← Back
One story - permanent living quarter
125 WESTMINSTER COURT
STATEN ISLAND · BIN 5022793
💬 Discuss this project
1970Year Built
1Stories
A2Building Class
R1-1Zoning
1,368 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story - permanent living quarter · 32,805 sf lot · 0.04 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAWRENCE MANDARINO ARCHITECT210/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
APRILE BONAMO FILING REP103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CHARLES J. DEHART JR P&HPlumbing107/08/2026
Building Lifecycle
All (14)Filed (2)Permit Issued (2)Signed Off (2)Violation (3)Inspection (4)Special Inspection (1)
12/03/2025
Signed off — Alteration
The legalization of a three-fixture lavatory and summer kitchen located in the basement. This filing is in response to ECB violations 35669658Z, 35669654L
S01214417-I1
12/03/2025
Signed off — Alteration
The legalization of a three-fixture lavatory and summer kitchen located in the basement. This filing is in response to ECB violations 35669658Z, 35669654L
S01214417-S1
10/29/2025
Permit issued — Plumbing
S01214417-S1-PL
10/22/2025
Filed — Alteration
The legalization of a three-fixture lavatory and summer kitchen located in the basement. This filing is in response to ECB violations 35669658Z, 35669654L
S01214417-S1
06/17/2025
Permit issued — General Construction
S01214417-I1-GC
06/04/2025
Filed — Alteration
The legalization of a three-fixture lavatory and summer kitchen located in the basement. This filing is in response to ECB violations 35669658Z, 35669654L
S01214417-I1
04/22/2025
Special inspection requirement — Final
Lawrence Mandarino
12/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/10/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/06/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/29/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/24/2023
Violation issued (ECB, closed)
Construction
04/24/2023
Violation issued (ECB, closed)
Construction
04/24/2023
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCHARLES J. DEHART JR P&H10/29/2025
DOB NOWGeneral ConstructionSigned-offPR06/17/2025
1 project · most recent 10/14/2025
General Wiring
FiledStatusContractorScope
10/14/2025CompleteRIDGE ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/10/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/06/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/29/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
04/22/2025FinalLawrence Mandarinoprogress
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/18/2026S01214417-S1Request digital key ↗
08/18/2026S01214417-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/18/2026S01214417-S1Open ↗
08/18/2026S01214417-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026S01214417-I1Open ↗