← Back
Two stories - detached, small or mid-size
33 DOUGLAS AVENUE
STATEN ISLAND · BIN 5008367
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2Zoning
1,924 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 5,000 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 210p · 1 filing · 20 docs
Floor 112p · 1 filing · 20 docs
Cellar13p · 2 filings · 20 docs
1 job · most recent 02/11/2025
General Wiring
FiledStatusContractorScope
02/11/2025CompleteAPCO ELECTRICAL CORPGeneral Wiring
Building Lifecycle
All (57)Filed (7)Permit Issued (6)Signed Off (3)Violation (1)Inspection (8)Objection (6)Special Inspection (26)
02/11/2026
Signed off — Alteration
CAP TUB ON THE FIRST FLOOR, RELOCATE STOVE, KITCHEN SINK, LAV AND TOILET ON THE FIRST FLOOR AND INSTALL NEW PLUMBING FIXTURES ON THE SECOND FLOOR.
S01061828-I1
12/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Savino
12/04/2025
Special inspection requirement — Subgrade Inspections
Steven Savino
12/04/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
12/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Steven Savino
12/04/2025
Special inspection requirement — Concrete - Cast-In-Place
Steven Savino
12/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
12/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
Steven Savino
12/04/2025
Special inspection requirement — Lighting in dwelling units
Steven Savino
12/04/2025
Special inspection requirement — Permanent certificate
Steven Savino
12/04/2025
Special inspection requirement — Insulation placement and R values
Steven Savino
12/04/2025
Special inspection requirement — Fenestration air leakage
Steven Savino
12/04/2025
Special inspection requirement — Fenestration areas
Steven Savino
12/04/2025
Special inspection requirement — Air barrier — testing
Steven Savino
12/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Steven Savino
12/03/2025
Objection resolved — Addressed
12/01/2025
Objection raised — Scope
11/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
11/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
11/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
11/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
11/17/2025
Filed — Alteration
CAP TUB ON THE FIRST FLOOR, RELOCATE STOVE, KITCHEN SINK, LAV AND TOILET ON THE FIRST FLOOR AND INSTALL NEW PLUMBING FIXTURES ON THE SECOND FLOOR.
S01061828-P2
11/14/2025
Signed off — Alteration
INSTALLATION OF A 10 FEET CURB CUT
S01024692-I1
11/14/2025
Filed — Alteration CO
Vertical addition to the existing one story dwelling.
S01019426-P1
11/14/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
11/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
11/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
11/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
10/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/11/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/09/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/05/2025
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE 8' FT
S01019471-I1
09/05/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/14/2025
Filed — Alteration
CAP TUB ON THE FIRST FLOOR, RELOCATE STOVE, KITCHEN SINK, LAV AND TOILET ON THE FIRST FLOOR AND INSTALL NEW PLUMBING FIXTURES ON THE SECOND FLOOR.
S01061828-P1
06/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
06/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
06/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
06/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
05/13/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
05/05/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/24/2025
Permit issued — Construction Fence
S01019471-I1-FN
01/23/2025
Permit issued — General Construction
S01019426-I1-GC
01/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/06/2025
Permit issued — Plumbing
S01061828-I1-PL
10/18/2024
Violation issued (ECB, closed)
Construction
08/16/2024
Permit issued — General Construction
S01019426-I1-GC
08/09/2024
Permit issued — Construction Fence
S01019471-I1-FN
08/09/2024
Permit issued — Curb Cut
S01024692-I1-CC
07/18/2024
Filed — Alteration
CAP TUB ON THE FIRST FLOOR, RELOCATE STOVE, KITCHEN SINK, LAV AND TOILET ON THE FIRST FLOOR AND INSTALL NEW PLUMBING FIXTURES ON THE SECOND FLOOR.
S01061828-I1
07/18/2024
Filed — Alteration
INSTALLATION OF A 10 FEET CURB CUT
S01024692-I1
07/18/2024
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE 8' FT
S01019471-I1
07/16/2024
Objection resolved — Addressed
07/16/2024
Objection resolved — Addressed
07/15/2024
Objection raised — Scope
07/15/2024
Objection raised — Scope
06/06/2024
Filed — Alteration CO
Vertical addition to the existing one story dwelling.
