← Back
Two stories - detached, small or mid-size
144 LAKE AVENUE
STATEN ISLAND · BIN 5026771
💬 Discuss this project
2020Year Built
2Stories
A1Building Class
R3AZoning
1,728 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,898 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
S I NORTHSHORE ENTERPRISES1107/08/2026
NATHAN HOLDINGS703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC211/08/2024
RYAN DESIGN ARCHITECTURE312/04/2020
WILLIAM MONTAGUE ENGINEER112/09/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDIA CONSULTING303/21/2026
SUNRUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JB BUZCO PLUMBING LLCPlumbing407/08/2026
PAUL TOTH EXCAVATION INCGeneral Contractor203/21/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
ZAIM CONTRACTOR CORPGeneral Contractor107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272211/08/2024
Building Lifecycle
All (36)Filed (6)Permit Issued (5)Signed Off (4)Objection (8)Special Inspection (13)
08/26/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01120855-I1
11/12/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
11/12/2024
Special inspection requirement — Final
Walid Abdulla
11/12/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
11/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
11/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
11/08/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01120855-P1
11/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
11/08/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
11/08/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
11/08/2024
Special inspection requirement — Final
Walid Abdulla
11/08/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
10/17/2024
Permit issued — Solar
S01120855-I1-SL
10/04/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01120855-I1
06/30/2021
Signed off — Alteration
PLUMBING
S00364895-I1
06/21/2021
Signed off — Alteration
CURB CUT 9'
S00251265-I1
05/04/2021
Permit issued — Curb Cut
S00251265-I1-CC
01/13/2021
Permit issued — Plumbing
S62629569-I1-PL
12/04/2020
Filed — Alteration
PLUMBING
S00364895-P1
11/23/2020
Special inspection requirement — HVAC and service water heating equipment
Daniel Ryan
11/23/2020
Special inspection requirement — HVAC and service water heating system controls
Daniel Ryan
11/23/2020
Special inspection requirement — HVAC insulation and sealing
Daniel Ryan
10/28/2020
Permit issued — Plumbing
S00364895-I1-PL
10/06/2020
Signed off — Alteration
PROPOSED 8' PLYWOOD/OSB CONSTRUCTION FENCE
S00277143-I1
08/28/2020
Objection raised — Zoning
08/28/2020
Objection resolved — Addressed
08/28/2020
Objection raised — Admin
08/28/2020
Objection resolved — Addressed
08/28/2020
Objection raised — Scope
08/28/2020
Objection resolved — Addressed
08/28/2020
Objection raised — Structural
08/28/2020
Objection resolved — Addressed
08/25/2020
Filed — Alteration
CURB CUT 9'
S00251265-I1
08/11/2020
Filed — Alteration
PLUMBING
S00364895-I1
01/17/2020
Permit issued — Construction Fence
S00277143-I1-FN
12/09/2019
Filed — Alteration
PROPOSED 8' PLYWOOD/OSB CONSTRUCTION FENCE
S00277143-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC10/17/2024
DOB NOWCurb CutSigned-offSUFFOLK CONSTRUCT CO. INC05/04/2021
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC01/13/2021
DOB NOWPlumbingSigned-offJB BUZCO PLUMBING LLC10/28/2020
DOB NOWConstruction FenceSigned-offPAUL TOTH EXCAVATION INC01/17/2020
BIS—ISSUEDZAIM CONTRACTOR CORP10/26/2020
BIS—ISSUEDPAUL TOTH EXCAVATION INC01/22/2020
2 projects · most recent 11/01/2024
General Wiring
FiledStatusContractorScope
11/01/2024CompleteSUNRUN SOLAR ELECTL CORPGeneral Wiring
01/30/2021CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
11/12/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
11/12/2024FinalWalid Abdullaprogress
11/12/2024Energy Code Compliance InspectionsWalid Abdullaprogress
11/12/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
11/12/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
11/08/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
11/08/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
11/08/2024Energy Code Compliance InspectionsWalid Abdullaprogress
11/08/2024FinalWalid Abdullaprogress
11/08/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
11/23/2020HVAC and service water heating equipment Daniel Ryanenergy_progress
11/23/2020HVAC and service water heating system controls Daniel Ryanenergy_progress
11/23/2020HVAC insulation and sealing Daniel Ryanenergy_progress
▾Documents — 108 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch2
08/20/2026S01120855-I1Request digital key ↗
