| Owner | Filings | Most Recent |
|---|---|---|
| 18 LINDEN AVE VENTURES | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| RYAN DESIGN ARCHITECTURE | 3 | 07/27/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| GRINBERG MANAGEMENT | 3 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| RICHMOND COUNTY DEVEL LLC | General Contractor | 4 | 04/09/2026 |
| HIGH BEAM ELECTRIC CORP. | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| RYAN DESIGN ARCHITECTURE | 7159 | 1 | 07/27/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Curb Cut | Permit Issued | RICHMOND COUNTY DEVEL LLC | 09/17/2025 |
| DOB NOW | General Construction | Permit Issued | RICHMOND COUNTY DEVEL LLC | 06/05/2023 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/27/2022 | — | — | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/25/2022 | Permit Issued | HIGH BEAM ELECTRIC CORP. | General Wiring |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/27/2022 | Concrete - Cast-In-Place | Daniel Ryan | special |
| 07/27/2022 | Structural Stability – Alterations of existing buildings | Daniel Ryan | special |
| 07/27/2022 | Subgrade Inspections | Daniel Ryan | special |
| 07/27/2022 | Fire-Resistant Penetrations and Joints | Daniel Ryan | special |
| 07/27/2022 | Subsurface Investigations (Borings/Test Pits) | Daniel Ryan | special |
| 07/27/2022 | Fire-Resistant Penetrations and Joints | — | special |
| 07/27/2022 | Maintenance information | — | energy_progress |
| 07/27/2022 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 07/27/2022 | HVAC-R and service water heating equipment | — | energy_progress |
| 07/27/2022 | Metering | — | energy_progress |
| 07/27/2022 | HVAC-R and service water heating system controls | — | energy_progress |