← Back
Large suburban residence
27 FLAGG COURT
STATEN ISLAND · BIN 5022966
💬 Discuss this project
1986Year Built
2Stories
A3Building Class
R1-1Zoning
4,867 sfGross Floor Area
1Units
Large suburban residence · Owner of record: 27 FLAGG CT LLC · 13,500 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Floor 22p · 2 filings · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BROOKLYN103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VIKATOS ARCHITECT PC1106/26/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GRANDEUR CONSULTING GROUPGeneral Contractor507/08/2026
TOP DOG PLBG & HTG CORPPlumbing207/08/2026
VSP MECHANICAL INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VIKATOS ARCHITECT34981106/26/2023
Building Lifecycle
All (55)Filed (11)Permit Issued (7)Signed Off (3)Inspection (5)Special Inspection (29)
06/29/2023
Signed off — Alteration
NEW CONCRETE EXTERIOR STEPS FROM GRADE TO CELLAR, NO CHANGE IN USE OR OCCUPANCY
S00536502-I1
06/28/2023
Signed off — Alteration
PLUMBING WORK PROPOSED TO EXISTING TWO STORY AND CELLAR DWELLING. CAP EXISTING AND INSTALL NEW FIXTURES AS PER PLANS; OCCUPANCY CLASS: J-3 AND CONSTRUCTION CLASSIFICATION: IID, FRAME STRUCTURE. NO CHANGE IN BULK, USE, OCCUPANCY, METES & BOUNDS.
S00545044-I1
06/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PANAGIOTIS VIKATOS
06/28/2023
Special inspection requirement — Final
PANAGIOTIS VIKATOS
06/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
PANAGIOTIS VIKATOS
06/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PANAGIOTIS VIKATOS
06/28/2023
Special inspection requirement — Lighting in dwelling units
PANAGIOTIS VIKATOS
06/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
PANAGIOTIS VIKATOS
06/27/2023
Signed off — Alteration
NEW CONCRETE EXTERIOR STEPS FROM GRADE TO CELLAR, NO CHANGE IN USE OR OCCUPANCY
S00536502-S1
06/26/2023
Filed — Alteration
NEW CONCRETE EXTERIOR STEPS FROM GRADE TO CELLAR, NO CHANGE IN USE OR OCCUPANCY
S00536502-P4
06/26/2023
Filed — Alteration
NEW CONCRETE EXTERIOR STEPS FROM GRADE TO CELLAR, NO CHANGE IN USE OR OCCUPANCY
S00536502-P5
06/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PANAGIOTIS VIKATOS
06/26/2023
Special inspection requirement — Final
PANAGIOTIS VIKATOS
06/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PANAGIOTIS VIKATOS
06/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PANAGIOTIS VIKATOS
06/22/2023
Special inspection requirement — Final
PANAGIOTIS VIKATOS
06/22/2023
Special inspection requirement — Lighting in dwelling units
PANAGIOTIS VIKATOS
06/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
PANAGIOTIS VIKATOS
06/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
PANAGIOTIS VIKATOS
06/14/2023
Permit issued — Structural
S00536502-S1-ST
06/12/2023
Filed — Alteration
NEW CONCRETE EXTERIOR STEPS FROM GRADE TO CELLAR, NO CHANGE IN USE OR OCCUPANCY
S00536502-P3
06/07/2023
Filed — Alteration
NEW CONCRETE EXTERIOR STEPS FROM GRADE TO CELLAR, NO CHANGE IN USE OR OCCUPANCY
S00536502-S1
06/07/2023
Filed — Alteration
NEW CONCRETE EXTERIOR STEPS FROM GRADE TO CELLAR, NO CHANGE IN USE OR OCCUPANCY
S00536502-P2
04/19/2023
Special inspection requirement — HVAC-R and service water heating system controls
PANAGIOTIS VIKATOS
04/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PANAGIOTIS VIKATOS
04/19/2023
Special inspection requirement — Final
PANAGIOTIS VIKATOS
04/19/2023
Special inspection requirement — Lighting in dwelling units
PANAGIOTIS VIKATOS
04/19/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PANAGIOTIS VIKATOS
04/19/2023
Special inspection requirement — HVAC-R and service water heating equipment
PANAGIOTIS VIKATOS
03/07/2023
Filed — Alteration
PLUMBING WORK PROPOSED TO EXISTING TWO STORY AND CELLAR DWELLING. CAP EXISTING AND INSTALL NEW FIXTURES AS PER PLANS; OCCUPANCY CLASS: J-3 AND CONSTRUCTION CLASSIFICATION: IID, FRAME STRUCTURE. NO CHANGE IN BULK, USE, OCCUPANCY, METES & BOUNDS.
