← Back
Building
253-06 ROCKAWAY BOULEVARD
BIN 4831711
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Roof1p · 1 filing · 4 docs
Floor 16p · 2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REGATTA PROPERTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ST DESIGN & CONSULTING INC.412/20/2021
ASHRAF CORP112/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
R H DRUMMOND EXP803/21/2026
AN TONG FAN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRINCITY ELECTRIC, INCElectrical103/22/2026
R A GENERAL CONTRACTING IGeneral Contractor107/08/2026
M & M PIPING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LIGHTHOUSE5538212/20/2021
ASHRAF CORPORATION1973112/12/2021
Building Lifecycle
All (20)Filed (5)Permit Issued (2)Signed Off (2)Inspection (4)Special Inspection (7)
02/03/2022
Signed off — Alteration
application filed to install plumbing fixtures convert the retail store to the restaurant as per plan. no change in use, egress or occupancy.
Q00467232-I1
02/03/2022
Signed off — Alteration
Application filed for interior renovation to convert an existing retail store (use group 6) to the restaurant (use group 6A) as per plan, no change in use., egress or occupancy.
Q00466979-I1
01/04/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/28/2021
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/27/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMIR ABDALLA
12/27/2021
Special inspection requirement — Lighting in dwelling units
SAMIR ABDALLA
12/20/2021
Filed — Alteration
Application filed for interior renovation to convert an existing retail store (use group 6) to the restaurant (use group 6A) as per plan, no change in use., egress or occupancy.
Q00466979-P1
12/20/2021
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/12/2021
Filed — Alteration
FILING FOR THE NEW KITCHEN HOOD, EXHAUST FAN AND ASSOCIATED DUCT WORK AS PER PLAN SHOWS, THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00638020-I1
12/09/2021
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/28/2021
Special inspection requirement — Final
Jay Kavi
11/28/2021
Special inspection requirement — Mechanical Systems
AKM HOQUE
11/28/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM HOQUE
11/09/2021
Permit issued — General Construction
Q00466979-I1-GC
08/24/2021
Filed — Alteration
application filed to install plumbing fixtures convert the retail store to the restaurant as per plan. no change in use, egress or occupancy.
Q00467232-P1
08/23/2021
Special inspection requirement — HVAC-R and service water heating equipment
SAMIR ABDALLA
08/23/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMIR ABDALLA
03/03/2021
Permit issued — Plumbing
Q00467232-I1-PL
02/18/2021
Filed — Alteration
application filed to install plumbing fixtures convert the retail store to the restaurant as per plan. no change in use, egress or occupancy.
Q00467232-I1
02/11/2021
Filed — Alteration
Application filed for interior renovation to convert an existing retail store (use group 6) to the restaurant (use group 6A) as per plan, no change in use., egress or occupancy.
Q00466979-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offR A GENERAL CONTRACTING I11/09/2021
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING03/03/2021
1 project · most recent 12/12/2021
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/12/2021——Ventilation Systems
Ventilation
Dayton 7AT82 3,300 CFM · Exhaust Fan ×1
7HY88 3,135 CFM · Makeup Air ×1
1 project · most recent 01/05/2021
General Wiring
FiledStatusContractorScope
01/05/2021Permit IssuedTRINCITY ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/04/2022Pass-Final General Construction Non-Directive 14PassView ↗
12/28/2021Fail-Final General Construction Non-Directive 14FailView ↗
12/20/2021Fail-Final General Construction Non-Directive 14FailView ↗
12/09/2021Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
12/27/2021Fire-Resistant Penetrations and JointsSAMIR ABDALLAspecial
12/27/2021Lighting in dwelling unitsSAMIR ABDALLAenergy_progress
11/28/2021FinalJay Kaviprogress
11/28/2021Mechanical SystemsAKM HOQUEspecial
11/28/2021Fire-Resistant Penetrations and JointsAKM HOQUEspecial
08/23/2021HVAC-R and service water heating equipmentSAMIR ABDALLAenergy_progress
08/23/2021HVAC-R and service water piping design and insulationSAMIR ABDALLAenergy_progress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - General Construction2
08/26/2026Q00466979-P1Request digital key ↗
08/26/2026Q00466979-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/27/2026Q00467232-I1Request digital key ↗
08/15/2026Q00467232-P1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/26/2026Q00638020-I1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026Q00467232-P1Open ↗
08/27/2026Q00467232-I1Open ↗
08/13/2026Q00638020-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026Q00467232-P1Open ↗
08/25/2026Q00467232-P1Open ↗
08/24/2026Q00466979-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026Q00466979-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026Q00467232-I1Open ↗
08/27/2026Q00467232-P1Open ↗
08/13/2026Q00638020-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00466979-I1Open ↗
08/13/2026Q00467232-I1Open ↗