Multi-story retail building (2+)
172 PORT RICHMOND AVENUE
STATEN ISLAND · BIN 5025379
💬 Discuss this project
1931Year Built
2Stories
K2Building Class
C4-2Zoning
4,280 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Multi-story retail building (2+) · 3,100 sf lot · 1.38 FAR built · Flood zone X
Locations of Work
Architecture
Floor 21p · 1 filing · 7 docs
Floor 11p · 1 filing · 7 docs
2 jobs · most recent 07/19/2023
FiledStatusContractorScope
07/19/2023CompleteLENS ELECTRIC, INC—
10/24/2022Permit IssuedALL WAYS ELECTRIC CORP.W—
Building Lifecycle
All (21)Filed (3)Permit Issued (3)Signed Off (2)Violation (4)Inspection (2)Objection (2)Special Inspection (5)
10/27/2025
Signed off — Alteration
S01274894-I1
10/24/2025
Permit issued — Mechanical Systems
S01274894-I1-MS
10/17/2025
Filed — Alteration
S01274894-I1
07/02/2025
Violation issued (FDNY_NOV, closed)
01/11/2024
Signed off — Alteration
Fire damage repair to existing Commercial building. no change of use, egress or occupancy.
S08055672-I1
12/26/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/06/2023
Filed — Alteration
Fire damage repair to existing Commercial building. no change of use, egress or occupancy.
S08055672-P1
11/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
11/27/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
11/27/2023
Special inspection requirement — Fenestration areas
anthony santoro
11/27/2023
Special inspection requirement — Fenestration air leakage
anthony santoro
11/27/2023
Special inspection requirement — Air barrier - visual inspection
anthony santoro
10/19/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/09/2023
Permit issued — General Construction
S08055672-I1-GC
06/19/2023
Permit issued — General Construction
S08055672-I1-GC
01/10/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/30/2022
Objection raised — Admin
12/30/2022
Objection resolved — Addressed
12/20/2022
Filed — Alteration
Fire damage repair to existing Commercial building. no change of use, egress or occupancy.
S08055672-I1
10/22/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/16/1993
Violation issued (ECB, closed)
Construction
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VAN ROON'S S.I. INC.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A TECH ENGINEERING NYC, PLLC.110/17/2025
VALENTINO POMPEO ARCHITECT, P.C.212/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL WAYS ELECTRIC CORP.WElectrical103/22/2026
DO N CONSTRUCTION CORPGeneral Contractor107/08/2026
JJK CONSTRUCTION NY INCGeneral Contractor107/08/2026
RICHMOND PLUMBING & HEAT*General Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738310/17/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offRICHMOND PLUMBING & HEAT*10/24/2025
DOB NOWGeneral ConstructionSigned-offDO N CONSTRUCTION08/09/2023
DOB NOWGeneral ConstructionSigned-offJJK CONSTRUCTION NY INC06/19/2023
BISOTISSUEDUNITECH DESIGN INC10/16/2003
BISEQISSUEDJENESY AMERICA INC06/19/2003
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/26/2023Pass-Final General Construction Non-Directive 14PassView ↗
10/19/2023Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/27/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
11/27/2023Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
11/27/2023Fenestration areasanthony santoroenergy_progress
11/27/2023Fenestration air leakageanthony santoroenergy_progress
11/27/2023Air barrier - visual inspectionanthony santoroenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
01/05/2024500623961Open ↗
12/29/2023500623961Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026S08055672-I1Open ↗
08/13/2026S08055672-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026S08055672-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026S08055672-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026S08055672-I1Open ↗
08/13/2026S08055672-P1Open ↗
▸Inspections & Test Reports1
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
01/05/2024500623961Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/08/2024500623961Open ↗