Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 18 docs
Floor 22p · 1 filing · 18 docs
Floor 1
Cellar2p · 1 filing · 18 docs
1 job · most recent 07/29/2025
General Wiring
FiledStatusContractorScope
07/29/2025CompleteLMS ELECTRICAL CORPGeneral Wiring
1 job · most recent 03/26/2025
Fence
FiledStatusContractorScope
03/26/2025Signed-offRIGHTWAY RENOVATIONS CORPFence
Building Lifecycle
All (52)Filed (6)Permit Issued (6)Signed Off (4)Violation (5)Inspection (8)Objection (2)Special Inspection (21)
07/10/2026
Signed off — Alteration
Installation of a temporary wood and chain link construction fence around the entire perimeter of the fire damaged premise. Please be advised there is an Emergency Work Order at this premise. Fence installed to comply with DOB vio 19084.
S01200943-I1
02/11/2026
Signed off — Alteration
APPLICATION IS FILED FOR THE INTERIOR RENOVATION TO EXISTING TWO-FAMILY, TWO-STORY RESIDENCE DUE TO FIRE DAMAGE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO NEW C/O TO BE ISSUED UNDER THIS APPLICATION.
S01236628-I1
02/10/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/30/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/27/2026
Signed off — Alteration
APPLICATION IS FILED FOR THE INTERIOR RENOVATION TO EXISTING TWO-FAMILY, TWO-STORY RESIDENCE DUE TO FIRE DAMAGE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO NEW C/O TO BE ISSUED UNDER THIS APPLICATION.
S01236628-S1
01/27/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/22/2026
Signed off — Alteration
Application filed for the demolition of roof framing and part of attic due to fire damage. File in direct response to the vacate and associated DOB violation #032425CFEU50101XC & #032425CFEU50102AK. All work as per plans submitted herewith.
S01206680-I1
01/16/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/16/2026
Special inspection requirement — Duct leakage testing, insulation and design
RAUL VELASQUEZ MARTINEZ
01/16/2026
Special inspection requirement — Structural Wood Frame
RAUL VELASQUEZ MARTINEZ
01/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
RAUL VELASQUEZ MARTINEZ
01/16/2026
Special inspection requirement — Fenestration air leakage
RAUL VELASQUEZ MARTINEZ
01/16/2026
Special inspection requirement — Air barrier - visual inspection
RAUL VELASQUEZ MARTINEZ
01/16/2026
Special inspection requirement — Insulation placement and R values
RAUL VELASQUEZ MARTINEZ
01/16/2026
Special inspection requirement — Interior lighting power
RAUL VELASQUEZ MARTINEZ
01/16/2026
Special inspection requirement — Fenestration areas
RAUL VELASQUEZ MARTINEZ
01/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
RAUL VELASQUEZ MARTINEZ
01/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
RAUL VELASQUEZ MARTINEZ
01/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
01/16/2026
Special inspection requirement — Final
RAUL VELASQUEZ MARTINEZ
01/16/2026
Special inspection requirement — Energy Code Compliance Inspections
RAUL VELASQUEZ MARTINEZ
01/09/2026
Filed — Alteration
APPLICATION IS FILED FOR THE INTERIOR RENOVATION TO EXISTING TWO-FAMILY, TWO-STORY RESIDENCE DUE TO FIRE DAMAGE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO NEW C/O TO BE ISSUED UNDER THIS APPLICATION.
S01236628-P2
12/16/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/04/2025
Permit issued — General Construction
S01206680-I1-GC
12/04/2025
Permit issued — General Construction
S01206680-I1-ST
12/02/2025
Objection resolved — Addressed
10/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/07/2025
Filed — Alteration
APPLICATION IS FILED FOR THE INTERIOR RENOVATION TO EXISTING TWO-FAMILY, TWO-STORY RESIDENCE DUE TO FIRE DAMAGE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO NEW C/O TO BE ISSUED UNDER THIS APPLICATION.
S01236628-P1
10/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
RAUL VELASQUEZ MARTINEZ
10/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
RAUL VELASQUEZ MARTINEZ
10/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
10/07/2025
Special inspection requirement — Energy Code Compliance Inspections
RAUL VELASQUEZ MARTINEZ
10/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
RAUL VELASQUEZ MARTINEZ
09/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/07/2025
Permit issued — Plumbing
S01236628-S1-PL
07/01/2025
Permit issued — General Construction
S01236628-I1-ST
07/01/2025
Permit issued — General Construction
S01236628-I1-GC
06/20/2025
Objection raised — Scope
06/19/2025
Filed — Alteration
APPLICATION IS FILED FOR THE INTERIOR RENOVATION TO EXISTING TWO-FAMILY, TWO-STORY RESIDENCE DUE TO FIRE DAMAGE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO NEW C/O TO BE ISSUED UNDER THIS APPLICATION.
S01236628-S1
06/17/2025
Filed — Alteration
APPLICATION IS FILED FOR THE INTERIOR RENOVATION TO EXISTING TWO-FAMILY, TWO-STORY RESIDENCE DUE TO FIRE DAMAGE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO NEW C/O TO BE ISSUED UNDER THIS APPLICATION.