S01019426-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A.D. ALPHA CONSTRUCTION C103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC711/17/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.D. ALPHA CONSTRUCTION CGeneral Contractor1307/08/2026
A&H EXPRESS PLBG&HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEVEN R. SAVINO ARCHIT1216211/14/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offA.D. ALPHA CONSTRUCTION C01/24/2025
DOB NOWGeneral ConstructionPermit IssuedA.D. ALPHA CONSTRUCTION C01/23/2025
DOB NOWPlumbingSigned-offA&H EXPRESS PLBG&HTG CORP01/06/2025
DOB NOWGeneral ConstructionPermit IssuedA.D. ALPHA CONSTRUCTION C08/16/2024
DOB NOWConstruction FenceSigned-offA.D. ALPHA CONSTRUCTION C08/09/2024
DOB NOWCurb CutSigned-offA.D. ALPHA CONSTRUCTION C08/09/2024
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/11/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
09/09/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/13/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
05/05/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
12/04/2025Fire-Resistant Penetrations and JointsSteven Savinospecial
12/04/2025Subgrade InspectionsSteven Savinospecial
12/04/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
12/04/2025Structural Stability – Alterations of existing buildingsSteven Savinospecial
12/04/2025Concrete - Cast-In-PlaceSteven Savinospecial
12/04/2025Energy Code Compliance InspectionsSteven Savinoprogress
12/04/2025Fire-Resistance Rated ConstructionSteven Savinoprogress
12/04/2025Lighting in dwelling unitsSteven Savinoenergy_progress
12/04/2025Permanent certificateSteven Savinoenergy_progress
12/04/2025Insulation placement and R valuesSteven Savinoenergy_progress
12/04/2025Fenestration air leakageSteven Savinoenergy_progress
12/04/2025Fenestration areasSteven Savinoenergy_progress
12/04/2025Air barrier — testing Steven Savinoenergy_progress
12/04/2025Fenestration and door U-factor and product ratingsSteven Savinoenergy_progress
11/18/2025Energy Code Compliance InspectionsSteven Savinoprogress
11/18/2025HVAC-R and service water heating system controlsSteven Savinoenergy_progress
11/18/2025HVAC-R and service water heating equipmentSteven Savinoenergy_progress
11/18/2025HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
11/14/2025Energy Code Compliance InspectionsSteven Savinoprogress
11/14/2025HVAC-R and service water heating system controlsSteven Savinoenergy_progress
11/14/2025HVAC-R and service water heating equipmentSteven Savinoenergy_progress
11/14/2025HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
06/19/2025Energy Code Compliance InspectionsSteven Savinoprogress
06/19/2025HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
06/19/2025HVAC-R and service water heating system controlsSteven Savinoenergy_progress
Latest 25 of 26.
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026S01019471-I1Request digital key ↗
08/21/2026S01024692-I1Request digital key ↗
08/19/2026S01061828-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
05/20/2024540263677Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S01019426-I1Open ↗
08/13/2026S01019426-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026S01019426-I1Open ↗
08/13/2026S01019426-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S01019426-I1Open ↗
08/13/2026S01019426-P1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature11
08/26/2026S01019426-I1Open ↗
08/26/2026S01019426-I1Open ↗
08/26/2026S01061828-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026S01019471-I1Open ↗
08/13/2026S01061828-P2Open ↗
08/13/2026S01019426-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026S01019426-I1Open ↗
08/26/2026S01019426-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
04/17/2024540263677Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/17/2024540263677Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026S01019426-I1Open ↗
08/13/2026S01019426-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026S01019426-P1Open ↗
08/13/2026S01019426-I1Open ↗
08/13/2026S01061828-I1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT2
08/13/2026S01019426-I1Open ↗
08/13/2026S01019426-P1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
04/17/2024540263677Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/17/2024540263677Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01019426-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
05/20/2024540263677Open ↗
▸Other Documents10
▸DOB NOWProperty Ownership Certification2
08/13/2026S01019426-I1Open ↗
08/13/2026S01019426-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S01019426-I1Open ↗
08/13/2026S01019426-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S01019426-P1Open ↗
08/13/2026S01019426-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026S01019426-I1Open ↗
08/13/2026S01019426-P1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
04/17/2024540263677Open ↗
▸DOB NOWFinal Survey1
08/17/2026S01019426-I1Open ↗