Two family frame
1535 VICTORY BOULEVARD
STATEN ISLAND · BIN 5009042
💬 Discuss this project
1950Year Built
2Stories
B2Building Class
R1-2Zoning
4,720 sfGross Floor Area
2Units
Two family frame · 10,300 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof5p · 1 filing · 10 docs
Floor 21p · 1 filing · 10 docs
Floor 15p · 1 filing · 10 docs
Cellar2p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CSGUDE ARCHITECTURE, PC106/01/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MICHAEL ROWE CONSULTING AND EXPEDIT203/21/2026
Building Lifecycle
All (24)Filed (1)Objection (1)Special Inspection (22)
06/11/2021
Objection raised — Scope
06/01/2021
Filed — ALT-CO - New Building with Existing Elements to Remain
HORIZONTAL ENLARGEMENT FOR NEW HOUSE OF WORSHIP; REDISTRIBUTION OF EXISTING MEDICAL OFFICE AND DWELLING UNIT; VERTICAL ENLARGEMENT OF EXISTING DWELLING UNIT;
S00514449-I1
05/31/2021
Special inspection requirement — Concrete - Cast-In-Place
05/31/2021
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
05/31/2021
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
05/31/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/31/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/31/2021
Special inspection requirement — Subgrade Inspections
05/31/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/31/2021
Special inspection requirement — Energy Code Compliance Inspections
05/31/2021
Special inspection requirement — Fire-Resistance Rated Construction
05/31/2021
Special inspection requirement — Lighting in dwelling units
05/31/2021
Special inspection requirement — Air barrier — testing
05/31/2021
Special inspection requirement — Insulation placement and R values
05/31/2021
Special inspection requirement — Maintenance information
05/31/2021
Special inspection requirement — Air barrier - visual inspection
05/31/2021
Special inspection requirement — Interior lighting power
05/31/2021
Special inspection requirement — Metering
05/31/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
05/31/2021
Special inspection requirement — Lighting controls
05/31/2021
Special inspection requirement — Fenestration air leakage
05/31/2021
Special inspection requirement — Permanent certificate
05/31/2021
Special inspection requirement — Fenestration areas
05/31/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
05/31/2021Concrete - Cast-In-Place—special
05/31/2021Excavations - Sheeting, Shoring, and Bracing—special
05/31/2021Exterior Insulation and Finish Systems (EIFS)—special
05/31/2021Fire-Resistant Penetrations and Joints—special
05/31/2021Structural Stability – Alterations of existing buildings—special
05/31/2021Subgrade Inspections—special
05/31/2021Subsurface Investigations (Borings/Test Pits)—special
05/31/2021Energy Code Compliance Inspections—progress
05/31/2021Fire-Resistance Rated Construction—progress
05/31/2021Lighting in dwelling units—energy_progress
05/31/2021Air barrier — testing —energy_progress
05/31/2021Insulation placement and R values—energy_progress
05/31/2021Maintenance information—energy_progress
05/31/2021Air barrier - visual inspection—energy_progress
05/31/2021Interior lighting power—energy_progress
05/31/2021Metering—energy_progress
05/31/2021Fenestration and door U-factor and product ratings—energy_progress
05/31/2021Lighting controls—energy_progress
05/31/2021Fenestration air leakage—energy_progress
05/31/2021Permanent certificate—energy_progress
05/31/2021Fenestration areas—energy_progress
05/31/2021HVAC-R and service water piping design and insulation—energy_progress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026S00514449-I1Request digital key ↗
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
12/06/2021540205687Open ↗
09/21/2021540205687Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
08/27/2021540205687Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026S00514449-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/15/2026S00514449-I1Open ↗
▸Seals & Professional Certifications3
▸BISAPPLICANT OWNER SIGNATURE1
08/27/2021540205687Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/27/2021540205687Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/25/2026S00514449-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/15/2026S00514449-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026S00514449-I1Open ↗
▸Inspections & Test Reports3
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
08/27/2021540205687Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/27/2021540205687Open ↗
▸DOB NOWSOIL REPORT1
08/15/2026S00514449-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
12/06/2021540205687Open ↗
09/21/2021540205687Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
08/27/2021540205687Open ↗
▸Other Documents7
▸BISWAIVER OF SIDEWALK ALIGNMENT.1
09/21/2021540205687Open ↗
▸BISWAIVER TO MAINTAIN LESS THAN 7 FEET BETWEEN CURB CUT AND TREE.1
09/21/2021540205687Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
09/21/2021540205687Open ↗
▸BISWAIVER OF CURB ALIGNMENT VICTORY BLVD1
09/21/2021540205687Open ↗
▸BISWAIVER OF CURB ALIGNMENT FOR ROYAL OAK ROAD1
09/21/2021540205687Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
08/27/2021540205687Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026S00514449-I1Open ↗