← Back
Two stories - detached, small or mid-size
53 BIRCHARD AVENUE
STATEN ISLAND · BIN 5021294
💬 Discuss this project
1965Year Built
2Stories
A1Building Class
R3-1Zoning
1,632 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 10 docs
Floor 21p · 1 filing · 10 docs
Floor 1
1 job · most recent 08/05/2026
Fence
FiledStatusContractorScope
08/05/2026——Fence
Building Lifecycle
All (13)Filed (1)Special Inspection (12)
08/05/2026
Filed — Alteration
Construction of a wood construction fence around proposed addition to the north (left) side of the building.
S01345745-I1
07/24/2026
Special inspection requirement — Interior lighting power
Steven Savino
01/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/23/2026
Special inspection requirement — Subgrade Inspections
01/23/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
01/23/2026
Special inspection requirement — Energy Code Compliance Inspections
01/23/2026
Special inspection requirement — Concrete - Cast-In-Place
01/23/2026
Special inspection requirement — Fenestration areas
01/23/2026
Special inspection requirement — Fenestration air leakage
01/23/2026
Special inspection requirement — Air barrier - visual inspection
01/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
01/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
01/13/2026
Special inspection requirement — Final
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC108/05/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
07/24/2026Interior lighting powerSteven Savinoenergy_progress
01/23/2026Fire-Resistant Penetrations and Joints—special
01/23/2026Subgrade Inspections—special
01/23/2026Subsurface Investigations (Borings/Test Pits)—special
01/23/2026Energy Code Compliance Inspections—progress
01/23/2026Concrete - Cast-In-Place—special
01/23/2026Fenestration areas—energy_progress
01/23/2026Fenestration air leakage—energy_progress
01/23/2026Air barrier - visual inspection—energy_progress
01/23/2026Fenestration and door U-factor and product ratings—energy_progress
01/23/2026Fire-Resistance Rated Construction—progress
01/13/2026Final—progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026S01345745-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/16/2026S01345745-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026S01345745-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026S01345745-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/16/2026S01345745-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/16/2026S01345745-I1Open ↗
▸DOB NOWSOIL REPORT1
08/16/2026S01345745-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026S01345745-I1Open ↗
▸DOB NOWPlot Diagram1
08/16/2026S01345745-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/16/2026S01345745-I1Open ↗