← Back
One story - permanent living quarter
120 CAMPUS ROAD
STATEN ISLAND · BIN 5016139
💬 Discuss this project
1950Year Built
1.67Stories
A2Building Class
R1-2Zoning
1,866 sfGross Floor Area
1Units
One story - permanent living quarter · 19,350 sf lot · 0.1 FAR built · Flood zone X
Locations of Work
Architecture
Basement2p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALFRED V SAULO, ARCHITECT PC108/20/2026
LAURIA ASSOCIATES202/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LAURIA ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LIGHTNIN ELECTRIC INCElectrical103/22/2026
MAXIMUM CONTRACTING INCGeneral Contractor109/01/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAURIA ASSOCIATES7570202/12/2024
Building Lifecycle
All (15)Filed (3)Permit Issued (2)Signed Off (1)Inspection (4)Objection (4)Special Inspection (1)
08/31/2026
Permit issued — Construction Fence
S01448295-I1-FN
08/20/2026
Filed — Alteration
TEMPORARY CONSTRUCTION FENCE (DOB NOW FILING), AS THIS APPLICATION FILED IN CONJUNCTION WITH BIS ALT TYPE I PER DOB JOB NO. 520389614, APPROVED 07-01-26, AS THE PROPOSED ALTERATION WORK SHALL COMMENCE SHORTLY.
S01448295-I1
02/26/2024
Signed off — Alteration
Install new bathroom on second floor (previously was attic.) Install new gas clothes dryer in the basement (previously was cellar).
S00207714-I1
02/16/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/12/2024
Filed — Alteration
Install new bathroom on second floor (previously was attic.) Install new gas clothes dryer in the basement (previously was cellar).
S00207714-P1
11/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD LAURIA
09/19/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/19/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/03/2023
Permit issued — Plumbing
S00207714-I1-PL
01/17/2020
Objection resolved — Addressed
01/17/2020
Objection resolved — Addressed
09/12/2019
Objection raised — Plumbing
09/12/2019
Objection raised — Plumbing
09/09/2019
Filed — Alteration
Install new bathroom on second floor (previously was attic.) Install new gas clothes dryer in the basement (previously was cellar).
S00207714-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedMAXIMUM CONTRACTING INC08/31/2026
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC05/03/2023
BIS—ISSUEDNEGLIACCIO.IMPROVEMENTS01/09/2023
3 projects · most recent 09/29/2026
General Wiring
FiledStatusContractorScope
09/29/2026Permit IssuedALLSTATE ELECTRIC NYC LLC1 meters, 1 new_meters
06/18/2026Permit IssuedALLSTATE ELECTRIC NYC LLCGeneral Wiring
06/25/2024CompleteLIGHTNIN ELECTRIC INCGeneral Wiring
1 project · most recent 08/20/2026
Fence
FiledStatusContractorScope
08/20/2026Permit IssuedMAXIMUM CONTRACTING INCFence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/16/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/19/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
11/10/2023Fire-Resistant Penetrations and JointsEDWARD LAURIAspecial
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Plumbing2
08/21/2026S00207714-P1Request digital key ↗
08/21/2026S00207714-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/21/2026S01448295-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION8
11/12/2025520389614Open ↗
10/01/2025520389614Open ↗
06/13/2025520389614Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION1
01/09/2023520389614Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/11/2024520389614Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026S01448295-I1Open ↗
08/13/2026S00207714-P1Open ↗
08/13/2026S00207714-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/13/2020520389614Open ↗
08/09/2019520389614Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/27/2026S00207714-P1Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
08/09/2019520389614Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026S00207714-P1Open ↗
08/13/2026S00207714-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/09/2019520389614Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/13/2020520389614Open ↗
08/09/2019520389614Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/19/2022520389614Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/18/2022520389614Open ↗
▸Approvals, Objections & Sign-offs7
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/06/2020520389614Open ↗
01/06/2020520389614Open ↗
01/06/2020520389614Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE3
01/16/2020520389614Open ↗
12/17/2019520389614Open ↗
08/09/2019520389614Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/09/2019520389614Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
08/09/2019520389614Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
01/13/2020520389614Open ↗
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM1
03/15/2022520389614Open ↗
▸BISEFILING COVER SHEET1
08/09/2019520389614Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
01/13/2020520389614Open ↗