← Back
Two family brick
141 PINE PLACE
STATEN ISLAND · BIN 5014257
💬 Discuss this project
1910Year Built
2Stories
B1Building Class
R3AZoning
1,456 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Two family brick · 3,142 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 15p · 1 filing · 20 docs
Nothing on file for this building.
Building Lifecycle
All (50)Filed (3)Permit Issued (2)Signed Off (1)Violation (18)Objection (6)Special Inspection (20)
10/31/2024
Signed off — Alteration
THE PURPOSE OF THIS PROJECT IS TO REPLACE THE OPEN PORCH ROOF, ADD A SLIDING DOOR AND A ROOF FOR EXISTING REAR DECK.NO CHANGE TO EGRESS, OCCUPANCY, OR USE.
S07995184-I1
09/04/2024
Filed — Alteration
THE PURPOSE OF THIS PROJECT IS TO REPLACE THE OPEN PORCH ROOF, ADD A SLIDING DOOR AND A ROOF FOR EXISTING REAR DECK.NO CHANGE TO EGRESS, OCCUPANCY, OR USE.
S07995184-P2
08/28/2024
Special inspection requirement — Fenestration areas
Mohammad Baalbaki
08/28/2024
Special inspection requirement — Concrete - Cast-In-Place
Mohammad Baalbaki
08/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohammad Baalbaki
08/28/2024
Special inspection requirement — Structural Cold-Formed Steel
Mohammad Baalbaki
08/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mohammad Baalbaki
08/28/2024
Special inspection requirement — Energy Code Compliance Inspections
Mohammad Baalbaki
08/28/2024
Special inspection requirement — Final
JOHN MALVASIO
08/28/2024
Special inspection requirement — Air barrier - visual inspection
Mohammad Baalbaki
08/28/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Mohammad Baalbaki
08/28/2024
Special inspection requirement — Fenestration air leakage
Mohammad Baalbaki
04/03/2024
Objection resolved — Addressed
03/20/2024
Objection raised — Zoning
03/11/2024
Objection resolved — Addressed
02/13/2024
Objection raised — Scope
01/18/2024
Filed — Alteration
THE PURPOSE OF THIS PROJECT IS TO REPLACE THE OPEN PORCH ROOF, ADD A SLIDING DOOR AND A ROOF FOR EXISTING REAR DECK.NO CHANGE TO EGRESS, OCCUPANCY, OR USE.
S07995184-P1
01/18/2024
Special inspection requirement — Concrete - Cast-In-Place
Mohammad Baalbaki
01/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohammad Baalbaki
01/18/2024
Special inspection requirement — Structural Cold-Formed Steel
Mohammad Baalbaki
01/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mohammad Baalbaki
01/18/2024
Special inspection requirement — Energy Code Compliance Inspections
Mohammad Baalbaki
01/18/2024
Special inspection requirement — Final
JOHN MALVASIO
01/18/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Mohammad Baalbaki
01/18/2024
Special inspection requirement — Air barrier - visual inspection
Mohammad Baalbaki
01/18/2024
Special inspection requirement — Fenestration areas
Mohammad Baalbaki
01/18/2024
Special inspection requirement — Fenestration air leakage
Mohammad Baalbaki
12/11/2023
Permit issued — General Construction
S07995184-I1-GC-CX
03/28/2023
Permit issued — General Construction
S07995184-I1-GC-CX
09/20/2022
Objection raised — Scope
09/20/2022
Objection resolved — Addressed
09/07/2022
Filed — Alteration
THE PURPOSE OF THIS PROJECT IS TO REPLACE THE OPEN PORCH ROOF, ADD A SLIDING DOOR AND A ROOF FOR EXISTING REAR DECK.NO CHANGE TO EGRESS, OCCUPANCY, OR USE.
