Two family converted from one family
38 HARBOR ROAD
STATEN ISLAND · BIN 5027972
💬 Discuss this project
1920Year Built
2.5Stories
B3Building Class
R3AZoning
1,712 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family converted from one family · 6,919 sf lot · 0.25 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 12/07/2024
General Wiring
FiledStatusContractorScope
12/07/2024CompleteCONDE ELECTRIC INCGeneral Wiring
Building Lifecycle
All (19)Filed (2)Permit Issued (2)Signed Off (2)Violation (4)Inspection (4)Special Inspection (5)
03/20/2025
Signed off — Alteration
TO CAP AND REMOVE GAS PIPING/DRYER AND WASHER MACHINE WITH LAUNDRY STAND PIPE, INSTALL HOSE BIB AND BOILER AND HOT HOT WATER HEATER ALL AS PER PLANS FILED HEREWITH.
S01142975-I1
03/20/2025
Signed off — Alteration
TO CAP AND REMOVE GAS PIPING/DRYER AND WASHER MACHINE WITH LAUNDRY STAND PIPE, INSTALL HOSE BIB AND BOILER AND HOT HOT WATER HEATER ALL AS PER PLANS FILED HEREWITH.
S01142975-S1
02/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/27/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/06/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/24/2024
Permit issued — General Construction
S01142975-I1-GC
12/09/2024
Permit issued — Plumbing
S01142975-S1-PL
11/25/2024
Filed — Alteration
TO CAP AND REMOVE GAS PIPING/DRYER AND WASHER MACHINE WITH LAUNDRY STAND PIPE, INSTALL HOSE BIB AND BOILER AND HOT HOT WATER HEATER ALL AS PER PLANS FILED HEREWITH.
S01142975-I1
11/25/2024
Filed — Alteration
TO CAP AND REMOVE GAS PIPING/DRYER AND WASHER MACHINE WITH LAUNDRY STAND PIPE, INSTALL HOSE BIB AND BOILER AND HOT HOT WATER HEATER ALL AS PER PLANS FILED HEREWITH.
S01142975-S1
11/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
11/22/2024
Special inspection requirement — Energy Code Compliance Inspections
FRANKLYN ESTRELLA
11/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
FRANKLYN ESTRELLA
11/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
FRANKLYN ESTRELLA
11/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANKLYN ESTRELLA
11/21/2022
Violation issued (HPD, closed)
I
01/09/2018
Violation issued (HPD, closed)
I
10/04/2010
Violation issued (HPD, closed)
B
10/04/2010
Violation issued (HPD, closed)
C
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PETER NYIAM211/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FRANKLYN ESTRELLA ARCHITECT PLLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONDE ELECTRIC INCElectrical103/22/2026
G & J.BUILDERS INCGeneral Contractor107/08/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519111/25/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offG & J.BUILDERS INC12/24/2024
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP12/09/2024
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/06/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/25/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
11/22/2024Energy Code Compliance InspectionsFRANKLYN ESTRELLAprogress
11/22/2024HVAC-R and service water heating system controlsFRANKLYN ESTRELLAenergy_progress
11/22/2024HVAC-R and service water heating equipmentFRANKLYN ESTRELLAenergy_progress
11/22/2024HVAC-R and service water piping design and insulationFRANKLYN ESTRELLAenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026S01142975-S1Request digital key ↗
08/20/2026S01142975-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026S01142975-S1Open ↗
08/20/2026S01142975-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026S01142975-S1Open ↗
08/26/2026S01142975-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026S01142975-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026S01142975-S1Open ↗
08/20/2026S01142975-I1Open ↗