← Back
Two stories - detached, small or mid-size
216 OAKWOOD AVENUE
STATEN ISLAND · BIN 5006945
💬 Discuss this project
1899Year Built
2Stories
A1Building Class
R3XZoning
1,272 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 2,875 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 21p · 1 filing · 15 docs
Floor 11p · 1 filing · 9 docs
1 job · most recent 12/14/2022
Gas Water/Sanitary
FiledStatusContractorScope
12/14/2022Signed-offDPH PLUMBING & HTG CORPGas, Water/Sanitary
Building Lifecycle
All (27)Filed (4)Permit Issued (2)Signed Off (1)Violation (1)Inspection (6)Objection (6)Special Inspection (7)
06/07/2024
Violation issued (ECB, closed)
Zoning
12/14/2022
Filed — Alteration
proposal of plumbing fixtures at cellar and 1st floor levels
S00650260-P3
11/29/2022
Signed off — Alteration
proposed horizontal extension and interior renovation of existing one family dwelling as well as proposed rear deck@ osp
S00650139-I1
11/10/2022
Filed — Alteration
proposal of plumbing fixtures at cellar and 1st floor levels
S00650260-P1
11/09/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/07/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/31/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/31/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/05/2022
Permit issued — General Construction
S00650139-I1-GC
06/08/2022
Permit issued — Plumbing
S00650260-I1-PL
04/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
04/27/2022
Special inspection requirement — Energy Code Compliance Inspections
Jose Cruz
04/27/2022
Special inspection requirement — Fire-Resistance Rated Construction
Jose Cruz
04/27/2022
Special inspection requirement — Interior lighting power
Jose Cruz
04/27/2022
Special inspection requirement — Insulation placement and R values
Jose Cruz
04/27/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Jose Cruz
04/27/2022
Special inspection requirement — Lighting in dwelling units
Jose Cruz
02/10/2022
Objection raised — Scope
02/10/2022
Objection resolved — Addressed
02/10/2022
Objection raised — Scope
02/10/2022
Objection resolved — Addressed
02/10/2022
Objection raised — Inspections
02/10/2022
Objection resolved — Addressed
12/20/2021
Filed — Alteration
proposed horizontal extension and interior renovation of existing one family dwelling as well as proposed rear deck@ osp
S00650139-I1
12/20/2021
Filed — Alteration
proposal of plumbing fixtures at cellar and 1st floor levels
S00650260-I1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
F360 ARCHITECTURE PLLC412/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
UP DESIGN SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOHN PEDULLAGeneral Contractor303/21/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292112/20/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJOHN PEDULLA07/05/2022
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP06/08/2022
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/09/2022Pass-Final General Construction Non-Directive 14PassView ↗
11/07/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/31/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/31/2022Fail-Final General Construction Non-Directive 14FailView ↗
07/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/08/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
04/27/2022Fire-Resistant Penetrations and JointsJose Santosspecial
04/27/2022Energy Code Compliance InspectionsJose Cruzprogress
04/27/2022Fire-Resistance Rated ConstructionJose Cruzprogress
04/27/2022Interior lighting powerJose Cruzenergy_progress
04/27/2022Insulation placement and R valuesJose Cruzenergy_progress
04/27/2022Fenestration and door U-factor and product ratingsJose Cruzenergy_progress
04/27/2022Lighting in dwelling unitsJose Cruzenergy_progress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026S00650260-I1Request digital key ↗
08/23/2026S00650260-P3Request digital key ↗
08/23/2026S00650260-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00650139-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature6
08/27/2026S00650139-I1Open ↗
08/27/2026S00650139-I1Open ↗
08/27/2026S00650139-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026S00650260-P1Open ↗
08/23/2026S00650260-I1Open ↗
08/23/2026S00650260-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026S00650139-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026S00650260-I1Open ↗
08/23/2026S00650260-P3Open ↗
08/23/2026S00650260-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00650139-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026S00650139-I1Open ↗
▸Other Documents2
▸DOB NOWPlot Diagram1
08/13/2026S00650139-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00650139-I1Open ↗