← Back
Building
208 BENZIGER AVENUE
BIN 5000972
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
5 Open Violations ▸FDNY Report ↗
Locations of Work
Roof1p · 1 filing · 13 docs
Floor 21p · 1 filing · 13 docs
Floor 11p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOUSING PRESERVATION DEVELOPMENT1104/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIMKUS105/15/2025
SOUTH BAY ENGINEERING PLLC204/02/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITE DEM403/21/2026
LAKHI GENERAL CONTRACTOR, INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LAKHI GENERAL CONTRACTORGeneral Contractor203/21/2026
STATEWIDE DEMOLITION CORP.General Contractor204/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOUTH BAY ENGINEERING PLL6682103/18/2025
Building Lifecycle
All (16)Filed (3)Permit Issued (3)Signed Off (2)Violation (6)Special Inspection (2)
06/17/2025
Signed off — Full Demolition
installation of construction fence to protect site during full demolition.
S01166208-I1
06/09/2025
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED IN ORDER TO DEMOLISH THE HOUSE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. HEAVY DUTY SHED SHALL COMPLY WITH CH. 33 OF THE 2022 BUILDING CODE. CONSTRUCTION FENCE FILED UNDER SEPERATE APPLICATION.
S01225915-I1
05/16/2025
Permit issued — Sidewalk Shed
S01225915-I1-SH
05/15/2025
Filed — Alteration
HEAVY DUTY SIDEWALK SHED IN ORDER TO DEMOLISH THE HOUSE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. HEAVY DUTY SHED SHALL COMPLY WITH CH. 33 OF THE 2022 BUILDING CODE. CONSTRUCTION FENCE FILED UNDER SEPERATE APPLICATION.
S01225915-I1
05/07/2025
Permit issued — Full Demolition
S01166208-I1-FD
04/07/2025
Permit issued — Construction Fence
S01166208-S1-FN
04/02/2025
Filed — Full Demolition
installation of construction fence to protect site during full demolition.
S01166208-S1
03/18/2025
Filed — Full Demolition
installation of construction fence to protect site during full demolition.
S01166208-I1
01/13/2025
Special inspection requirement — Demolition
Chris Sanders
01/13/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
Chris Sanders
10/03/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/16/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/13/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/04/2009
Violation issued (HPD, open)
A
11/04/2009
Violation issued (HPD, open)
B
09/28/2000
Violation issued (HPD, open)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offLAKHI GENERAL CONTRACTOR05/16/2025
DOB NOWFull DemolitionSigned-offSTATEWIDE DEMOLITION CORP.05/07/2025
DOB NOWConstruction FenceSigned-offSTATEWIDE DEMOLITION CORP.04/07/2025
1 project · most recent 04/02/2025
Fence
FiledStatusContractorScope
04/02/2025Signed-offSTATEWIDE DEMOLITION CORPFence
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
01/13/2025DemolitionChris Sandersspecial
01/13/2025Structural Stability – Alterations of existing BuildingsChris Sandersspecial
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/19/2026S01166208-S1Request digital key ↗
08/19/2026S01166208-I1Request digital key ↗
08/19/2026S01225915-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/19/2026S01166208-S1Open ↗
08/19/2026S01166208-I1Open ↗
08/19/2026S01225915-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026S01166208-I1Open ↗
08/23/2026S01166208-I1Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWElectric Cut-Off1
08/13/2026S01166208-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026S01166208-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026S01166208-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026S01166208-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/19/2026S01166208-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026S01166208-I1Open ↗
▸Other Documents1
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026S01166208-I1Open ↗