
05/17/2026Fire-Resistance Rated Construction—progress
05/17/2026Subsurface Investigations (Borings/Test Pits)—special
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/29/2026Q01403373-S1Request digital key ↗
08/16/2026Q01403373-S1Request digital key ↗
08/14/2026Q01403373-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026Q01403373-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026Q01403373-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/14/2026Q01403373-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026Q01403373-I1Open ↗
08/16/2026Q01403373-S1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/14/2026Q01403373-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/16/2026Q01403373-S1Open ↗
▸DOB NOWSOIL REPORT1
08/16/2026Q01403373-S1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/14/2026Q01403373-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/14/2026Q01403373-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026Q01403373-I1Open ↗