← Back
Two stories - detached, small or mid-size
75 CEDAR TERRACE
STATEN ISLAND · BIN 5016078
💬 Discuss this project
2023Year Built
3Stories
A1Building Class
R3AZoning
1,770 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 3,000 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 332p · 1 filing · 20 docs
Floor 233p · 1 filing · 20 docs
Floor 132p · 1 filing · 20 docs
Basement32p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CAPELLEN HOLDINGS LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CUTRONA ARCHITECTURE PLLC512/19/2023
A TECH ENGINEERING NYC, PLLC.101/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS1003/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REGAL RECONSTRUCTION CORP.General Contractor507/08/2026
JED 74 LLCGeneral Contractor307/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738512/19/2023
Building Lifecycle
All (119)Filed (7)Permit Issued (8)Signed Off (3)Violation (14)Inspection (15)Objection (42)Special Inspection (30)
01/18/2024
Special inspection requirement — Ventilation and air distribution system
anthony santoro
01/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
01/18/2024
Special inspection requirement — Structural Steel - Welding
anthony santoro
01/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
01/18/2024
Special inspection requirement — Fenestration areas
anthony santoro
01/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
01/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
01/18/2024
Special inspection requirement — Mechanical Systems
anthony santoro
01/18/2024
Special inspection requirement — Structural Steel - High Strength Bolting
anthony santoro
01/18/2024
Special inspection requirement — Insulation placement and R values
anthony santoro
01/18/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
01/18/2024
Special inspection requirement — Fenestration air leakage
anthony santoro
01/18/2024
Special inspection requirement — Maintenance information
anthony santoro
01/18/2024
Special inspection requirement — Interior lighting power
anthony santoro
01/18/2024
Special inspection requirement — Footing and Foundation
anthony santoro
01/18/2024
Special inspection requirement — Final
anthony santoro
01/18/2024
Special inspection requirement — Heating Systems
anthony santoro
01/18/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
01/18/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
anthony santoro
01/18/2024
Special inspection requirement — Subgrade Inspections
anthony santoro
01/18/2024
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
01/18/2024
Special inspection requirement — Structural Steel - Details
anthony santoro
01/18/2024
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
01/18/2024
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
01/18/2024
Special inspection requirement — Permanent certificate
anthony santoro
01/18/2024
Special inspection requirement — Air barrier - visual inspection
anthony santoro
01/18/2024
Special inspection requirement — Air barrier — testing
anthony santoro
01/18/2024
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
01/18/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
12/19/2023
Filed — New Building
NEW BUILDING FILING FOR ONE FAMILY RESIDENCE.
S08002375-P3
12/15/2023
Special inspection requirement — Air barrier - visual inspection
anthony santoro
12/11/2023
Signed off — Alteration
S00024861-I1
12/01/2023
Objection resolved — Addressed
11/27/2023
Objection raised — Other
11/16/2023
Signed off — New Building
NEW BUILDING FILING FOR ONE FAMILY RESIDENCE.
S08002375-S1
11/10/2023
Objection resolved — Addressed
11/10/2023
Objection resolved — Addressed
11/09/2023
Objection resolved — Addressed
11/08/2023
Objection raised — Other
11/08/2023
Objection raised — Other
11/08/2023
Objection raised — Other
11/01/2023
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
S08007915-I1
10/24/2023
Filed — New Building
NEW BUILDING FILING FOR ONE FAMILY RESIDENCE.
S08002375-P2
10/19/2023
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
10/18/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/18/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/04/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/25/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/20/2023
Filed — New Building
NEW BUILDING FILING FOR ONE FAMILY RESIDENCE.
S08002375-P1
09/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/14/2023
Permit issued — Structural
S08002375-I1-GC-CX
06/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/23/2023
Permit issued — Plumbing
S08007915-I1-PL
03/10/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/01/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedJED 7407/14/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR05/23/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR02/02/2023
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC01/30/2023
DOB NOWGeneral ConstructionPermit IssuedJED 7401/18/2023
DOB NOWConstruction FenceSigned-offREGAL RECONSTRUCTION CORP11/23/2020
DOB NOWConstruction FenceSigned-offREGAL RECONSTRUCTION CORP02/07/2019
DOB NOWConstruction FenceSigned-offREGAL RECONSTRUCTION CORP03/14/2018
BIS—ISSUEDREGAL RECONSTRUCTION CORP.05/10/2018
1 job · most recent 12/19/2023
Associated Ducts and Piping Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/19/2023Permit IssuedJED 74 LLCAssociated Ducts and Piping, Heating and Air Conditioning Systems
Heat / Cool
Ruud R92TA0601317M4SA - 92% AFUE 52,000 BTU · Furnace ×2
R92TA0601317MSA - 92% AFUE 52,000 BTU · Furnace ×2
RA14AZ24AJ1NA+RBHP-17A00NH1 23,600 BTU · Split System ×2
RA14AZ24AJ1NA+RCFL-HU2617TU136+ROCA-070E04 24,000 BTU · Split System ×2
Trane 4TTR4018L1+4TXCB003DS3+S9X1B040U3PSB 19,200 BTU · Split System ×2
S9X1B040U3PSB - 96% AFUE 39,000 BTU · Furnace ×2
Ducts & Piping
Generic GENERIC 1 CFM ×3
