← Back
Two family converted from one family
26 VAN TUYL STREET
STATEN ISLAND · BIN 5002017
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R3-2Zoning
1,418 sfGross Floor Area
2Units
Rent Stabilized35 Open Violations ▸FDNY Report ↗
Two family converted from one family · Owner of record: 26 VAN TUYL ST VENTURES LLC · 3,300 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar1p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC312/19/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AGIUS PLUMBING & HTG INCPlumbing207/08/2026
J.P.E. ELEC'L CONTR'S INCElectrical103/22/2026
ZAIM CONTRACTOR CORPGeneral Contractor107/08/2026
Building Lifecycle
All (82)Filed (3)Permit Issued (3)Signed Off (3)Violation (60)Inspection (9)Special Inspection (4)
11/26/2025
Violation issued (HPD, open)
I
12/05/2024
Violation issued (HPD, open)
I
11/24/2024
Signed off — Alteration
S00965428-I1
08/07/2024
Signed off — Alteration
RELOCATE 2-GAS METERS IN THE CELLAR, CAP AND REMOVE 2-HWH'S AND 2-BOILERS IN THE CELLAR SPACE AND INSTALL 2- NEW COMBI HEAT / HOT WATER BOILERS IN THE CELLAR SPACE.
S00965419-I1
08/07/2024
Signed off — Alteration
RELOCATE 2-GAS METERS IN THE CELLAR, CAP AND REMOVE 2-HWH'S AND 2-BOILERS IN THE CELLAR SPACE AND INSTALL 2- NEW COMBI HEAT / HOT WATER BOILERS IN THE CELLAR SPACE.
S00965419-S1
07/17/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/03/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Water Test
Certified
View inspection ↗
07/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Water Test
Certified
View inspection ↗
06/19/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/13/2024
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
06/06/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/13/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/04/2024
Permit issued — General Construction
S00965428-I1-GC
02/23/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/23/2024
Permit issued — Plumbing
S00965419-S1-PL
01/23/2024
Permit issued — Plumbing
S00965419-I1-PL
12/19/2023
Filed — Alteration
S00965428-I1
12/19/2023
Filed — Alteration
RELOCATE 2-GAS METERS IN THE CELLAR, CAP AND REMOVE 2-HWH'S AND 2-BOILERS IN THE CELLAR SPACE AND INSTALL 2- NEW COMBI HEAT / HOT WATER BOILERS IN THE CELLAR SPACE.
S00965419-I1
12/19/2023
Filed — Alteration
RELOCATE 2-GAS METERS IN THE CELLAR, CAP AND REMOVE 2-HWH'S AND 2-BOILERS IN THE CELLAR SPACE AND INSTALL 2- NEW COMBI HEAT / HOT WATER BOILERS IN THE CELLAR SPACE.
S00965419-S1
12/19/2023
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
12/19/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
12/19/2023
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
12/15/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
11/30/2023
Violation issued (HPD, open)
I
11/21/2022
Violation issued (HPD, open)
I
09/04/2022
Violation issued (HPD, open)
B
09/04/2022
Violation issued (HPD, open)
C
09/04/2022
Violation issued (HPD, open)
C
09/04/2022
Violation issued (HPD, closed)
B
09/04/2022
Violation issued (HPD, closed)
A
09/04/2022
Violation issued (HPD, closed)
A
09/04/2022
Violation issued (HPD, closed)
A
09/04/2022
Violation issued (HPD, closed)
B
09/04/2022
Violation issued (HPD, closed)
B
09/04/2022
Violation issued (HPD, closed)
B
09/04/2022
Violation issued (HPD, closed)
A
09/04/2022
Violation issued (HPD, closed)
B
09/04/2022
Violation issued (HPD, closed)
A
09/04/2022
Violation issued (HPD, closed)
B
09/04/2022
Violation issued (HPD, closed)
B
09/04/2022
Violation issued (HPD, closed)
A
09/04/2022
Violation issued (HPD, closed)
B
09/04/2022
Violation issued (HPD, closed)
B
09/04/2022
Violation issued (HPD, closed)
B
09/04/2022
Violation issued (HPD, closed)
B
09/04/2022
Violation issued (HPD, closed)
B
09/04/2022
Violation issued (HPD, closed)
B
09/04/2022
Violation issued (HPD, closed)
B
09/04/2022
Violation issued (HPD, closed)
A
09/04/2022
Violation issued (HPD, closed)
A
09/04/2022
Violation issued (HPD, open)
B
09/04/2022
Violation issued (HPD, closed)
A
09/04/2022
Violation issued (HPD, closed)
B
09/04/2022
Violation issued (HPD, open)
C
03/18/2022
Violation issued (HPD, open)
I
04/22/2021
Violation issued (HPD, open)
I
08/10/2020
Violation issued (HPD, open)
A
08/10/2020
Violation issued (HPD, open)
B
08/10/2020
Violation issued (HPD, open)
B
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSUFFOLK CONSTRUCT CO. INC03/04/2024
DOB NOWPlumbingSigned-offAGIUS PLUMBING & HTG INC01/23/2024
DOB NOWPlumbingSigned-offAGIUS PLUMBING & HTG INC01/23/2024
3 projects · most recent 02/10/2026
General Wiring
FiledStatusContractorScope
02/10/2026Permit IssuedKENNETH ELECTRIC INC1 meters
11/09/2023CompleteJ.P.E. ELEC'L CONTR'S INCGeneral Wiring
10/16/2018Permit IssuedACCURATE ELEC'L CORP.2 meters, 2 new_meters
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/03/2024Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
07/02/2024Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
06/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/13/2024Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
06/06/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
12/19/2023HVAC-R and service water heating equipmentSteven Savinoenergy_progress
12/19/2023HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
12/19/2023HVAC-R and service water heating system controlsSteven Savinoenergy_progress
12/15/2023Energy Code Compliance InspectionsSteven Savinoprogress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/22/2026S00965428-I1Request digital key ↗
08/22/2026S00965419-I1Request digital key ↗
08/22/2026S00965419-S1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature4
09/18/2026S00965419-S1Open ↗
09/18/2026S00965419-S1Open ↗
09/18/2026S00965419-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/22/2026S00965428-I1Open ↗
08/22/2026S00965419-S1Open ↗
08/22/2026S00965419-I1Open ↗