S00545044-P3
03/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PANAGIOTIS VIKATOS
03/01/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/10/2023
Permit issued — Plumbing
S00545044-I1-PL
01/31/2023
Filed — Alteration
PLUMBING WORK PROPOSED TO EXISTING TWO STORY AND CELLAR DWELLING. CAP EXISTING AND INSTALL NEW FIXTURES AS PER PLANS; OCCUPANCY CLASS: J-3 AND CONSTRUCTION CLASSIFICATION: IID, FRAME STRUCTURE. NO CHANGE IN BULK, USE, OCCUPANCY, METES & BOUNDS.
S00545044-P2
01/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PANAGIOTIS VIKATOS
01/25/2023
Filed — Alteration
PLUMBING WORK PROPOSED TO EXISTING TWO STORY AND CELLAR DWELLING. CAP EXISTING AND INSTALL NEW FIXTURES AS PER PLANS; OCCUPANCY CLASS: J-3 AND CONSTRUCTION CLASSIFICATION: IID, FRAME STRUCTURE. NO CHANGE IN BULK, USE, OCCUPANCY, METES & BOUNDS.
S00545044-P1
01/25/2023
Filed — Alteration
NEW CONCRETE EXTERIOR STEPS FROM GRADE TO CELLAR, NO CHANGE IN USE OR OCCUPANCY
S00536502-P1
01/25/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PANAGIOTIS VIKATOS
01/25/2023
Special inspection requirement — HVAC-R and service water heating equipment
PANAGIOTIS VIKATOS
01/25/2023
Special inspection requirement — HVAC-R and service water heating system controls
PANAGIOTIS VIKATOS
12/29/2022
Special inspection requirement — Lighting in dwelling units
PANAGIOTIS VIKATOS
12/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PANAGIOTIS VIKATOS
12/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PANAGIOTIS VIKATOS
12/29/2022
Special inspection requirement — Final
PANAGIOTIS VIKATOS
08/23/2022
Permit issued — Plumbing
S00545044-I1-PL
06/03/2022
Permit issued — General Construction
S00536502-I1-GC
04/12/2022
Permit issued — Plumbing
S00545044-I1-PL
03/25/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/25/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/25/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/28/2022
Permit issued — Plumbing
S00545044-I1-PL
06/28/2021
Permit issued — General Construction
S00536502-I1-GC
06/23/2021
Filed — Alteration
PLUMBING WORK PROPOSED TO EXISTING TWO STORY AND CELLAR DWELLING. CAP EXISTING AND INSTALL NEW FIXTURES AS PER PLANS; OCCUPANCY CLASS: J-3 AND CONSTRUCTION CLASSIFICATION: IID, FRAME STRUCTURE. NO CHANGE IN BULK, USE, OCCUPANCY, METES & BOUNDS.
