← Back
STATEN ISLAND
2142 FOREST AVENUE
STATEN ISLAND · BIN 5033595
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
29 Open Violations 28 unresolved · 1 paperwork only ▸FDNY Report ↗
Flood zone X
Locations of Work
Architecture
Floor 11p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAVIAN PIZZA CORP503/22/2026
755 TARGEE LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEE LLC106/03/2025
PERMANEN ENGINEERING INTERNATIONAL,108/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INSHA BUILDING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SCARAN OIL SERVICE INCGeneral Contractor203/21/2026
FOLINO, PETERElectrical103/21/2026
GORDON, CHARLENEElectrical103/21/2026
LOCAL UNION 14/14B I.U.OElectrical103/21/2026
MAGLIOLA, FElectrical103/21/2026
MKSSKR CONSULTING SERVICEGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RELIANCE ENGINEERING, P.C322108/12/2021
Building Lifecycle
All (47)Filed (2)Permit Issued (2)Signed Off (1)Violation (35)Special Inspection (7)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/04/2025
Permit issued — General Construction
S01232164-I1-GC
06/03/2025
Filed — Alteration
MINOR EXTERIOR WORK TO CREATE A SIDE OPENING FOR A PROPOSED SIDE SERVICE DOOR TO THE EXISTING COMMERCIAL SPACE. INSTALL NEW FIRE-RATED SIDE DOOR ONLY. WORK AS PER PLANS.
S01232164-I1
05/27/2025
Special inspection requirement — Final
MOHAMMAD BILLAH
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/20/2023
Violation issued (FDNY_NOV, closed)
11/12/2021
Signed off — Alteration
INSTALLATION OF NEW AC SYSTEM AT REAR OF PROPERTY AND DUCT SYSTEM IN COMMERCIAL SPACE.FILING TO OBTAIN Certificate of Compliance (Equipment Use Permit)NO CHANGE IN BULK, USE, OCCUPANCY AND/OR EGRESS.
S00553942-I1
09/01/2021
Permit issued — Mechanical Systems
S00553942-I1-MS
08/12/2021
Filed — Alteration
INSTALLATION OF NEW AC SYSTEM AT REAR OF PROPERTY AND DUCT SYSTEM IN COMMERCIAL SPACE.FILING TO OBTAIN Certificate of Compliance (Equipment Use Permit)NO CHANGE IN BULK, USE, OCCUPANCY AND/OR EGRESS.
S00553942-I1
07/12/2021
Special inspection requirement — Duct leakage testing, insulation and design
Ralph Giorgio
07/12/2021
Special inspection requirement — Maintenance information
Ralph Giorgio
07/12/2021
Special inspection requirement — Permanent certificate
Ralph Giorgio
07/12/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Giorgio
07/08/2021
Special inspection requirement — Final
Ralph Giorgio
07/08/2021
Special inspection requirement — Mechanical Systems
Ralph Giorgio
08/14/2020
Violation issued (FDNY_NOV, closed)
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/07/2016
Violation issued (ECB, open)
Boilers
10/23/2015
Violation issued (FDNY_NOV, closed)
10/01/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/01/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/01/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/19/2007
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/06/2006
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/31/2005
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/13/2004
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/1999
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/04/1998
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/16/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/10/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/08/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/09/1994
Violation issued (ECB, closed)
Construction
06/04/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/29/1989
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMKSSKR CONSULTING SERVICE06/04/2025
DOB NOWMechanical SystemsSigned-offSCARAN OIL SERVICE INC09/01/2021
BISPLISSUEDEAGLE PLUMBING & HEATING OF SI10/05/2004
BISFPISSUEDLUND FIRE PRODUCTS CO., INC09/29/2004
BISFPISSUEDACTIVE FIRE EXTINGUISHER INC.05/25/1995
BISOTISSUEDHAMLIN CONSTRCUTION CORP.05/03/1995
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
05/27/2025FinalMOHAMMAD BILLAHprogress
07/12/2021Duct leakage testing, insulation and designRalph Giorgioenergy_progress
07/12/2021Maintenance informationRalph Giorgioenergy_progress
07/12/2021Permanent certificateRalph Giorgioenergy_progress
07/12/2021Fire-Resistant Penetrations and JointsRalph Giorgiospecial
07/08/2021FinalRalph Giorgioprogress
07/08/2021Mechanical SystemsRalph Giorgiospecial
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026S00553942-I1Request digital key ↗
08/19/2026S01232164-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature5
08/27/2026S00553942-I1Open ↗
08/27/2026S00553942-I1Open ↗
08/27/2026S00553942-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026S01232164-I1Open ↗
08/13/2026S00553942-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026S00553942-I1Open ↗
08/27/2026S00553942-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S00553942-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00553942-I1Open ↗