← Back
Two stories - detached, small or mid-size
101 SCRIBNER AVENUE
STATEN ISLAND · BIN 5000943
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R3AZoning
1,240 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 3,400 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
H G LEE ARCHITECT PC201/23/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HG LEE ARCHITECT PC2554101/23/2025
RIKE TECH ASSOCIATES LLC2965112/03/2024
Building Lifecycle
All (20)Filed (2)Permit Issued (1)Signed Off (1)Violation (2)Inspection (4)Objection (10)
03/21/2025
Signed off — Alteration
Application herewith filing a post approval amendment for minor changes made to plumbing application as per request by DOB Inspector. Gas meter & Riser information was included in the plumbing scope of work & 1 boiler and 1 hot water heater in gas use.
S01141042-I1
02/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/31/2025
Objection resolved — Addressed
01/24/2025
Objection raised — Scope
01/23/2025
Filed — Alteration
Application herewith filing a post approval amendment for minor changes made to plumbing application as per request by DOB Inspector. Gas meter & Riser information was included in the plumbing scope of work & 1 boiler and 1 hot water heater in gas use.
S01141042-P1
01/21/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/06/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/06/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/26/2024
Permit issued — Plumbing
S01141042-I1-PL
12/16/2024
Objection resolved — Addressed
12/10/2024
Objection resolved — Addressed
12/10/2024
Objection resolved — Addressed
12/10/2024
Objection resolved — Addressed
12/05/2024
Objection raised — Admin
12/05/2024
Objection raised — Scope
12/05/2024
Objection raised — Plumbing
12/05/2024
Objection raised — Scope
12/03/2024
Filed — Alteration
Application herewith filing a post approval amendment for minor changes made to plumbing application as per request by DOB Inspector. Gas meter & Riser information was included in the plumbing scope of work & 1 boiler and 1 hot water heater in gas use.
S01141042-I1
06/23/2010
Violation issued (ECB, closed)
Construction
06/23/2010
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP12/26/2024
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/06/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
01/31/2025Fire-Resistant Penetrations and JointsSYED RIZVIspecial
01/22/2025Fire-Resistant Penetrations and JointsHe Gin Leespecial
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026S01141042-I1Request digital key ↗
08/14/2026S01141042-P1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION4
02/24/2025520051032Open ↗
02/18/2025520051032Open ↗
05/20/2011520051032Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISZRD1-Zoning Resolution Determination1
05/19/2011520051032Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
05/19/2011520051032Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026S01141042-P1Open ↗
08/20/2026S01141042-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026S01141042-P1Open ↗
08/23/2026S01141042-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/25/2010520051032Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING2
04/29/2011520051032Open ↗
10/25/2010520051032Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
10/25/2010520051032Open ↗
▸Environmental & Asbestos1
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/25/2010520051032Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
10/25/2010520051032Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/24/2025520051032Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/29/2011520051032Open ↗
10/25/2010520051032Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
10/25/2010520051032Open ↗