S00545044-I1
06/12/2021
Filed — Alteration
NEW CONCRETE EXTERIOR STEPS FROM GRADE TO CELLAR, NO CHANGE IN USE OR OCCUPANCY
S00536502-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offGRANDEUR CONSULTING GROUP06/14/2023
DOB NOWPlumbingSigned-offEMR MECHANICAL CORP02/10/2023
DOB NOWPlumbingSigned-offEMR MECHANICAL CORP08/23/2022
DOB NOWGeneral ConstructionSigned-offGRANDEUR CONSULTING GROUP06/03/2022
DOB NOWPlumbingSigned-offTOP DOG PLBG & HTG CORP04/12/2022
DOB NOWPlumbingSigned-offTOP DOG PLBG & HTG CORP02/28/2022
DOB NOWGeneral ConstructionSigned-offGRANDEUR CONSULTING GROUP06/28/2021
2 projects · most recent 09/13/2023
General Wiring
FiledStatusContractorScope
09/13/2023CompleteKINGS ELECTRIC CO., INC.General Wiring
03/07/2022Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/01/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/25/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/25/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
06/28/2023Fire-Resistant Penetrations and JointsPANAGIOTIS VIKATOSspecial
06/28/2023FinalPANAGIOTIS VIKATOSprogress
06/28/2023HVAC-R and service water heating equipmentPANAGIOTIS VIKATOSenergy_progress
06/28/2023HVAC-R and service water piping design and insulationPANAGIOTIS VIKATOSenergy_progress
06/28/2023Lighting in dwelling unitsPANAGIOTIS VIKATOSenergy_progress
06/28/2023HVAC-R and service water heating system controlsPANAGIOTIS VIKATOSenergy_progress
06/26/2023Fire-Resistant Penetrations and JointsPANAGIOTIS VIKATOSspecial
06/26/2023FinalPANAGIOTIS VIKATOSprogress
06/22/2023HVAC-R and service water piping design and insulationPANAGIOTIS VIKATOSenergy_progress
06/22/2023Fire-Resistant Penetrations and JointsPANAGIOTIS VIKATOSspecial
06/22/2023FinalPANAGIOTIS VIKATOSprogress
06/22/2023Lighting in dwelling unitsPANAGIOTIS VIKATOSenergy_progress
06/22/2023HVAC-R and service water heating system controlsPANAGIOTIS VIKATOSenergy_progress
06/22/2023HVAC-R and service water heating equipmentPANAGIOTIS VIKATOSenergy_progress
04/19/2023HVAC-R and service water heating system controlsPANAGIOTIS VIKATOSenergy_progress
04/19/2023Fire-Resistant Penetrations and JointsPANAGIOTIS VIKATOSspecial
04/19/2023FinalPANAGIOTIS VIKATOSprogress
04/19/2023Lighting in dwelling unitsPANAGIOTIS VIKATOSenergy_progress
04/19/2023HVAC-R and service water piping design and insulationPANAGIOTIS VIKATOSenergy_progress
04/19/2023HVAC-R and service water heating equipmentPANAGIOTIS VIKATOSenergy_progress
03/03/2023Fire-Resistant Penetrations and JointsPANAGIOTIS VIKATOSspecial
01/30/2023Fire-Resistant Penetrations and JointsPANAGIOTIS VIKATOSspecial
01/25/2023HVAC-R and service water piping design and insulationPANAGIOTIS VIKATOSenergy_progress
01/25/2023HVAC-R and service water heating equipmentPANAGIOTIS VIKATOSenergy_progress
01/25/2023HVAC-R and service water heating system controlsPANAGIOTIS VIKATOSenergy_progress
Latest 25 of 29.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026S00536502-P5Request digital key ↗
08/23/2026S00536502-P4Request digital key ↗
08/23/2026S00536502-P3Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits7
▸DOB NOWLPC Approval/Permit7
08/13/2026S00536502-P5Open ↗
08/13/2026S00536502-P2Open ↗
08/13/2026S00536502-P1Open ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWRestrictive Declaration/Easement 13
08/13/2026S00536502-P5Open ↗
08/13/2026S00536502-P2Open ↗
08/13/2026S00536502-I1Open ↗
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature21
09/01/2026S00536502-P1Open ↗
09/01/2026S00536502-P1Open ↗
09/01/2026S00536502-P1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026S00545044-P1Open ↗
09/01/2026S00536502-P1Open ↗
08/28/2026S00536502-P5Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026S00536502-P5Open ↗
08/23/2026S00536502-P4Open ↗
08/23/2026S00536502-P3Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/23/2026S00536502-I1Open ↗
08/23/2026S00536502-P5Open ↗
08/23/2026S00536502-P4Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00536502-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWLandmark Approval1
08/13/2026S00545044-P3Open ↗