← Back
One story retail building
1936 VICTORY BOULEVARD
STATEN ISLAND · BIN 5018166
💬 Discuss this project
1931Year Built
1Stories
K1Building Class
R3-2Zoning
2,574 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
One story retail building · 8,000 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction4p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NE METHOD SERVICE103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
S & S ARCHITECTURAL DESIGN,LLC202/04/2026
STEVEN R. SAVINO ARCHITECT PC307/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MMSR CONSULTING GROUP LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MKSSKR CONSULTING SERVICEGeneral Contractor104/09/2026
DYNAMIC PLBG & SPRKLR CORPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDTECH ENGINEERING6369112/22/2025
RELIANCE ENGINEERING, P.C322102/20/2020
Building Lifecycle
All (37)Filed (5)Permit Issued (4)Signed Off (2)Violation (4)Inspection (3)Objection (14)Special Inspection (5)
08/11/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/24/2026
Permit issued — Plumbing
S01330908-S1-PL
03/19/2026
Permit issued — General Construction
S01330908-I1-GC
03/19/2026
Objection resolved — Addressed
03/19/2026
Objection resolved — Addressed
03/19/2026
Objection resolved — Addressed
03/19/2026
Objection resolved — Addressed
03/12/2026
Objection resolved — Addressed
02/18/2026
Objection raised — Plumbing
02/18/2026
Objection raised — Plumbing
02/18/2026
Objection raised — Cost
02/18/2026
Objection raised — Plumbing
02/18/2026
Objection raised — Plumbing
02/16/2026
Objection resolved — Addressed
02/04/2026
Filed — Alteration
Interior renovation to 1st floor commercial store Laundromat as per plans. No change on use, occupancy or egress.
S01330908-S1
01/30/2026
Objection resolved — Addressed
12/29/2025
Objection raised — Scope
12/29/2025
Objection raised — Cost
12/22/2025
Filed — Alteration
Interior renovation to 1st floor commercial store Laundromat as per plans. No change on use, occupancy or egress.
S01330908-I1
12/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
12/09/2025
Special inspection requirement — Final
RONALD VILLANO
07/27/2021
Signed off — Alteration
SUBSEQUENT FILING TO CORRECT THE ORIGINAL PLANS FILED UNDER APPLICATION NO. S00432388 TO SHOW THE CORRECT BTU RATING OF THE BOILER AND THE MATERIAL OF THE CHIMNEY AND TO CORRECT THE FILING TO CHANGE THE CHIMNEY MATERIAL TO TERRACOTTA.
S00432388-I1
07/26/2021
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/19/2021
Filed — Alteration
SUBSEQUENT FILING TO CORRECT THE ORIGINAL PLANS FILED UNDER APPLICATION NO. S00432388 TO SHOW THE CORRECT BTU RATING OF THE BOILER AND THE MATERIAL OF THE CHIMNEY AND TO CORRECT THE FILING TO CHANGE THE CHIMNEY MATERIAL TO TERRACOTTA.
S00432388-S1
06/29/2021
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
06/24/2021
Permit issued — Boiler Equipment
S00432388-I1-BE
06/11/2021
Filed — Alteration
SUBSEQUENT FILING TO CORRECT THE ORIGINAL PLANS FILED UNDER APPLICATION NO. S00432388 TO SHOW THE CORRECT BTU RATING OF THE BOILER AND THE MATERIAL OF THE CHIMNEY AND TO CORRECT THE FILING TO CHANGE THE CHIMNEY MATERIAL TO TERRACOTTA.
S00432388-I1
12/07/2020
Special inspection requirement — HVAC and service water heating system controls
Steven Savino
12/07/2020
Special inspection requirement — HVAC and service water heating equipment
Steven Savino
09/18/2020
Signed off — Alteration
IN-KIND REPLACEMENT OF A 275 GAL. ABOVE GROUND FUEL OIL TANK LOCATED TO THE OUTSIDE OF THE BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00297351-I1
03/02/2020
Permit issued — Boiler Equipment
S00297351-I1-BE
02/20/2020
Filed — Alteration
IN-KIND REPLACEMENT OF A 275 GAL. ABOVE GROUND FUEL OIL TANK LOCATED TO THE OUTSIDE OF THE BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00297351-I1
01/15/2020
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Ralph Giorgio
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/01/1988
Violation issued (ECB, open)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedDYNAMIC PLBG & SPRKLR COR04/24/2026
DOB NOWGeneral ConstructionPermit IssuedMKSSKR CONSULTING SERVICE03/19/2026
DOB NOWBoiler EquipmentSigned-offNEW YORK HEATING CORP06/24/2021
DOB NOWBoiler EquipmentPermit IssuedSCARAN OIL SERVICE CO INC03/02/2020
BISOTISSUEDSCARAN OIL SERVICE INC01/22/2020
1 project · most recent 02/04/2026
Gas Water/Sanitary
FiledStatusContractorScope
02/04/2026Permit IssuedDYNAMIC PLBG & SPRKLR CORGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/11/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/26/2021Pass-Final Boiler Equipment InspectionPassView ↗
06/29/2021Fail-Final Boiler Equipment InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/09/2025Fire-Resistant Penetrations and JointsLuis Pichardospecial
12/09/2025FinalRONALD VILLANOprogress
12/07/2020HVAC and service water heating system controls Steven Savinoenergy_progress
12/07/2020HVAC and service water heating equipment Steven Savinoenergy_progress
01/15/2020Fuel-Oil Storage and Fuel-Oil Piping SystemsRalph Giorgiospecial
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch3
08/25/2026S00432388-S1Request digital key ↗
08/17/2026S01330908-I1Request digital key ↗
08/17/2026S01330908-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
08/25/2026S00432388-I1Request digital key ↗
08/15/2026S00297351-I1Request digital key ↗
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION1
01/23/2020520396937Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
01/16/2020520396937Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026S00297351-I1Open ↗
08/25/2026S00432388-I1Open ↗
08/25/2026S00432388-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026S00432388-I1Open ↗
09/23/2026S00432388-I1Open ↗
08/30/2026S01330908-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026S00297351-I1Open ↗
08/30/2026S01330908-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/16/2020520396937Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/16/2020520396937Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/16/2020520396937Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00432388-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/18/2020520396937Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/18/2020520396937Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
01/16/2020520396937Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/18/2020520396937Open ↗
01/16/2020520396937Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
01/16/2020520396937Open ↗