← Back
Professional building / stand-alone funeral home
71 TODT HILL ROAD
STATEN ISLAND · BIN 5017364
💬 Discuss this project
1990Year Built
2Stories
O7Building Class
R2Zoning
7,600 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Professional building / stand-alone funeral home · Owner of record: 71 TODT HILL LLC · 9,425 sf lot · 0.81 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction4p · 1 filing · 13 docs
CellarUnder Construction4p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TARANTO CONSTRUCTION CO103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RYAN DESIGN ARCHITECTURE206/30/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZAIM CONTRACTOR CORPGeneral Contractor109/02/2026
MT ENERGY INCPlumbing107/10/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN DESIGN ARCHITECTURE7159206/30/2026
Building Lifecycle
All (39)Filed (2)Permit Issued (2)Violation (18)Inspection (1)Objection (2)Special Inspection (14)
09/04/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/01/2026
Permit issued — General Construction
S01187479-I1-GC
07/08/2026
Permit issued — Plumbing
S01187479-S1-PL
06/30/2026
Filed — Alteration CO
interior to convert first floor from AMBULATORY HEALTH FACILITY to 2 dwelling units , cellar to remain 1 AMBULATORY HEALTH FACILITY
S01187479-S1
06/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
Daniel Ryan
06/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Ryan
06/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
Daniel Ryan
06/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Daniel Ryan
04/07/2026
Objection resolved — Resolved
03/23/2026
Special inspection requirement — Lighting controls
Daniel Ryan
03/23/2026
Special inspection requirement — Metering
Daniel Ryan
03/23/2026
Special inspection requirement — Permanent certificate
Daniel Ryan
03/23/2026
Special inspection requirement — Insulation placement and R values
Daniel Ryan
03/23/2026
Special inspection requirement — Air barrier - visual inspection
Daniel Ryan
03/23/2026
Special inspection requirement — Lighting in dwelling units
Daniel Ryan
03/14/2025
Objection raised — Zoning
03/10/2025
Filed — Alteration CO
interior to convert first floor from AMBULATORY HEALTH FACILITY to 2 dwelling units , cellar to remain 1 AMBULATORY HEALTH FACILITY
S01187479-I1
02/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Ryan
02/27/2025
Special inspection requirement — Interior lighting power
Daniel Ryan
02/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
Daniel Ryan
02/27/2025
Special inspection requirement — Energy Code Compliance Inspections
Daniel Ryan
02/26/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/06/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/18/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/06/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/13/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/13/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/13/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/27/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/16/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/15/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/20/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/23/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/06/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/13/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/13/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/26/1991
Violation issued (ECB, closed)
Construction
04/25/1991
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/09/1990
Violation issued (ECB, closed)
Site Safety
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedZAIM CONTRACTOR CORP09/01/2026
DOB NOWPlumbingPermit IssuedMT ENERGY INC07/08/2026
3 projects · most recent 09/16/2026
General Wiring
FiledStatusContractorScope
09/16/2026Permit IssuedLENS ELECTRIC, INCGeneral Wiring
09/16/2026CompleteLENS ELECTRIC, INC—
12/06/2023CompleteJ.T. ELEC'L CONST. INCGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/04/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
06/22/2026HVAC-R and service water heating system controlsDaniel Ryanenergy_progress
06/22/2026Fire-Resistant Penetrations and JointsDaniel Ryanspecial
06/22/2026HVAC-R and service water heating equipmentDaniel Ryanenergy_progress
06/22/2026HVAC-R and service water piping design and insulationDaniel Ryanenergy_progress
03/23/2026Lighting controlsDaniel Ryanenergy_progress
03/23/2026MeteringDaniel Ryanenergy_progress
03/23/2026Permanent certificateDaniel Ryanenergy_progress
03/23/2026Insulation placement and R valuesDaniel Ryanenergy_progress
03/23/2026Air barrier - visual inspectionDaniel Ryanenergy_progress
03/23/2026Lighting in dwelling unitsDaniel Ryanenergy_progress
02/27/2025Fire-Resistant Penetrations and JointsDaniel Ryanspecial
02/27/2025Interior lighting powerDaniel Ryanenergy_progress
02/27/2025Fire-Resistance Rated ConstructionDaniel Ryanprogress
02/27/2025Energy Code Compliance InspectionsDaniel Ryanprogress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026S01187479-S1Request digital key ↗
08/20/2026S01187479-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01187479-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026S01187479-I1Open ↗
09/01/2026S01187479-I1Open ↗
09/01/2026S01187479-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026S01187479-I1Open ↗
09/01/2026S01187479-S1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026S01187479-S1Open ↗
08/13/2026S01187479-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026S01187479-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/13/2026S01187479-I1Open ↗