ECB01/13/2026FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIOLATION VIO22-02977, DATED 8/22/2022. RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS. AS OF 1/13/202$25K due
ECB03/12/2024FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIOLATION VIO22-02977, DATED 8/22/2022. RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS. AS OF 10/11/23$12K due
ECB01/06/2023FAILURE TO COMPLY WITH COMMISSIONER'S ORDER IN DOB VIOLATION VIO22-02977,DATED 8/22/22. RESPONDENT WAS REQUIRED TO SUBMIT ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS.AS OF 11/1/22 AN ENGINEER$2K due
ECB12/13/2022WORK WITHOUT A PERMIT, AT THE TIME OF INSPECTION OBSERVED THE WALL STRIPPED TO THE STUDS AND BEAMS, NEW ELECTRICAL WIRINGS, CONSTRUCTION WORK WITH NO PERMIT ON FILE OR POSTED., OBTAIN ALL PERMITS$1K due
DOB10/24/2022FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG.
DOB08/22/2022AT TIME OF INSPECTION OBSERVED WOODEN JOIST CHARRED AT 3RD FLOOR. AT 1ST FLOOR LEFT SIDE PARTY WALL BULGING AT THE BOTTOM PART AND WALL UNEVEN. CRACKS ON 2ND AND 3RD FLOOR WALLS.
DOB08/22/2022STRUCTURE RENDERED NON COMPLIANCE, AT TIME OF INSPECTION DAMAGE OBSERVED AT 3RD FLOOR ROOF OPEN FOR ELEMENTS, CHARRED WOODEN JOIST,WALL AND CEILING DAMAGED EXCESSIVE WATER DAMAGE, AT 1ST AND 2ND FLOOR EXCESSIVE WATER DAMAGE WALL AND CEILING DAMAGED. DUE FIRE AND FIREFIGHTING OPERATION. VACATE ENTIRE PREMISES.