S07995184-I1
03/25/2022
Violation issued (HPD, open)
I
03/24/2022
Violation issued (HPD, closed)
C
03/24/2022
Violation issued (HPD, closed)
B
02/23/2022
Violation issued (HPD, closed)
A
02/23/2022
Violation issued (HPD, closed)
B
02/23/2022
Violation issued (HPD, closed)
A
03/19/2021
Violation issued (HPD, closed)
C
12/31/2020
Violation issued (HPD, closed)
C
12/31/2020
Violation issued (HPD, closed)
B
12/31/2020
Violation issued (HPD, closed)
B
12/30/2020
Violation issued (HPD, open)
I
12/28/2020
Violation issued (HPD, closed)
C
12/16/2020
Violation issued (HPD, closed)
B
09/24/2019
Violation issued (HPD, closed)
A
09/24/2019
Violation issued (HPD, closed)
B
09/24/2019
Violation issued (HPD, closed)
A
07/07/2009
Violation issued (ECB, closed)
Construction
07/07/2009
Violation issued (ECB, closed)
Construction
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAALBAKI&ASSOCIATES ENGINEERING, PC309/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
B A INSPECTIONS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AAA BUILDERS.INCGeneral Contractor303/21/2026
MOD CONSULTANTS LLCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAALBAKI&ASSOCIATES ENGIN1858309/04/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMOD CONSULTANTS LLC12/11/2023
DOB NOWGeneral ConstructionSigned-offAAA BUILDERS.INC03/28/2023
BISPLISSUEDKCM PLUMBING & HEATING CO11/15/2018
BISPLISSUEDATOZ MASTER PLBG PLUS07/02/2018
BISOTISSUEDM & M HOME IMPROVEMENT IN04/25/2018
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
08/28/2024Fenestration areasMohammad Baalbakienergy_progress
08/28/2024Concrete - Cast-In-PlaceMohammad Baalbakispecial
08/28/2024Fire-Resistant Penetrations and JointsMohammad Baalbakispecial
08/28/2024Structural Cold-Formed SteelMohammad Baalbakispecial
08/28/2024Structural Stability – Alterations of existing buildingsMohammad Baalbakispecial
08/28/2024Energy Code Compliance InspectionsMohammad Baalbakiprogress
08/28/2024FinalJOHN MALVASIOprogress
08/28/2024Air barrier - visual inspectionMohammad Baalbakienergy_progress
08/28/2024Fenestration and door U-factor and product ratingsMohammad Baalbakienergy_progress
08/28/2024Fenestration air leakageMohammad Baalbakienergy_progress
01/18/2024Concrete - Cast-In-PlaceMohammad Baalbakispecial
01/18/2024Fire-Resistant Penetrations and JointsMohammad Baalbakispecial
01/18/2024Structural Cold-Formed SteelMohammad Baalbakispecial
01/18/2024Structural Stability – Alterations of existing buildingsMohammad Baalbakispecial
01/18/2024Energy Code Compliance InspectionsMohammad Baalbakiprogress
01/18/2024FinalJOHN MALVASIOprogress
01/18/2024Fenestration and door U-factor and product ratingsMohammad Baalbakienergy_progress
01/18/2024Air barrier - visual inspectionMohammad Baalbakienergy_progress
01/18/2024Fenestration areasMohammad Baalbakienergy_progress
01/18/2024Fenestration air leakageMohammad Baalbakienergy_progress
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026S07995184-I1Request digital key ↗
08/21/2026S07995184-P2Request digital key ↗
08/14/2026S07995184-P1Request digital key ↗
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
11/16/2018520040704Open ↗
07/03/2018520040704Open ↗
04/28/2018520040704Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
03/14/2019520040704Open ↗
06/28/2010520040704Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
08/10/2010520040704Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature12
08/24/2026S07995184-P1Open ↗
08/24/2026S07995184-P1Open ↗
08/24/2026S07995184-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/24/2026S07995184-P1Open ↗
08/24/2026S07995184-P1Open ↗
08/24/2026S07995184-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026S07995184-I1Open ↗
08/21/2026S07995184-P1Open ↗
08/13/2026S07995184-P2Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
02/22/2019520040704Open ↗
06/28/2010520040704Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/14/2019520040704Open ↗
▸BISSCHEDULE B - PLUMBING1
06/28/2010520040704Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026S07995184-I1Open ↗
08/14/2026S07995184-P1Open ↗
08/13/2026S07995184-P2Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/28/2010520040704Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S07995184-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
02/07/2022520040704Open ↗
09/18/2019520040704Open ↗
06/26/2019520040704Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
11/16/2018520040704Open ↗
11/16/2018520040704Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
08/10/2010520040704Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/28/2010520040704Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
02/22/2019520040704Open ↗
06/28/2010520040704Open ↗
▸Filing & Intake Forms5
▸BISBOROUGH INTAKE FORM4
09/18/2019520040704Open ↗
06/26/2019520040704Open ↗
03/14/2019520040704Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET1
06/28/2010520040704Open ↗