← Back
Large suburban residence
412 WOODDALE AVENUE
STATEN ISLAND · BIN 5022882
💬 Discuss this project
1960Year Built
1.5Stories
A3Building Class
R1-1Zoning
3,883 sfGross Floor Area
1Units
Large suburban residence · 10,000 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC110/02/2025
TERRA PRETA ARCHITECTS311/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
DESIGN CONCEPTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NICOLOSI BROS INCGeneral Contractor307/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
V & M DRAIN CLEANING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272110/02/2025
Building Lifecycle
All (25)Filed (4)Permit Issued (4)Signed Off (4)Inspection (2)Objection (6)Special Inspection (5)
01/14/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01293678-I1
10/14/2025
Permit issued — Solar
S01293678-I1-SL
10/02/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01293678-I1
09/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
09/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
09/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
09/26/2025
Special inspection requirement — Final
Walid Abdulla
09/26/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
03/13/2023
Signed off — Alteration
TEMPORARY CONSTRUCTION FENCE
S00583746-S2
03/03/2023
Signed off — Alteration
TEMPORARY CONSTRUCTION FENCE
S00583746-I1
02/14/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/13/2023
Signed off — Alteration
TEMPORARY CONSTRUCTION FENCE
S00583746-S1
12/19/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/06/2022
Permit issued — Plumbing
S00583746-S2-PL
11/01/2022
Filed — Alteration
TEMPORARY CONSTRUCTION FENCE
S00583746-S2
10/07/2022
Permit issued — General Construction
S00583746-I1-GC
10/05/2022
Permit issued — Construction Fence
S00583746-S1-FN
09/30/2022
Objection resolved — Addressed
09/27/2022
Objection resolved — Addressed
09/22/2022
Objection raised — Fire_Protection
09/22/2022
Objection raised — Inspections
09/16/2022
Filed — Alteration
TEMPORARY CONSTRUCTION FENCE
S00583746-S1
06/28/2022
Objection resolved — Addressed
10/25/2021
Objection raised — Scope
09/01/2021
Filed — Alteration
TEMPORARY CONSTRUCTION FENCE
S00583746-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC10/14/2025
DOB NOWPlumbingSigned-offV & M DRAIN CLEANING INC12/06/2022
DOB NOWGeneral ConstructionSigned-offNICOLOSI BROS INC10/07/2022
DOB NOWConstruction FenceSigned-offNICOLOSI BROS INC10/05/2022
BISPLISSUEDV & M DRAIN CLEANING INC08/16/2007
BIS—ISSUEDTROOST BROS INC08/08/2006
BIS—ISSUEDTROOST BROS INC06/30/2006
2 projects · most recent 10/02/2025
General Wiring
FiledStatusContractorScope
10/02/2025CompleteSUNRUN SOLAR ELECTL CORP—
11/12/2022CompleteAQUATECH MECH,PLBG & ELECGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/26/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
09/26/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
09/26/2025Energy Code Compliance InspectionsWalid Abdullaprogress
09/26/2025FinalWalid Abdullaprogress
09/26/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026S00583746-S2Request digital key ↗
08/18/2026S01293678-I1Request digital key ↗
08/15/2026S00583746-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/20/2007510006734Open ↗
▸BISWORK PERMIT APPLICATION1
08/16/2007510006734Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
06/20/2007510006734Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00583746-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026S00583746-S2Open ↗
08/25/2026S00583746-I1Open ↗
08/25/2026S00583746-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026S01293678-I1Open ↗
08/25/2026S01293678-I1Open ↗
08/25/2026S01293678-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026S01293678-I1Open ↗
08/25/2026S01293678-I1Open ↗
▸BISTECHNICAL REPORT: STATEMENT OF RESPONSIBILITY1
06/20/2007510006734Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/20/2007510006734Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/20/2007510006734Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/11/2007510006734Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
06/20/2007510006734Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
08/21/2007510006734Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026S00583746-S2Open ↗
08/15/2026S00583746-I1Open ↗
08/13/2026S01293678-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/20/2007510006734Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00583746-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/11/2007510006734Open ↗
▸BISLETTERS-SUPPORTING DOCUMENT1
09/11/2007510006734Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/20/2007510006734Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01293678-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/11/2007510006734Open ↗
08/16/2007510006734Open ↗
▸Other Documents2
▸DOB NOWPlot Diagram1
08/13/2026S00583746-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00583746-I1Open ↗