Two stories - detached, small or mid-size
416 COLLEGE AVENUE
STATEN ISLAND · BIN 5011564
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R3XZoning
1,284 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,662 sf lot · 0.28 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES A CLANCY211/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARC DESIGN AND CONSULTING LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FICAZZOLA CONSULTING LLCGeneral Contractor204/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAMES A CLANCY9176211/23/2025
Building Lifecycle
All (13)Filed (2)Permit Issued (2)Signed Off (1)Special Inspection (8)
11/26/2025
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01078693-I1
11/24/2025
Special inspection requirement — Air barrier - visual inspection
James Clancy
11/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Clancy
11/24/2025
Special inspection requirement — Final
James Clancy
11/24/2025
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
11/23/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01078693-P1
10/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Clancy
10/22/2025
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
10/22/2025
Special inspection requirement — Final
James Clancy
10/22/2025
Special inspection requirement — Air barrier - visual inspection
James Clancy
07/10/2025
Permit issued — Solar
S01078693-I1-SL
07/17/2024
Permit issued — Solar
S01078693-I1-SL
07/15/2024
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01078693-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offFICAZZOLA CONSULTING07/10/2025
DOB NOWSolarSigned-offFICAZZOLA CONSULTING07/17/2024
1 project · most recent 07/12/2024
FiledStatusContractorScope
07/12/2024CompleteAMBER ELECTL CONTNG INC—
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
11/24/2025Air barrier - visual inspectionJames Clancyenergy_progress
11/24/2025Fire-Resistant Penetrations and JointsJames Clancyspecial
11/24/2025FinalJames Clancyprogress
11/24/2025Energy Code Compliance InspectionsJames Clancyprogress
10/22/2025Fire-Resistant Penetrations and JointsJames Clancyspecial
10/22/2025Energy Code Compliance InspectionsJames Clancyprogress
10/22/2025FinalJames Clancyprogress
10/22/2025Air barrier - visual inspectionJames Clancyenergy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026S01078693-P1Request digital key ↗
08/17/2026S01078693-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
08/31/2026S01078693-P1Open ↗
08/31/2026S01078693-P1Open ↗
08/27/2026S01078693-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026S01078693-P1Open ↗
08/13/2026S01078693-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026S01078693-P1Open ↗
08/27/2026S01078693-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026S01078693-I1Open ↗
08/13/2026S01078693-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01078693-I1Open ↗