Locations of Work
Structural
Roof1p · 1 filing · 9 docs
Bulkhead2p · 1 filing · 9 docs
Floor 131p · 1 filing · 9 docs
Floor 121p · 1 filing · 9 docs
Floor 111p · 1 filing · 9 docs
Floor 101p · 1 filing · 9 docs
Floor 91p · 1 filing · 9 docs
Floor 81p · 1 filing · 9 docs
Floor 71p · 1 filing · 9 docs
Floor 61p · 1 filing · 9 docs
Floor 51p · 1 filing · 9 docs
Floor 41p · 1 filing · 9 docs
Floor 31p · 1 filing · 9 docs
Floor 21p · 1 filing · 9 docs
Floor 12p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STRUCTURAL ENGINEERING TECHNOLOGIES208/26/2026
ISSAC & STERN ARCHITECTS, P.C107/22/2026
Building Lifecycle
All (34)Filed (3)Objection (3)Special Inspection (28)
08/27/2026
Objection resolved — Open
08/26/2026
Filed — New Building
Support of Excavation work-type filed subsequent to NB GC application: Q01430748-I1.
Q01430748-S3
08/24/2026
Special inspection requirement — Air barrier - visual inspection
08/19/2026
Objection raised — Other
08/04/2026
Objection raised — Other
07/24/2026
Filed — New Building
Support of Excavation work-type filed subsequent to NB GC application: Q01430748-I1.
Q01430748-S1
07/22/2026
Filed — New Building
Support of Excavation work-type filed subsequent to NB GC application: Q01430748-I1.
Q01430748-I1
07/17/2026
Special inspection requirement — Concrete - Cast-In-Place
07/17/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
07/17/2026
Special inspection requirement — Post-installed Anchors
07/17/2026
Special inspection requirement — Structural Steel - Details
07/17/2026
Special inspection requirement — Structural Steel - Welding
07/17/2026
Special inspection requirement — Subgrade Inspections
07/17/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
07/17/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
07/15/2026
Special inspection requirement — Electrical motors and elevators
07/15/2026
Special inspection requirement — Interior lighting power
07/15/2026
Special inspection requirement — Exterior lighting power
07/15/2026
Special inspection requirement — Lighting controls
07/15/2026
Special inspection requirement — Maintenance information
07/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/15/2026
Special inspection requirement — Protection of exposed foundation insulation
07/15/2026
Special inspection requirement — Fenestration air leakage
07/15/2026
Special inspection requirement — Fenestration areas
07/15/2026
Special inspection requirement — Metering
07/15/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
07/15/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
07/15/2026
Special inspection requirement — Sprayed fire-resistant materials
07/15/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
07/15/2026
Special inspection requirement — Energy Code Compliance Inspections
07/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/15/2026
Special inspection requirement — Air barrier continuity plan testing
07/15/2026
Special inspection requirement — Insulation placement and R values
07/15/2026
Special inspection requirement — Lighting in dwelling units
Nothing on file for this building.
1 project · most recent 08/26/2026
FiledStatusContractorScope
08/26/2026——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
08/24/2026Air barrier - visual inspection—energy_progress
07/17/2026Concrete - Cast-In-Place—special
07/17/2026Excavations - Sheeting, Shoring, and Bracing—special
07/17/2026Post-installed Anchors—special
07/17/2026Structural Steel - Details—special
07/17/2026Structural Steel - Welding—special
07/17/2026Subgrade Inspections—special
07/17/2026Subsurface Conditions – Fill Placement & In-Place Density—special
07/17/2026Subsurface Investigations (Borings/Test Pits)—special
07/15/2026Electrical motors and elevators—energy_progress
07/15/2026Interior lighting power—energy_progress
07/15/2026Exterior lighting power—energy_progress
07/15/2026Lighting controls—energy_progress
07/15/2026Maintenance information—energy_progress
07/15/2026Fire-Resistant Penetrations and Joints—special
07/15/2026Protection of exposed foundation insulation—energy_progress
07/15/2026Fenestration air leakage—energy_progress
07/15/2026Fenestration areas—energy_progress
07/15/2026Metering—energy_progress
07/15/2026Fenestration and door U-factor and product ratings—energy_progress
07/15/2026Exterior Insulation and Finish Systems (EIFS)—special
07/15/2026Sprayed fire-resistant materials—special
07/15/2026Wall Panels, Curtain Walls, and Veneers—special
07/15/2026Energy Code Compliance Inspections—progress
07/15/2026Fire-Resistance Rated Construction—progress
Latest 25 of 28.
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/16/2026Q01430748-I1Request digital key ↗
08/16/2026Q01430748-S3Request digital key ↗
08/15/2026Q01430748-S1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026Q01430748-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026Q01430748-S1Open ↗
08/16/2026Q01430748-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/16/2026Q01430748-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/16/2026Q01430748-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/16/2026Q01430748-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026Q01430748-I1Open ↗