338 BEACH 46 STREET
QUEENS · BIN 4626153
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
Civil
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
1 job · most recent 05/04/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/04/2026Signed-offCHAIT BUILDERS INCHeating and Air Conditioning Systems
Heat / Cool
Aux Cloud Commerce ahu30hpv1ao 30,000 BTU · Rooftop Unit ×4
1 job · most recent 05/04/2026
Sprinkler System
FiledStatusContractorScope
05/04/2026——Sprinkler System
1 job · most recent 05/04/2026
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
05/04/2026Signed-offD & G PLUMBING CO. INCPlumbing-Sprinkler, Storm, Water/Sanitary
1 job · most recent 05/04/2026
Wood
FiledStatusContractorScope
05/04/2026Signed-offCHAIT BUILDERS INCWood
Building Lifecycle
All (53)Filed (5)Permit Issued (4)Signed Off (2)Inspection (8)Objection (4)Special Inspection (30)
07/09/2026
Signed off — New Building
Proposed 10' curb cut for new 2 family dwelling
Q01132661-S2
05/19/2026
Signed off — New Building
Proposed 10' curb cut for new 2 family dwelling
Q01132661-S1
05/06/2026
Objection resolved — Addressed
05/05/2026
Objection raised — Other
05/04/2026
Filed — New Building
Proposed 10' curb cut for new 2 family dwelling
Q01132661-P2
04/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/30/2026
Special inspection requirement — Concrete - Cast-In-Place
PAUL MARINO
04/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
04/30/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
PAUL MARINO
04/30/2026
Special inspection requirement — Heating Systems
PAUL MARINO
04/30/2026
Special inspection requirement — Mechanical Systems
PAUL MARINO
04/30/2026
Special inspection requirement — Wood – Prefabricated I-Joists
PAUL MARINO
04/30/2026
Special inspection requirement — Designated Seismic System
04/30/2026
Special inspection requirement — Wood – Seismic Resistance
04/30/2026
Special inspection requirement — Final
Victor Filletti
04/30/2026
Special inspection requirement — Footing and Foundation
PAUL MARINO
04/30/2026
Special inspection requirement — Lowest Floor Elevation
PAUL MARINO
04/30/2026
Special inspection requirement — Structural Wood Frame
PAUL MARINO
04/30/2026
Special inspection requirement — Air barrier — testing
PAUL MARINO
04/30/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
PAUL MARINO
04/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
PAUL MARINO
04/30/2026
Special inspection requirement — Permanent certificate
PAUL MARINO
04/30/2026
Special inspection requirement — Air barrier - visual inspection
PAUL MARINO
04/30/2026
Special inspection requirement — Ventilation and air distribution system
PAUL MARINO
04/30/2026
Special inspection requirement — Fenestration areas
PAUL MARINO
04/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL MARINO
04/30/2026
Special inspection requirement — Duct leakage testing, insulation and design
PAUL MARINO
04/30/2026
Special inspection requirement — Fenestration air leakage
PAUL MARINO
04/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
PAUL MARINO
04/30/2026
Special inspection requirement — Insulation placement and R values
PAUL MARINO
04/30/2026
Special inspection requirement — Electric vehicle service equipment requirements
PAUL MARINO
04/30/2026
Special inspection requirement — Interior lighting power
PAUL MARINO
04/30/2026
Special inspection requirement — Metering
PAUL MARINO
04/29/2026
Permit issued — Curb Cut
Q01132661-S2-CC
04/09/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PAUL MARINO
04/09/2026
Special inspection requirement — Sprinkler Systems
PAUL MARINO
04/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
PAUL MARINO
04/08/2026
Objection resolved — Addressed
04/04/2026
Objection raised — Other
03/31/2026
Filed — New Building
Proposed 10' curb cut for new 2 family dwelling
Q01132661-P1
03/04/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/27/2026
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
12/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
11/07/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
10/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/15/2025
Permit issued — Earth Work
Q01132661-I1-GC-CX
09/11/2025
