Banking facility, with or without parking
1890 VICTORY BOULEVARD
STATEN ISLAND · BIN 5018121
💬 Discuss this project
1951Year Built
1Stories
K7Building Class
R3-2Zoning
3,570 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Banking facility, with or without parking · Owner of record: PATH LAND HOLDINGS LLC · 15,260 sf lot · 0.23 FAR built
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 08/07/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/07/2026——Gas, Water/Sanitary
2 jobs · most recent 07/15/2026
General Wiring
FiledStatusContractorScope
07/15/2026Pending Payment VerificationLABCO ELETRT CONTNG CORPGeneral Wiring
11/12/2019Permit IssuedTRUE ELECTRIC CORP.3 meters
1 job · most recent 06/26/2026
Fence
FiledStatusContractorScope
06/26/2026Permit IssuedJOHN EVAN CONTRACTING CORFence
Building Lifecycle
All (32)Filed (6)Permit Issued (1)Violation (2)Special Inspection (23)
08/07/2026
Filed — Alteration
APPLICATION FILED TO RESOLVE OATH/ECB VIOLATIONS. PROPOSED NEW GAS ANDPLUMBING FIXTURES TO BE INSTALLED AT CELLAR, FIRST, AND SECOND FLOORSFOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
S01441833-I1
08/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
SOHAIL HUMAYUN
08/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SOHAIL HUMAYUN
08/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
SOHAIL HUMAYUN
08/07/2026
Special inspection requirement — Maintenance information
SOHAIL HUMAYUN
08/07/2026
Special inspection requirement — Energy Code Compliance Inspections
SOHAIL HUMAYUN
07/29/2026
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
07/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
07/29/2026
Special inspection requirement — Mechanical Systems
Younes Abouyaala
07/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
07/29/2026
Special inspection requirement — Final
NAVEEN KUMAR
07/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
07/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
07/27/2026
Filed — Alteration
S01421317-P1
07/21/2026
Special inspection requirement — Air barrier - visual inspection
07/21/2026
Special inspection requirement — Final
07/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/21/2026
Special inspection requirement — Mechanical Systems
07/21/2026
Special inspection requirement — Energy Code Compliance Inspections
07/16/2026
Permit issued — Construction Fence
S01421231-I1-FN
07/13/2026
Violation issued (ECB, closed)
Unknown
07/09/2026
Filed — Alteration
S01421317-I1
07/09/2026
Filed — Alteration
S01421317-S1
07/09/2026
Filed — Alteration
S01421317-S3
07/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
07/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
07/07/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
07/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
06/26/2026
Filed — Alteration
APPLICATION IS FILED FOR THE INSTALLATION OF 8'-0' HIGH PLYWOOD TEMPORARY CONSTRUCTION FENCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. ALL WORK AS PER PLANS SUBMITTED HEREWITH
S01421231-I1
12/06/1989
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZHL GROUP109/01/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOHAIL HUMAYUN P E INC108/07/2026
THINK DESIGN ARCHITECTURE507/27/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOHN EVAN CONTRACTING CORGeneral Contractor107/17/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519107/09/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedJOHN EVAN CONTRACTING COR07/16/2026
BISPLISSUEDLOUIS L.BUTTERMARK & SONS12/14/2004
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
08/07/2026HVAC-R and service water heating system controlsSOHAIL HUMAYUNenergy_progress
08/07/2026HVAC-R and service water piping design and insulationSOHAIL HUMAYUNenergy_progress
08/07/2026HVAC-R and service water heating equipmentSOHAIL HUMAYUNenergy_progress
08/07/2026Maintenance informationSOHAIL HUMAYUNenergy_progress
08/07/2026Energy Code Compliance InspectionsSOHAIL HUMAYUNprogress
07/29/2026Air barrier - visual inspectionYounes Abouyaalaenergy_progress
07/29/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
07/29/2026Mechanical SystemsYounes Abouyaalaspecial
07/29/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
07/29/2026FinalNAVEEN KUMARprogress
07/29/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
07/29/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
07/21/2026Air barrier - visual inspection—energy_progress
07/21/2026Final—progress
07/21/2026HVAC-R and service water piping design and insulation—energy_progress
07/21/2026HVAC-R and service water heating equipment—energy_progress
07/21/2026HVAC-R and service water heating system controls—energy_progress
07/21/2026Mechanical Systems—special
07/21/2026Energy Code Compliance Inspections—progress
07/07/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
07/07/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
07/07/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
07/07/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/16/2026S01421231-I1Request digital key ↗
08/16/2026S01421317-I1Request digital key ↗
08/16/2026S01421317-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/16/2026S01421231-I1Open ↗
08/16/2026S01421317-I1Open ↗
08/16/2026S01421317-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/27/2026S01421317-I1Open ↗
08/27/2026S01421317-I1Open ↗
08/27/2026S01421317-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026S01421317-S2Open ↗
08/27/2026S01421317-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/16/2026S01421317-I1Open ↗
08/16/2026S01421317-S3Open ↗
08/16/2026S01421317-S1Open ↗
Showing 3 of 5 on file for this type