← Back
One story - permanent living quarter
342 GANSEVOORT BOULEVARD
STATEN ISLAND · BIN 5021005
💬 Discuss this project
1955Year Built
1.5Stories
A2Building Class
R3XZoning
1,060 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story - permanent living quarter · 4,750 sf lot · 0.22 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction14p · 1 filing · 20 docs
Floor 1Under Construction16p · 2 filings · 20 docs
CellarUnder Construction18p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TO THE OWNER OF103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PINTO ENGINEERING CONSULTANT, DPC511/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PINTO STUDIO1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MOD CONSULTANTS LLCGeneral Contractor209/10/2026
ABLE PLBG CO RICHMOND INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PINTO ENGINEERING CONSULT9110111/17/2024
INTERNATIONAL GEOTEHCNICA1795108/05/2022
PINTO STUDIO INC6366308/05/2022
Building Lifecycle
All (53)Filed (5)Permit Issued (4)Violation (6)Objection (8)Special Inspection (30)
09/09/2026
Permit issued — General Construction
S00496266-S1-GC-CX
08/20/2026
Permit issued — Construction Fence
S01021459-I1-FN
02/04/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Rene Navarrete
02/03/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
11/17/2024
Filed — Alteration
S00496266-S1
09/24/2024
Special inspection requirement — Fenestration areas
Rene Navarrete
09/24/2024
Special inspection requirement — Interior lighting power
Rene Navarrete
09/24/2024
Special inspection requirement — Lighting in dwelling units
Rene Navarrete
09/24/2024
Special inspection requirement — Air barrier - visual inspection
Rene Navarrete
09/24/2024
Special inspection requirement — Insulation placement and R values
Rene Navarrete
09/24/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Rene Navarrete
09/24/2024
Special inspection requirement — Lighting controls
Rene Navarrete
09/24/2024
Special inspection requirement — Fenestration air leakage
Rene Navarrete
08/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rene Navarrete
08/19/2024
Special inspection requirement — Concrete - Cast-In-Place
Rene Navarrete
08/19/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Rene Navarrete
08/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Rene Navarrete
08/19/2024
Special inspection requirement — Final
Rene Navarrete
08/19/2024
Special inspection requirement — Footing and Foundation
Rene Navarrete
08/19/2024
Special inspection requirement — Fire-Resistance Rated Construction
Rene Navarrete
08/19/2024
Special inspection requirement — Energy Code Compliance Inspections
Rene Navarrete
04/12/2024
Objection resolved — Addressed
04/03/2024
Objection resolved — Addressed
03/25/2024
Objection resolved — Addressed
03/25/2024
Objection resolved — Addressed
03/22/2024
Objection raised — Scope
03/22/2024
Objection raised — Structural
03/22/2024
Objection raised — Scope
03/22/2024
Objection raised — Other
03/18/2024
Filed — Alteration
Installation of a temp. 8 Ft Plywood Fence along the entire perimeter
S01021459-I1
05/08/2023
Permit issued — Plumbing
S00496260-S1-PL
08/05/2022
Filed — Alteration
Subsequence to reconnect/install a gas meter, reconnect gas furnace, HWH, and stove. New gas dryer. Add shower and lavatory to cellar bath. Minor modifications to the kitchen and bathroom layout were approved under the initial legalization application.
S00496260-S1
03/10/2022
Permit issued — Plumbing
S00496260-I1-PL
06/30/2021
Filed — Alteration
Subsequence to reconnect/install a gas meter, reconnect gas furnace, HWH, and stove. New gas dryer. Add shower and lavatory to cellar bath. Minor modifications to the kitchen and bathroom layout were approved under the initial legalization application.