Permit issued — Plumbing
Q01132661-S1-PL
06/27/2025
Permit issued — Earth Work
Q01132661-I1-GC-CX
06/04/2025
Filed — New Building
Proposed 10' curb cut for new 2 family dwelling
Q01132661-S2
11/26/2024
Filed — New Building
Proposed 10' curb cut for new 2 family dwelling
Q01132661-S1
11/26/2024
Filed — New Building
Proposed 10' curb cut for new 2 family dwelling
Q01132661-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHAIT BUILDERS208/29/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
T.F. CUSANELLI & FILLETTI ARCH505/04/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING CONSULTING SE2050405/04/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offCHAIT BUILDERS INC04/29/2026
DOB NOWEarth WorkPermit IssuedCHAIT BUILDERS INC09/15/2025
DOB NOWPlumbingSigned-offD & G PLUMBING CO. INC09/11/2025
DOB NOWEarth WorkPermit IssuedCHAIT BUILDERS INC06/27/2025
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/04/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/27/2026Fail-Final PL - Up to 9 Requested FloorsFailView ↗
12/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/20/2025Pass-Final PL - UndergroundPassView ↗
11/07/2025Pass-Final PL - UndergroundPassView ↗
10/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
04/30/2026Concrete - Cast-In-PlacePAUL MARINOspecial
04/30/2026Fire-Resistant Penetrations and JointsPAUL MARINOspecial
04/30/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)PAUL MARINOspecial
04/30/2026Heating SystemsPAUL MARINOspecial
04/30/2026Mechanical SystemsPAUL MARINOspecial
04/30/2026Wood – Prefabricated I-JoistsPAUL MARINOspecial
04/30/2026Designated Seismic System—special
04/30/2026Wood – Seismic Resistance—special
04/30/2026FinalVictor Fillettiprogress
04/30/2026Footing and FoundationPAUL MARINOprogress
04/30/2026Lowest Floor ElevationPAUL MARINOprogress
04/30/2026Structural Wood FramePAUL MARINOprogress
04/30/2026Air barrier — testing PAUL MARINOenergy_progress
04/30/2026Fenestration and door U-factor and product ratingsPAUL MARINOenergy_progress
04/30/2026HVAC-R and service water heating system controlsPAUL MARINOenergy_progress
04/30/2026Permanent certificatePAUL MARINOenergy_progress
04/30/2026Air barrier - visual inspectionPAUL MARINOenergy_progress
04/30/2026Ventilation and air distribution systemPAUL MARINOenergy_progress
04/30/2026Fenestration areasPAUL MARINOenergy_progress
04/30/2026HVAC-R and service water piping design and insulationPAUL MARINOenergy_progress
04/30/2026Duct leakage testing, insulation and designPAUL MARINOenergy_progress
04/30/2026Fenestration air leakagePAUL MARINOenergy_progress
04/30/2026HVAC-R and service water heating equipmentPAUL MARINOenergy_progress
04/30/2026Insulation placement and R valuesPAUL MARINOenergy_progress
04/30/2026Electric vehicle service equipment requirementsPAUL MARINOenergy_progress
Latest 25 of 33.
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/17/2026Q01132661-P1Request digital key ↗
08/17/2026Q01132661-S2Request digital key ↗
08/17/2026Q01132661-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026Q01132661-P2Open ↗
08/13/2026Q01132661-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01132661-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/17/2026Q01132661-I1Open ↗
08/17/2026Q01132661-P2Open ↗
08/17/2026Q01132661-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/27/2026Q01132661-P2Open ↗
08/27/2026Q01132661-P2Open ↗
08/27/2026Q01132661-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026Q01132661-P2Open ↗
08/27/2026Q01132661-P2Open ↗
08/27/2026Q01132661-P2Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q01132661-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/15/2026Q01132661-P2Open ↗
08/13/2026Q01132661-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01132661-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q01132661-I1Open ↗
▸Other Documents6
▸DOB NOWSite Survey: Initial2
08/15/2026Q01132661-P2Open ↗
08/13/2026Q01132661-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/15/2026Q01132661-P2Open ↗
08/13/2026Q01132661-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026Q01132661-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01132661-I1Open ↗