S01236628-I1
06/05/2025
Filed — Alteration
Application filed for the demolition of roof framing and part of attic due to fire damage. File in direct response to the vacate and associated DOB violation #032425CFEU50101XC & #032425CFEU50102AK. All work as per plans submitted herewith.
S01206680-I1
04/15/2025
Special inspection requirement — Demolition
RAUL VELASQUEZ MARTINEZ
04/07/2025
Special inspection requirement — Final
RAUL VELASQUEZ MARTINEZ
04/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
RAUL VELASQUEZ MARTINEZ
03/31/2025
Permit issued — Construction Fence
S01200943-I1-FN
03/26/2025
Filed — Alteration
Installation of a temporary wood and chain link construction fence around the entire perimeter of the fire damaged premise. Please be advised there is an Emergency Work Order at this premise. Fence installed to comply with DOB vio 19084.
S01200943-I1
03/24/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/24/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/24/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/22/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/09/2001
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE401/09/2026
BGM ENGINEERING106/05/2025
RONALD D.VICTORIO R.A.103/26/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
THINK DESIGN ARCHITECTURE503/21/2026
APRILE BONAMO FILING REP103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RIGHTWAY RENOVATIONS CORPGeneral Contractor704/09/2026
DUO PLUMBING & HTG CORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BGM ENGINEERING, LLC1514501/09/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRIGHTWAY RENOVATIONS CORP12/04/2025
DOB NOWGeneral ConstructionSigned-offRIGHTWAY RENOVATIONS CORP12/04/2025
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.07/07/2025
DOB NOWGeneral ConstructionSigned-offRIGHTWAY RENOVATIONS CORP07/01/2025
DOB NOWGeneral ConstructionSigned-offRIGHTWAY RENOVATIONS CORP07/01/2025
DOB NOWConstruction FenceSigned-offRIGHTWAY RENOVATIONS CORP03/31/2025
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
02/10/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/30/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/27/2026Fail-Final General Construction Non-Directive 14FailView ↗
01/16/2026Pass-Final General Construction Non-Directive 14PassView ↗
12/16/2025Fail-Final General Construction Non-Directive 14FailView ↗
10/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
01/16/2026Duct leakage testing, insulation and designRAUL VELASQUEZ MARTINEZenergy_progress
01/16/2026Structural Wood FrameRAUL VELASQUEZ MARTINEZprogress
01/16/2026Fire-Resistance Rated ConstructionRAUL VELASQUEZ MARTINEZprogress
01/16/2026Fenestration air leakageRAUL VELASQUEZ MARTINEZenergy_progress
01/16/2026Air barrier - visual inspectionRAUL VELASQUEZ MARTINEZenergy_progress
01/16/2026Insulation placement and R valuesRAUL VELASQUEZ MARTINEZenergy_progress
01/16/2026Interior lighting powerRAUL VELASQUEZ MARTINEZenergy_progress
01/16/2026Fenestration areasRAUL VELASQUEZ MARTINEZenergy_progress
01/16/2026Fenestration and door U-factor and product ratingsRAUL VELASQUEZ MARTINEZenergy_progress
01/16/2026Structural Stability – Alterations of existing buildingsRAUL VELASQUEZ MARTINEZspecial
01/16/2026Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
01/16/2026FinalRAUL VELASQUEZ MARTINEZprogress
01/16/2026Energy Code Compliance InspectionsRAUL VELASQUEZ MARTINEZprogress
10/07/2025HVAC-R and service water heating system controlsRAUL VELASQUEZ MARTINEZenergy_progress
10/07/2025HVAC-R and service water piping design and insulationRAUL VELASQUEZ MARTINEZenergy_progress
10/07/2025Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
10/07/2025Energy Code Compliance InspectionsRAUL VELASQUEZ MARTINEZprogress
10/07/2025HVAC-R and service water heating equipmentRAUL VELASQUEZ MARTINEZenergy_progress
04/15/2025DemolitionRAUL VELASQUEZ MARTINEZspecial
04/07/2025FinalRAUL VELASQUEZ MARTINEZprogress
04/07/2025Structural Stability – Alterations of existing buildingsRAUL VELASQUEZ MARTINEZspecial
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/19/2026S01200943-I1Request digital key ↗
08/19/2026S01206680-I1Request digital key ↗
08/19/2026S01236628-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/19/2026S01206680-I1Open ↗
08/13/2026S01236628-P2Open ↗
08/13/2026S01236628-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/27/2026S01206680-I1Open ↗
08/27/2026S01236628-S1Open ↗
08/27/2026S01236628-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026S01206680-I1Open ↗
08/27/2026S01236628-S1Open ↗
08/23/2026S01236628-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/19/2026S01206680-I1Open ↗
08/13/2026S01236628-P1Open ↗
08/13/2026S01236628-I1Open ↗
Showing 3 of 5 on file for this type