S00496260-I1
06/29/2021
Filed — Alteration
S00496266-I1
06/28/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
RENE NAVARRETE
04/05/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
RENE NAVARRETE
04/04/2021
Special inspection requirement — Final
RENE NAVARRETE
04/04/2021
Special inspection requirement — Fenestration air leakage
RENE NAVARRETE
04/04/2021
Special inspection requirement — Air barrier - visual inspection
RENE NAVARRETE
04/04/2021
Special inspection requirement — Lighting in dwelling units
RENE NAVARRETE
04/04/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
RENE NAVARRETE
04/04/2021
Special inspection requirement — Fenestration areas
RENE NAVARRETE
04/04/2021
Special inspection requirement — Interior lighting power
RENE NAVARRETE
04/04/2021
Special inspection requirement — Fire-Resistance Rated Construction
RENE NAVARRETE
04/04/2021
Special inspection requirement — Lighting controls
RENE NAVARRETE
04/04/2021
Special inspection requirement — Energy Code Compliance Inspections
RENE NAVARRETE
12/12/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/09/2018
Violation issued (ECB, closed)
Construction
10/29/2018
Violation issued (ECB, closed)
Construction
09/18/2018
Violation issued (ECB, closed)
Construction
09/18/2018
Violation issued (ECB, closed)
Unknown
09/17/2018
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMOD CONSULTANTS LLC09/09/2026
DOB NOWConstruction FencePermit IssuedMOD CONSULTANTS LLC08/20/2026
DOB NOWPlumbingPermit IssuedABLE PLBG CO RICHMOND INC05/08/2023
DOB NOWPlumbingPermit IssuedABLE PLBG CO RICHMOND INC03/10/2022
1 project · most recent 08/05/2022
Gas Water/Sanitary
FiledStatusContractorScope
08/05/2022Permit IssuedABLE PLBG CO RICHMOND INCGas, Water/Sanitary
3 projects · most recent 06/13/2023
General Wiring
FiledStatusContractorScope
06/13/2023Permit IssuedBNH ELECTRICAL CORPGeneral Wiring
03/02/2023Permit IssuedBNH ELECTRICAL CORPGeneral Wiring
02/03/2022CompleteBNH ELECTRICAL CORP1 meters
1 project · most recent 03/18/2024
Fence
FiledStatusContractorScope
03/18/2024Permit IssuedMOD CONSULTANTS LLCFence
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
02/04/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRene Navarretespecial
02/03/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
09/24/2024Fenestration areasRene Navarreteenergy_progress
09/24/2024Interior lighting powerRene Navarreteenergy_progress
09/24/2024Lighting in dwelling unitsRene Navarreteenergy_progress
09/24/2024Air barrier - visual inspectionRene Navarreteenergy_progress
09/24/2024Insulation placement and R valuesRene Navarreteenergy_progress
09/24/2024Fenestration and door U-factor and product ratingsRene Navarreteenergy_progress
09/24/2024Lighting controlsRene Navarreteenergy_progress
09/24/2024Fenestration air leakageRene Navarreteenergy_progress
08/19/2024Fire-Resistant Penetrations and JointsRene Navarretespecial
08/19/2024Concrete - Cast-In-PlaceRene Navarretespecial
08/19/2024Excavations - Sheeting, Shoring, and BracingRene Navarretespecial
08/19/2024Structural Stability – Alterations of existing buildingsRene Navarretespecial
08/19/2024FinalRene Navarreteprogress
08/19/2024Footing and FoundationRene Navarreteprogress
08/19/2024Fire-Resistance Rated ConstructionRene Navarreteprogress
08/19/2024Energy Code Compliance InspectionsRene Navarreteprogress
06/28/2021Fire-Resistant Penetrations and JointsRENE NAVARRETEspecial
04/05/2021Structural Stability – Alterations of existing buildingsRENE NAVARRETEspecial
04/04/2021FinalRENE NAVARRETEprogress
04/04/2021Fenestration air leakageRENE NAVARRETEenergy_progress
04/04/2021Air barrier - visual inspectionRENE NAVARRETEenergy_progress
04/04/2021Lighting in dwelling unitsRENE NAVARRETEenergy_progress
04/04/2021Fenestration and door U-factor and product ratingsRENE NAVARRETEenergy_progress
Latest 25 of 30.
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026S00496266-I1Request digital key ↗
08/25/2026S00496266-S1Request digital key ↗
08/24/2026S00496260-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026S00496266-I1Open ↗
08/13/2026S00496266-S1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00496266-I1Open ↗
08/13/2026S00496266-S1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026S00496266-S1Open ↗
09/01/2026S00496266-S1Open ↗
09/01/2026S00496266-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026S00496266-S1Open ↗
09/01/2026S00496266-S1Open ↗
09/01/2026S00496266-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026S01021459-I1Open ↗
08/13/2026S00496266-S1Open ↗
08/13/2026S00496260-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026S00496260-S1Open ↗
08/13/2026S00496260-I1Open ↗
08/13/2026S00496266-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00496266-S1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00496266-S1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026S00496266-S1Open ↗
▸Other Documents5
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00496266-I1Open ↗
08/13/2026S00496266-S1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026S00496266-S1Open ↗
08/13/2026S00496266-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S00496266-S1Open ↗