← Back
Banking facility, with or without parking
1837 VICTORY BOULEVARD
STATEN ISLAND · BIN 5010516
💬 Discuss this project
1976Year Built
1Stories
K7Building Class
R3-1Zoning
4,615 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Banking facility, with or without parking · 8,000 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SANTANDER US1507/08/2026
BANCO SANTANDER303/22/2026
OWNER OF 1837 VICTORY BLV103/22/2026
SOVEREIGN BANK, NA103/21/2026
SOVEREIGH BANK NA203/21/2026
STATEN ISLAND SAVINGS BANK103/21/2026
SOVEREIGN BANK103/21/2026
S I SAVINGS BANK203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.803/21/2026
KAZAM CONSULTANTS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEAMAN, MARCElectrical303/21/2026
PERRY MECHANICAL CONTRACTGeneral Contractor303/21/2026
ACTIVE SIGNSScaffold307/08/2026
VERICON CONSTRUCTION COGeneral Contractor207/08/2026
HUGHES ENVIRONMENTAL ENGIGeneral Contractor107/08/2026
M&T PLBG AND HTG CO., INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPECIAL INSPECTION SERVIC1200110/11/2022
MILROSE CONSULTANTS LLC2003208/11/2022
OBAID MIAN849107/26/2021
Building Lifecycle
All (46)Filed (8)Permit Issued (8)Signed Off (7)Violation (2)Inspection (4)Special Inspection (17)
04/13/2023
Signed off — Alteration
Interior alteration of existing retail branch including new partitions, doors, finishes, and furniture. No change to use, egress or occupancy.
S00748876-I1
04/11/2023
Signed off — Alteration
Mechanical work including new air distribution to support the reconfigured office space. No change to use, egress, or occupancy.
S00750330-I1
04/11/2023
Signed off — Alteration
Plumbing work to convert existing multi-fixture restrooms to two (2) single use unisex ADA restrooms. No change to use, egress, or occupancy.
S00750334-I1
04/06/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/05/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/14/2023
Signed off — Alteration
Erect illuminated accessory business wall sign; copy reading "Santander with Logo"
S00725953-I1
02/14/2023
Signed off — Alteration
Erect illuminated accessory business wall sign; copy reading "Santander with Logo"
S00725948-I1
02/14/2023
Signed off — Alteration
Erect non-illuminated accessory business wall sign; copy reading "Santander with Logo"
S00725962-I1
01/25/2023
Permit issued — General Construction
S00748876-I1-GC
01/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/03/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/22/2022
Permit issued — Plumbing
S00750334-I1-PL
11/02/2022
Permit issued — Sign
S00725962-I1-SG
11/01/2022
Filed — Alteration
Erect illuminated accessory business wall sign; copy reading "Santander with Logo"
S00725953-I1
11/01/2022
Filed — Alteration
Erect illuminated accessory business wall sign; copy reading "Santander with Logo"
S00725948-I1
11/01/2022
Filed — Alteration
Erect non-illuminated accessory business wall sign; copy reading "Santander with Logo"
S00725962-I1
11/01/2022
Permit issued — Sign
S00725948-I1-SG
11/01/2022
Permit issued — Sign
S00725953-I1-SG
10/31/2022
Special inspection requirement — Final
AHMED SHAABAN
10/31/2022
Special inspection requirement — Final
AHMED SHAABAN
10/31/2022
Special inspection requirement — Final
AHMED SHAABAN
10/11/2022
Filed — Alteration
Interior alteration of existing retail branch including new partitions, doors, finishes, and furniture. No change to use, egress or occupancy.
S00748876-P1
10/07/2022
Permit issued — Mechanical Systems
S00750330-I1-MS
10/04/2022
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
10/04/2022
Special inspection requirement — Final
Timothy Miron
10/04/2022
Special inspection requirement — Lighting controls
Christopher Drutjons
10/04/2022
Special inspection requirement — Interior lighting power
Christopher Drutjons
10/04/2022
Special inspection requirement — Exterior lighting power
Christopher Drutjons
10/04/2022
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
09/27/2022
Permit issued — General Construction
S00748876-I1-GC
08/11/2022
Filed — Alteration
Mechanical work including new air distribution to support the reconfigured office space. No change to use, egress, or occupancy.
S00750330-I1
08/10/2022
Filed — Alteration
Plumbing work to convert existing multi-fixture restrooms to two (2) single use unisex ADA restrooms. No change to use, egress, or occupancy.
S00750334-I1
08/09/2022
Filed — Alteration
Interior alteration of existing retail branch including new partitions, doors, finishes, and furniture. No change to use, egress or occupancy.
S00748876-I1
06/02/2022
Special inspection requirement — Final
Christopher Drutjons
06/02/2022
Special inspection requirement — Mechanical Systems
Christopher Drutjons
10/13/2021
Signed off — Alteration
Replacement of roof mounted air conditioning units.
S00560132-I1
07/26/2021
Filed — Alteration
Replacement of roof mounted air conditioning units.
