← Back
Two stories - detached, small or mid-size
11 QUEEN STREET
STATEN ISLAND · BIN 5019264
💬 Discuss this project
1920Year Built
1.5Stories
A1Building Class
R3XZoning
1,550 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
Architecture
Floor 210p · 1 filing · 20 docs
Floor 110p · 1 filing · 20 docs
Basement10p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CSGUDE ARCHITECTURE, PC412/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MICHAEL ROWE CONSULTING AND EXPEDIT803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZAIM CONTRACTOR CORPGeneral Contractor307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CSGUDE ARCHITECTURE PC7350312/06/2023
Building Lifecycle
All (32)Filed (4)Permit Issued (2)Signed Off (1)Inspection (5)Objection (10)Special Inspection (10)
03/05/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/20/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
CANDIDO GUDE
12/20/2023
Special inspection requirement — Concrete - Cast-In-Place
CANDIDO GUDE
12/20/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
CANDIDO GUDE
12/20/2023
Special inspection requirement — Fire-Resistance Rated Construction
CANDIDO GUDE
12/20/2023
Special inspection requirement — Energy Code Compliance Inspections
CANDIDO GUDE
12/06/2023
Filed — Alteration CO
PROPOSED GARAGE IN BASEMENT
S00655708-P3
08/22/2023
Filed — Alteration CO
PROPOSED GARAGE IN BASEMENT
S00655708-P2
08/14/2023
Special inspection requirement — Concrete - Cast-In-Place
CANDIDO GUDE
08/14/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
CANDIDO GUDE
08/14/2023
Special inspection requirement — Energy Code Compliance Inspections
CANDIDO GUDE
08/14/2023
Special inspection requirement — Fire-Resistance Rated Construction
CANDIDO GUDE
08/14/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
CANDIDO GUDE
05/11/2023
Signed off — Alteration
PROPOSED 10 FOOT WIDE CURB CUT.
S00655709-I1
03/16/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/14/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/10/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
01/31/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/27/2022
Permit issued — Curb Cut
S00655709-I1-CC
09/28/2022
Permit issued — General Construction
S00655708-I1-GC
05/15/2022
Objection resolved — Addressed
05/15/2022
Objection resolved — Addressed
05/15/2022
Objection resolved — Addressed
05/15/2022
Objection resolved — Addressed
03/24/2022
Objection raised — Zoning
03/24/2022
Objection raised — Scope
03/24/2022
Objection raised — Zoning
03/24/2022
Objection raised — Zoning
03/01/2022
Filed — Alteration CO
PROPOSED GARAGE IN BASEMENT
S00655708-I1
02/28/2022
Objection raised — Zoning
02/28/2022
Objection resolved — Addressed
02/26/2022
Filed — Alteration
PROPOSED 10 FOOT WIDE CURB CUT.
S00655709-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offSUFFOLK CONSTRUCT CO. INC12/27/2022
DOB NOWGeneral ConstructionPermit IssuedSUFFOLK CONSTRUCT CO. INC09/28/2022
2 projects · most recent 10/31/2023
General Wiring
FiledStatusContractorScope
10/31/2023CompleteD.R.P. ELEC'L CONTRG INCGeneral Wiring
09/20/2023CompleteRIDGE ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/05/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/16/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
03/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/10/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
01/31/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
12/20/2023Fenestration and door U-factor and product ratingsCANDIDO GUDEenergy_progress
12/20/2023Concrete - Cast-In-PlaceCANDIDO GUDEspecial
12/20/2023Structural Stability – Alterations of existing buildingsCANDIDO GUDEspecial
12/20/2023Fire-Resistance Rated ConstructionCANDIDO GUDEprogress
12/20/2023Energy Code Compliance InspectionsCANDIDO GUDEprogress
08/14/2023Concrete - Cast-In-PlaceCANDIDO GUDEspecial
08/14/2023Structural Stability – Alterations of existing buildingsCANDIDO GUDEspecial
08/14/2023Energy Code Compliance InspectionsCANDIDO GUDEprogress
08/14/2023Fire-Resistance Rated ConstructionCANDIDO GUDEprogress
08/14/2023Fenestration and door U-factor and product ratingsCANDIDO GUDEenergy_progress
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/22/2026S00655708-P2Request digital key ↗
08/22/2026S00655708-P3Request digital key ↗
08/14/2026S00655708-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00655708-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/22/2026S00655708-I1Open ↗
08/22/2026S00655708-P3Open ↗
08/22/2026S00655708-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026S00655708-P2Open ↗
08/28/2026S00655708-P2Open ↗
08/25/2026S00655708-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026S00655708-P2Open ↗
08/25/2026S00655708-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/22/2026S00655708-P2Open ↗
08/22/2026S00655708-P3Open ↗
08/14/2026S00655708-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00655708-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/22/2026S00655708-P2Open ↗
08/22/2026S00655708-P3Open ↗
08/14/2026S00655708-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00655708-I1Open ↗