1 job · most recent 12/19/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/19/2023Signed-offQUALITY PLUMBING, INCGas, Storm, Water/Sanitary
2 jobs · most recent 06/05/2023
General Wiring
FiledStatusContractorScope
06/05/2023CompleteMANGI ELECTRICAL CORPGeneral Wiring
02/16/2023CancelledMANGI ELECTRICAL CORP1 meters, 1 new_meters
1 job · most recent 12/19/2023
Steel Concrete Wood
FiledStatusContractorScope
12/19/2023Permit IssuedJED 74 LLCSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
10/19/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
10/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/04/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/25/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/19/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/11/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/10/2023Pass-Final PL - UndergroundPassView ↗
03/01/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/27/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 95
DateRequirementInspectorRole
01/18/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
01/18/2024Footing and Foundationanthony santoroprogress
01/18/2024Finalanthony santoroprogress
01/18/2024Fire-Resistant Penetrations and Jointsanthony santorospecial
01/18/2024Heating Systemsanthony santorospecial
01/18/2024Subsurface Investigations (Borings/Test Pits)anthony santorospecial
01/18/2024Mechanical Systemsanthony santorospecial
01/18/2024Structural Steel - Weldinganthony santorospecial
01/18/2024Exterior Insulation and Finish Systems (EIFS)anthony santorospecial
01/18/2024Subgrade Inspectionsanthony santorospecial
01/18/2024Structural Steel - High Strength Boltinganthony santorospecial
01/18/2024Concrete - Cast-In-Placeanthony santorospecial
01/18/2024Structural Steel - Detailsanthony santorospecial
01/18/2024Insulation placement and R valuesanthony santoroenergy_progress
01/18/2024HVAC-R and service water heating equipmentanthony santoroenergy_progress
01/18/2024Ventilation and air distribution systemanthony santoroenergy_progress
01/18/2024Duct leakage testing, insulation and designanthony santoroenergy_progress
01/18/2024Electric vehicle service equipment requirementsanthony santoroenergy_progress
01/18/2024Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
01/18/2024Permanent certificateanthony santoroenergy_progress
01/18/2024Air barrier - visual inspectionanthony santoroenergy_progress
01/18/2024Fenestration air leakageanthony santoroenergy_progress
01/18/2024Fenestration areasanthony santoroenergy_progress
01/18/2024Air barrier — testing anthony santoroenergy_progress
01/18/2024Protection of exposed foundation insulationanthony santoroenergy_progress
Latest 25 of 95.
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026S00024861-I1Request digital key ↗
08/24/2026S08002375-P3Request digital key ↗
08/24/2026S08002375-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
02/04/2022520462632Open ↗
07/28/2021520462632Open ↗
02/08/2018520326095Open ↗
▸BISWORK PERMIT APPLICATION1
05/11/2018520326095Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram3
08/24/2026S08002375-I1Open ↗
08/15/2026S08002375-P2Open ↗
08/13/2026S08002375-P3Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/24/2026S08002375-I1Open ↗
08/15/2026S08002375-P2Open ↗
08/13/2026S08002375-P3Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
01/19/2022520462632Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S08002375-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWSpecial Inspector Seal & Signature11
09/02/2026S08002375-S1Open ↗
09/02/2026S08002375-S1Open ↗
08/28/2026S08002375-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026S08002375-S1Open ↗
08/28/2026S08002375-P2Open ↗
08/28/2026S08002375-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026S08002375-P2Open ↗
08/24/2026S08002375-I1Open ↗
08/24/2026S08002375-S1Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/24/2026S08002375-I1Open ↗
08/15/2026S08002375-P2Open ↗
08/13/2026S08002375-P3Open ↗
▸BISGAS CUT-OFF1
05/11/2018520326095Open ↗
▸BISWATER CUT-OFF1
05/11/2018520326095Open ↗
▸BISELECTRIC CUT-OFF1
05/11/2018520326095Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/24/2026S08002375-I1Open ↗
08/15/2026S08002375-P2Open ↗
08/13/2026S08002375-P3Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
05/11/2018520326095Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S08002375-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S08002375-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/11/2018520326095Open ↗
▸BISRODENT CONTROL1
05/11/2018520326095Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT5
08/24/2026S08002375-I1Open ↗
08/15/2026S08002375-S1Open ↗
08/15/2026S08002375-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S08002375-S1Open ↗
08/13/2026S08002375-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/19/2022520462632Open ↗
05/11/2018520326095Open ↗
▸BISLANDMARKS APPROVAL1
05/11/2018520326095Open ↗
▸BISBSA/CPC APPROVAL1
02/08/2022520462632Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
02/08/2018520326095Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
05/11/2018520326095Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
07/28/2021520462632Open ↗
02/08/2018520326095Open ↗
▸BISADDITIONAL INFORMATION1
02/08/2022520462632Open ↗
▸Other Documents14
▸DOB NOWSite Survey: Initial3
08/24/2026S08002375-I1Open ↗
08/15/2026S08002375-P2Open ↗
08/13/2026S08002375-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/24/2026S08002375-I1Open ↗
08/15/2026S08002375-P2Open ↗
08/13/2026S08002375-P3Open ↗
▸DOB NOWProperty Ownership Certification3
08/24/2026S08002375-I1Open ↗
08/15/2026S08002375-P2Open ↗
08/13/2026S08002375-P3Open ↗
▸BISPLOT DIAGRAM2
02/08/2022520462632Open ↗
01/19/2022520462632Open ↗
▸BISCOMMUNITY BOARD NOTIFICATION1
05/11/2018520326095Open ↗
▸BISSTREET: UNMAPPED-NOTIFY EMERG. AGENCIES1
02/08/2022520462632Open ↗
▸DOB NOWFinal Survey1
08/13/2026S08002375-I1Open ↗