08/20/2026S01120855-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/25/2026S00364895-I1Request digital key ↗
08/15/2026S00364895-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/14/2026S00251265-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026S00277143-I1Request digital key ↗
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION10
03/23/2021520392254Open ↗
03/16/2021540178644Open ↗
03/12/2021540178644Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION2
10/26/2020540178644Open ↗
01/23/2020520394635Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
04/22/2021520392254Open ↗
01/27/2020520392254Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/04/2021540178644Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
10/15/2020540178644Open ↗
01/27/2020520392254Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/15/2020540178644Open ↗
▸BISVERIFY TAX LOT1
07/26/2021540178644Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
01/23/2020520394635Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
07/26/2021540178644Open ↗
▸BISZONING DIAGRAM1
10/15/2020540178644Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026S00364895-P1Open ↗
09/01/2026S00364895-P1Open ↗
09/01/2026S00364895-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026S00251265-I1Open ↗
08/25/2026S00364895-I1Open ↗
08/20/2026S01120855-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/25/2026S01120855-P1Open ↗
08/25/2026S01120855-P1Open ↗
08/23/2026S01120855-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/22/2020540178644Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/13/2020540178644Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/26/2020540178644Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/26/2020540178644Open ↗
▸Trade Schedules & Equipment7
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
06/30/2021540178644Open ↗
10/15/2020540178644Open ↗
▸BISGAS CUT-OFF1
01/23/2020520394635Open ↗
▸BISELECTRIC CUT-OFF1
01/23/2020520394635Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
10/15/2020540178644Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
01/23/2020520394635Open ↗
▸BISPL SPRINKLER SIGN OFF1
07/26/2021540178644Open ↗
▸Safety & Tenant Protection6
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
01/23/2020520394635Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
11/14/2019520394635Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
10/19/2020540178644Open ↗
▸BISSTREET TREE CHECKLIST1
10/22/2020540178644Open ↗
▸BISSTREET TREE SIGNOFF1
07/26/2021540178644Open ↗
▸BISSTREET TREES SITE PLAN1
06/22/2021540178644Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/14/2019520394635Open ↗
▸BISRODENT CONTROL1
01/23/2020520394635Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
06/21/2021540178644Open ↗
10/22/2020540178644Open ↗
10/21/2020540178644Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/26/2021540178644Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/21/2020540178644Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY8
06/21/2021540178644Open ↗
05/04/2021540178644Open ↗
10/26/2020540178644Open ↗
Showing 3 of 8 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
06/22/2021540178644Open ↗
10/19/2020540178644Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
10/22/2020540178644Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
01/27/2020520392254Open ↗
▸BISSOIL REPORT1
10/15/2020540178644Open ↗
▸Approvals, Objections & Sign-offs14
▸BISSCHEDULE A - OCCUPANCY / USE4
03/12/2021540178644Open ↗
10/13/2020540178644Open ↗
10/02/2020540178644Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/27/2020520392254Open ↗
01/23/2020520394635Open ↗
01/23/2020520394635Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
12/10/2019520392254Open ↗
11/14/2019520394635Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
01/23/2020520394635Open ↗
▸BISLANDMARKS APPROVAL1
01/23/2020520394635Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
01/27/2020520392254Open ↗
▸BISCURB CUT (CC) SIGNOFF1
07/26/2021540178644Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01120855-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
01/23/2020520394635Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
12/10/2019520392254Open ↗
11/14/2019520394635Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/20/2020540178644Open ↗
▸Other Documents6
▸BISSUSTAINABLE ROOF ZONE FORM1
10/15/2020540178644Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
01/15/2020520392254Open ↗
▸BISBPP: FILING REQUIRED1
10/22/2020540178644Open ↗
▸BISDOB NOW REVIEW COMPLETE1
07/26/2021540178644Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
04/22/2021520392254Open ↗
▸BISPLOT DIAGRAM1
10/22/2020540178644Open ↗