S00560132-I1
07/26/2021
Permit issued — Mechanical Systems
S00560132-I1-MS
07/19/2021
Special inspection requirement — HVAC-R and service water heating equipment
Obaid Mian
07/19/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Obaid Mian
07/19/2021
Special inspection requirement — HVAC-R and service water heating system controls
Obaid Mian
07/19/2021
Special inspection requirement — Mechanical Systems
Obaid Mian
07/19/2021
Special inspection requirement — Final
Obaid Mian
07/19/2021
Special inspection requirement — Maintenance information
Obaid Mian
02/14/1992
Violation issued (ECB, open)
Construction
11/25/1986
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offVERICON CONSTRUCTION CO01/25/2023
DOB NOWPlumbingSigned-offM&T PLBG AND HTG CO., INC11/22/2022
DOB NOWSignSigned-offACTIVE SIGNS INC11/02/2022
DOB NOWSignSigned-offACTIVE SIGNS INC11/01/2022
DOB NOWSignSigned-offACTIVE SIGNS INC11/01/2022
DOB NOWMechanical SystemsSigned-offHUGHES ENVIRONMENTAL ENGI10/07/2022
DOB NOWGeneral ConstructionSigned-offVERICON CONSTRUCTION CO09/27/2022
DOB NOWMechanical SystemsSigned-offPERRY MECHANICAL CONTRACT07/26/2021
BISOTISSUEDNATIONAL MAINTENANCE INC09/10/2013
BIS—ISSUEDNATIONAL MAINTENANCE, INC08/29/2013
BIS—ISSUEDNATIONAL MAINTENANCE, INC08/29/2013
BIS—ISSUEDNATIONAL MAINTENANCE, INC08/28/2013
BISOTISSUEDGOING SIGN & SERVICING CO08/25/2006
BIS—ISSUEDGOING SIGN & SVCNG CO,INC08/17/2006
BIS—ISSUEDGOING SIGN & SVCNG CO,INC08/17/2006
BIS—ISSUEDGOING SIGN & SVCNG CO,INC08/17/2004
BIS—ISSUEDFRANK TORRONE & SONS INC09/01/2000
BISMHISSUEDNASCO HTNG AND AIR COND I07/07/2000
BIS—ISSUEDFRANK TORRONE & SONS INC.03/31/1993
BIS—ISSUEDFRANK TORRONE & SONS INC.03/31/1993
3 projects · most recent 02/02/2023
General Wiring Lighting
FiledStatusContractorScope
02/02/2023CompleteRAINBOW ELECTRIC CO., INC—
02/02/2023CompleteRAINBOW ELECTRIC CO., INC—
10/11/2022CompleteCORP. ELEC'L TECHNOLOGIESGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/05/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/03/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
10/31/2022FinalAHMED SHAABANprogress
10/31/2022FinalAHMED SHAABANprogress
10/31/2022FinalAHMED SHAABANprogress
10/04/2022Energy Code Compliance InspectionsChristopher Drutjonsprogress
10/04/2022FinalTimothy Mironprogress
10/04/2022Lighting controlsChristopher Drutjonsenergy_progress
10/04/2022Interior lighting powerChristopher Drutjonsenergy_progress
10/04/2022Exterior lighting powerChristopher Drutjonsenergy_progress
10/04/2022Post-installed AnchorsChristopher Drutjonsspecial
06/02/2022FinalChristopher Drutjonsprogress
06/02/2022Mechanical SystemsChristopher Drutjonsspecial
07/19/2021HVAC-R and service water heating equipmentObaid Mianenergy_progress
07/19/2021HVAC-R and service water piping design and insulationObaid Mianenergy_progress
07/19/2021HVAC-R and service water heating system controlsObaid Mianenergy_progress
07/19/2021Mechanical SystemsObaid Mianspecial
07/19/2021FinalObaid Mianprogress
07/19/2021Maintenance informationObaid Mianenergy_progress
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/25/2026S00560132-I1Request digital key ↗
08/24/2026S00750334-I1Request digital key ↗
08/24/2026S00750330-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION4
09/11/2013520160815Open ↗
09/04/2013520160806Open ↗
09/03/2013520160771Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION4
09/11/2013520160815Open ↗
09/04/2013520160806Open ↗
09/03/2013520160771Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications31
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026S00560132-I1Open ↗
09/01/2026S00560132-I1Open ↗
09/01/2026S00560132-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026S00560132-I1Open ↗
08/24/2026S00750334-I1Open ↗
08/23/2026S00725948-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
09/11/2013520160815Open ↗
09/04/2013520160806Open ↗
09/03/2013520160771Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
09/11/2013520160815Open ↗
09/04/2013520160806Open ↗
09/03/2013520160771Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026S00560132-I1Open ↗
08/28/2026S00748876-P1Open ↗
08/27/2026S00750330-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026S00560132-I1Open ↗
08/23/2026S00725948-I1Open ↗
08/23/2026S00725953-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/24/2026S00750334-I1Open ↗
08/13/2026S00750330-I1Open ↗
08/13/2026S00748876-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026S00560132-I1Open ↗
08/13/2026S00748876-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS4
09/11/2013520160815Open ↗
09/04/2013520160806Open ↗
09/03/2013520160771Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
09/11/2013520160815Open ↗
09/04/2013520160806Open ↗
09/03/2013520160771Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET4
09/11/2013520160815Open ↗
09/04/2013520160806Open ↗
09/03/2013520160771Open ↗
Showing 3 of 4 on file for this type