← Back
One story - permanent living quarter
533 BEACH 72 STREET
QUEENS · BIN 4858257
💬 Discuss this project
1930Year Built
2Stories
A2Building Class
R4AZoning
2,030 sfGross Floor Area
1Units
0 Open Violations
One story - permanent living quarter · 3,185 sf lot · 0.64 FAR built · Flood zone AE
Locations of Work
StructuralPlumbing
Roof2p · 1 filing · 20 docs
Floor 31 filing · 20 docs
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
19 BARBEY2307/08/2026
PROPERTY 1500603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.712/27/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GEREBUZZA CONSTRUCTION INGeneral Contractor907/08/2026
CL ENGINEERING P CGeneral Contractor403/22/2026
INFINITI ESC PLUMBING CORPlumbing407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781512/27/2024
TRIANGLE INSPECTION & TES7495412/27/2024
Building Lifecycle
All (54)Filed (7)Permit Issued (5)Signed Off (3)Violation (1)Inspection (8)Special Inspection (30)
02/20/2025
Signed off — New Building
Q00933396-S3
01/23/2025
Signed off — New Building
Q00933396-S1
01/23/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/10/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/07/2025
Signed off — New Building
Q00933396-S2
12/30/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
12/27/2024
Filed — New Building
Q00933396-P4
12/19/2024
Permit issued — Curb Cut
Q00933396-S3-CC
08/15/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/15/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/15/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/26/2024
Permit issued — Plumbing
Q00933396-S1-PL
06/18/2024
Filed — New Building
Q00933396-P3
06/03/2024
Permit issued — Structural
Q00933396-I1-FO-EA
06/03/2024
Permit issued — Foundation
Q00933396-I1-GC-CX
03/01/2024
Filed — New Building
Q00933396-P1
03/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
03/01/2024
Special inspection requirement — Sprinkler Systems
CHRISTIAN LOZADA
03/01/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
03/01/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
03/01/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
03/01/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
03/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
03/01/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
03/01/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
02/27/2024
Permit issued — Construction Fence
Q00933396-S2-FN
12/22/2023
Filed — New Building
Q00933396-S1
12/01/2023
Filed — New Building
Q00933396-S3
12/01/2023
Filed — New Building
Q00933396-S2
09/20/2023
Filed — New Building
Q00933396-I1
09/20/2023
Special inspection requirement — Structural Cold-Formed Steel
CHRISTIAN LOZADA
09/20/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
09/20/2023
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
09/20/2023
Special inspection requirement — Structural Wood Frame
CHRISTIAN LOZADA
09/20/2023
Special inspection requirement — Structural Steel - High Strength Bolting
CHRISTIAN LOZADA
09/13/2023
Special inspection requirement — Footing and Foundation
CHRISTIAN LOZADA
09/13/2023
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
09/13/2023
Special inspection requirement — Ventilation and air distribution system
CHRISTIAN LOZADA
09/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
09/13/2023
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
09/13/2023
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
09/13/2023
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
09/13/2023
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
09/13/2023
Special inspection requirement — Heating Systems
CHRISTIAN LOZADA
09/13/2023
Special inspection requirement — Air barrier — testing
CHRISTIAN LOZADA
09/13/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
09/13/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
09/13/2023
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
09/13/2023
Special inspection requirement — Electric vehicle service equipment requirements
CHRISTIAN LOZADA
09/13/2023
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
09/13/2023
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
03/29/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offGEREBUZZA CONSTRUCTION IN12/19/2024
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR07/26/2024
DOB NOWStructuralSigned-offGEREBUZZA CONSTRUCTION IN06/03/2024
DOB NOWFoundationPermit IssuedGEREBUZZA CONSTRUCTION IN06/03/2024
DOB NOWConstruction FenceSigned-offGEREBUZZA CONSTRUCTION IN02/27/2024
BISEQISSUEDSHANLIN DEVELOPMENT CORP01/16/2007
BIS—ISSUEDSHANLIN DEVELOPMENT CORP01/16/2007
1 project · most recent 10/17/2024
General Wiring
FiledStatusContractorScope
10/17/2024CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/10/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
12/30/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
08/15/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/15/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/15/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/15/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
03/01/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
03/01/2024Sprinkler SystemsCHRISTIAN LOZADAspecial
03/01/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
03/01/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
03/01/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
03/01/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
03/01/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
03/01/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
03/01/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
09/20/2023Structural Cold-Formed SteelCHRISTIAN LOZADAspecial
09/20/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
09/20/2023Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
09/20/2023Structural Wood FrameCHRISTIAN LOZADAprogress
09/20/2023Structural Steel - High Strength BoltingCHRISTIAN LOZADAspecial
09/13/2023Footing and FoundationCHRISTIAN LOZADAprogress
09/13/2023Interior lighting powerCHRISTIAN LOZADAenergy_progress
09/13/2023Ventilation and air distribution systemCHRISTIAN LOZADAenergy_progress
09/13/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
09/13/2023Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
09/13/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
09/13/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
09/13/2023Fenestration air leakageCHRISTIAN LOZADAenergy_progress
09/13/2023Heating SystemsCHRISTIAN LOZADAspecial
09/13/2023Air barrier — testing CHRISTIAN LOZADAenergy_progress
09/13/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
Latest 25 of 44.
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026Q00933396-S1Request digital key ↗
08/23/2026Q00933396-I1Request digital key ↗
08/23/2026Q00933396-P4Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION7
03/15/2024401837768Open ↗
03/15/2024401859486Open ↗
03/08/2024401859486Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
03/04/2024440816333Open ↗
03/04/2024440816333Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
03/19/2025440816333Open ↗
▸BISApplication Withdrawal/Address Change Form OP-1131
03/15/2024401837768Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/23/2026Q00933396-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/23/2026Q00933396-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026Q00933396-I1Open ↗
08/23/2026Q00933396-P4Open ↗
08/23/2026Q00933396-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026Q00933396-I1Open ↗
08/28/2026Q00933396-I1Open ↗
08/28/2026Q00933396-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026Q00933396-I1Open ↗
08/28/2026Q00933396-I1Open ↗
08/28/2026Q00933396-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/01/2024440816333Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/01/2024440816333Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/23/2026Q00933396-I1Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST1
03/01/2024440816333Open ↗
▸BISSTREET TREE SIGNOFF1
02/20/2025440816333Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/23/2026Q00933396-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/23/2026Q00933396-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/23/2026Q00933396-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/23/2026Q00933396-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/23/2026Q00933396-I1Open ↗
▸DOB NOWSOIL REPORT1
08/23/2026Q00933396-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCURB CUT (CC) SIGNOFF1
02/20/2025440816333Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
03/19/2025440816333Open ↗
▸BISNYS DEC TIDAL WETLANDS APPROVAL1
03/01/2024440816333Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
03/19/2025440816333Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
03/01/2024440816333Open ↗
▸Other Documents17
▸BISBPP - SUPPORTING DOCUMENTATION8
03/19/2025440816333Open ↗
03/19/2025440816333Open ↗
03/19/2025440816333Open ↗
Showing 3 of 8 on file for this type
▸BISNYS DEC TIDAL WETLANDS MAP1
03/01/2024440816333Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
03/01/2024440816333Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/23/2026Q00933396-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/23/2026Q00933396-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/23/2026Q00933396-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/23/2026Q00933396-I1Open ↗
▸DOB NOWTR5H Test Report1
08/23/2026Q00933396-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/23/2026Q00933396-I1Open ↗
▸DOB NOWFinal Survey1
08/23/2026Q00933396-I1Open ↗