← Back
Cape Cod
113 HOME PLACE
STATEN ISLAND · BIN 5029513
💬 Discuss this project
1955Year Built
1.5Stories
A0Building Class
R3XZoning
1,040 sfGross Floor Area
1Units
Cape Cod · 5,000 sf lot · 0.21 FAR built · Flood zone X
Locations of Work
ArchitectureCivil
Floor 24p · 1 filing · 12 docs
Floor 14p · 1 filing · 12 docs
1 job · most recent 04/30/2025
Water/Sanitary
FiledStatusContractorScope
04/30/2025Signed-offDUO PLUMBING & HTG CORP.Water/Sanitary
1 job · most recent 08/07/2025
General Wiring
FiledStatusContractorScope
08/07/2025CompleteLMS ELECTRICAL CORPGeneral Wiring
1 job · most recent 04/30/2025
FiledStatusContractorScope
04/30/2025Permit IssuedRIGHTWAY RENOVATIONS CORP1 scope_items
1 job · most recent 06/09/2025
Fence
FiledStatusContractorScope
06/09/2025Signed-offRIGHTWAY RENOVATIONS CORPFence
1 job · most recent 04/30/2025
Earthwork
FiledStatusContractorScope
04/30/2025Permit IssuedRIGHTWAY RENOVATIONS CORPEarthwork
Building Lifecycle
All (47)Filed (3)Permit Issued (5)Signed Off (2)Inspection (3)Objection (14)Special Inspection (20)
06/12/2026
Signed off — Alteration
APPLICATION FILED HEREWITH FOR ALL PLUMBING WORK TO BE DONE IN CONJUNCTION WITH ALT TYPE 2 OT APPLICATION.
S01218707-I1
06/12/2026
Signed off — Alteration
APPLICATION FILED HEREWITH FOR CONSTRUCTION FENCE TO BE ERECTED IN CONJUNCTION WITH ALT TYPE 2 OT APPLICATION.
S01218481-I1
10/24/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/31/2025
Permit issued — Plumbing
S01218707-I1-PL
07/17/2025
Permit issued — General Construction
S01218508-I1-EA
07/17/2025
Permit issued — General Construction
S01218508-I1-FO
07/17/2025
Permit issued — Earth Work
S01218508-I1-GC
06/17/2025
Permit issued — Construction Fence
S01218481-I1-FN
06/09/2025
Filed — Alteration
APPLICATION FILED HEREWITH FOR CONSTRUCTION FENCE TO BE ERECTED IN CONJUNCTION WITH ALT TYPE 2 OT APPLICATION.
S01218481-I1
06/03/2025
Objection resolved — Addressed
05/29/2025
Objection resolved — Addressed
05/29/2025
Objection resolved — Addressed
05/29/2025
Objection resolved — Addressed
05/22/2025
Objection raised — Other
05/19/2025
Objection resolved — Addressed
05/19/2025
Objection resolved — Addressed
05/19/2025
Objection resolved — Addressed
05/07/2025
Objection raised — Structural
05/07/2025
Objection raised — Zoning
05/07/2025
Objection raised — Zoning
05/07/2025
Objection raised — Scope
05/07/2025
Objection raised — Scope
05/07/2025
Objection raised — Admin
04/30/2025
Filed — Alteration
APPLICATION FILED HEREWITH FOR ALL PLUMBING WORK TO BE DONE IN CONJUNCTION WITH ALT TYPE 2 OT APPLICATION.
S01218707-I1
04/30/2025
Filed — Alteration
ALTERATION TYPE 2 PLANS AND DOCUMENTS FILED HEREWITH FOR THE PROPOSED ALTERATION OF THE EXISTING FIRST FLOOR AND ENLARGEMENT OF THE EXISTING 2ND FLOOR OF THIS EXISTING ONE FAMILY DWELLING.
S01218508-I1
04/30/2025
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
04/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
04/30/2025
Special inspection requirement — Subgrade Inspections
anthony santoro
04/30/2025
Special inspection requirement — Wood – Prefabricated I-Joists
anthony santoro
04/30/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
MICHAEL DERUVO
04/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
anthony santoro
04/30/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
04/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
04/30/2025
Special inspection requirement — Final
anthony santoro
04/30/2025
Special inspection requirement — Footing and Foundation
anthony santoro
04/30/2025
Special inspection requirement — Interior lighting power
anthony santoro
04/30/2025
Special inspection requirement — Fenestration areas
anthony santoro
04/30/2025
Special inspection requirement — Maintenance information
anthony santoro
04/30/2025
Special inspection requirement — Insulation placement and R values
anthony santoro
04/30/2025
Special inspection requirement — Metering
anthony santoro
04/30/2025
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
04/30/2025
Special inspection requirement — Permanent certificate
anthony santoro
04/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
04/30/2025
Special inspection requirement — Fenestration air leakage
anthony santoro
04/30/2025
Special inspection requirement — Air barrier - visual inspection
anthony santoro
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL DERUVO & ASSOC. ARCHITECTS306/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RIGHTWAY RENOVATIONS CORPGeneral Contractor404/09/2026
DUO PLUMBING & HTG CORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738104/30/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.07/31/2025
DOB NOWGeneral ConstructionPermit IssuedRIGHTWAY RENOVATIONS CORP07/17/2025
DOB NOWGeneral ConstructionPermit IssuedRIGHTWAY RENOVATIONS CORP07/17/2025
DOB NOWEarth WorkPermit IssuedRIGHTWAY RENOVATIONS CORP07/17/2025
DOB NOWConstruction FenceSigned-offRIGHTWAY RENOVATIONS CORP06/17/2025
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
04/30/2025Concrete - Cast-In-Placeanthony santorospecial
04/30/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
04/30/2025Subgrade Inspectionsanthony santorospecial
04/30/2025Wood – Prefabricated I-Joistsanthony santorospecial
04/30/2025Subsurface Investigations (Borings/Test Pits)MICHAEL DERUVOspecial
04/30/2025Structural Stability – Alterations of existing buildingsanthony santorospecial
04/30/2025Energy Code Compliance Inspectionsanthony santoroprogress
04/30/2025Fire-Resistance Rated Constructionanthony santoroprogress
04/30/2025Finalanthony santoroprogress
04/30/2025Footing and Foundationanthony santoroprogress
04/30/2025Interior lighting poweranthony santoroenergy_progress
04/30/2025Fenestration areasanthony santoroenergy_progress
04/30/2025Maintenance informationanthony santoroenergy_progress
04/30/2025Insulation placement and R valuesanthony santoroenergy_progress
04/30/2025Meteringanthony santoroenergy_progress
04/30/2025Electric vehicle service equipment requirementsanthony santoroenergy_progress
04/30/2025Permanent certificateanthony santoroenergy_progress
04/30/2025Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
04/30/2025Fenestration air leakageanthony santoroenergy_progress
04/30/2025Air barrier - visual inspectionanthony santoroenergy_progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026S01218481-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S01218508-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S01218508-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026S01218508-I1Open ↗
08/25/2026S01218508-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026S01218508-I1Open ↗
08/25/2026S01218508-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026S01218481-I1Open ↗
08/13/2026S01218707-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01218707-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01218508-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S01218508-I1Open ↗
▸Other Documents4
▸DOB NOWPlot Diagram1
08/13/2026S01218508-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S01218508-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S01218508-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S01218508-I1Open ↗