← Back
Three families
72 CLINTON AVENUE
STATEN ISLAND · BIN 5001790
💬 Discuss this project
1901Year Built
2.75Stories
C0Building Class
R2Zoning
2,662 sfGross Floor Area
3Units
Three families · 5,550 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof3p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
UNISOLAR105/29/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VILLAGE ELECTL CONTRS INCElectrical103/22/2026
CENTURION SOLAR ENERGYGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURION SOLAR ENERGY LL9475105/29/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
11/25/2025
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
S01211291-I1
06/06/2025
Permit issued — Solar
S01211291-I1-SL
05/29/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
S01211291-I1
04/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andres Arias Londono
04/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Andres Arias Londono
04/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Andres Arias Londono
04/15/2025
Special inspection requirement — Final
Andres Arias Londono
04/15/2025
Special inspection requirement — Air barrier - visual inspection
Andres Arias Londono
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offCENTURION SOLAR ENERGY06/06/2025
2 projects · most recent 06/13/2025
General Wiring
FiledStatusContractorScope
06/13/2025CompleteVILLAGE ELECTL CONTRS INCGeneral Wiring
04/18/2025CompleteBERGER QUALITY ELEC'L CON—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/15/2025Fire-Resistant Penetrations and JointsAndres Arias Londonospecial
04/15/2025Structural Stability – Alterations of existing buildingsAndres Arias Londonospecial
04/15/2025Energy Code Compliance InspectionsAndres Arias Londonoprogress
04/15/2025FinalAndres Arias Londonoprogress
04/15/2025Air barrier - visual inspectionAndres Arias Londonoenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026S01211291-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026S01211291-I1Open ↗
08/25/2026S01211291-I1Open ↗
08/25/2026S01211291-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026S01211291-I1Open ↗
08/25/2026S01211291-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01211291-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01211291-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01211291-I1Open ↗