← Back
Two stories - detached, small or mid-size
41 PERRY AVENUE
STATEN ISLAND · BIN 5018282
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R3-1Zoning
2,160 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,360 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M-CON ENGINEERING, PC108/16/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOURCE ELECTRIC INCElectrical103/22/2026
SUSTAINABLE STRATEGIESGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M-CON ENGINEERING7341108/16/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
12/17/2024
Signed off — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
S01097488-I1
08/20/2024
Permit issued — Solar
S01097488-I1-SL
08/16/2024
Filed — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
S01097488-I1
08/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michelle Contri
08/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michelle Contri
08/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Michelle Contri
08/16/2024
Special inspection requirement — Final
Michelle Contri
08/16/2024
Special inspection requirement — Air barrier - visual inspection
Michelle Contri
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUSTAINABLE STRATEGIES08/20/2024
1 project · most recent 08/07/2024
FiledStatusContractorScope
08/07/2024CompleteSOURCE ELECTRIC INC1 meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/16/2024Fire-Resistant Penetrations and JointsMichelle Contrispecial
08/16/2024Structural Stability – Alterations of existing buildingsMichelle Contrispecial
08/16/2024Energy Code Compliance InspectionsMichelle Contriprogress
08/16/2024FinalMichelle Contriprogress
08/16/2024Air barrier - visual inspectionMichelle Contrienergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026S01097488-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026S01097488-I1Open ↗
08/25/2026S01097488-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026S01097488-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026S01097488-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026S01097488-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01097488-I1Open ↗