← Back
One story - permanent living quarter
416 HAROLD STREET
STATEN ISLAND · BIN 5034426
💬 Discuss this project
1970Year Built
1Stories
A2Building Class
R3-1Zoning
1,242 sfGross Floor Area
1Units
One story - permanent living quarter · 3,680 sf lot · 0.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 17 docs
Floor 1Under Construction2p · 1 filing · 17 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PINTO ENGINEERING CONSULTANT, DPC209/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PINTO STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEXT LEVEL IMPROVEMENTSGeneral Contractor107/04/2026
ABLE PLBG CO RICHMOND INCPlumbing108/26/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PINTO ENGINEERING CONSULT9110209/30/2025
Building Lifecycle
All (32)Filed (2)Permit Issued (2)Inspection (1)Objection (6)Special Inspection (21)
08/13/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/14/2026
Permit issued — Plumbing
S01210054-S1-PL
07/02/2026
Permit issued — Foundation
S01210054-I1-GC
01/12/2026
Objection resolved — Addressed
09/30/2025
Filed — Alteration
Horizontal enlargement of an exist. one family house, including new side concrete steps and new wood deck, as per plans.
S01210054-S1
09/12/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SOORJBALLY HARILALL
09/11/2025
Objection resolved — Addressed
09/09/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Rene Navarrete
09/09/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rene Navarrete
09/08/2025
Objection resolved — Addressed
09/08/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Rene Navarrete
09/05/2025
Objection raised — Cost
09/05/2025
Objection raised — Zoning
09/05/2025
Objection raised — Scope
08/20/2025
Filed — Alteration
Horizontal enlargement of an exist. one family house, including new side concrete steps and new wood deck, as per plans.
S01210054-I1
04/14/2025
Special inspection requirement — Masonry
Rene Navarrete
04/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Rene Navarrete
04/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
Rene Navarrete
04/14/2025
Special inspection requirement — Final
Rene Navarrete
04/14/2025
Special inspection requirement — Footing and Foundation
Rene Navarrete
04/14/2025
Special inspection requirement — Energy Code Compliance Inspections
Rene Navarrete
04/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
Rene Navarrete
04/14/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Rene Navarrete
04/14/2025
Special inspection requirement — Fenestration air leakage
Rene Navarrete
04/14/2025
Special inspection requirement — Air barrier - visual inspection
Rene Navarrete
04/14/2025
Special inspection requirement — Fenestration areas
Rene Navarrete
04/14/2025
Special inspection requirement — Interior lighting power
Rene Navarrete
04/14/2025
Special inspection requirement — Lighting controls
Rene Navarrete
04/14/2025
Special inspection requirement — Lighting in dwelling units
Rene Navarrete
04/14/2025
Special inspection requirement — Concrete - Cast-In-Place
Rene Navarrete
04/14/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Rene Navarrete
04/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rene Navarrete
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedABLE PLBG CO RICHMOND INC07/14/2026
DOB NOWFoundationPermit IssuedNEXT LEVEL IMPROVEMENTS07/02/2026
1 project · most recent 09/30/2025
Storm
FiledStatusContractorScope
09/30/2025Permit IssuedABLE PLBG CO RICHMOND INCStorm
2 projects · most recent 12/19/2025
General Wiring
FiledStatusContractorScope
12/19/2025Permit IssuedSK ELECTRICAL CONTRACTORSGeneral Wiring
12/19/2025Permit IssuedSK ELECTRICAL CONTRACTORS3 meters, 1 new_meters
1 project · most recent 09/30/2025
FiledStatusContractorScope
09/30/2025Permit IssuedABLE PLBG CO RICHMOND INC2 scope_items
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/13/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
09/12/2025Subsurface Investigations (Borings/Test Pits)SOORJBALLY HARILALLspecial
09/09/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRene Navarretespecial
09/09/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRene Navarretespecial
09/08/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRene Navarretespecial
04/14/2025MasonryRene Navarretespecial
04/14/2025Structural Stability – Alterations of existing buildingsRene Navarretespecial
04/14/2025Tenant Protection Plan ComplianceRene Navarretespecial
04/14/2025FinalRene Navarreteprogress
04/14/2025Footing and FoundationRene Navarreteprogress
04/14/2025Energy Code Compliance InspectionsRene Navarreteprogress
04/14/2025Fire-Resistance Rated ConstructionRene Navarreteprogress
04/14/2025Fenestration and door U-factor and product ratingsRene Navarreteenergy_progress
04/14/2025Fenestration air leakageRene Navarreteenergy_progress
04/14/2025Air barrier - visual inspectionRene Navarreteenergy_progress
04/14/2025Fenestration areasRene Navarreteenergy_progress
04/14/2025Interior lighting powerRene Navarreteenergy_progress
04/14/2025Lighting controlsRene Navarreteenergy_progress
04/14/2025Lighting in dwelling unitsRene Navarreteenergy_progress
04/14/2025Concrete - Cast-In-PlaceRene Navarretespecial
04/14/2025Excavations - Sheeting, Shoring, and BracingRene Navarretespecial
04/14/2025Fire-Resistant Penetrations and JointsRene Navarretespecial
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/18/2026S01210054-S1Request digital key ↗
08/18/2026S01210054-S2Request digital key ↗
08/18/2026S01210054-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S01210054-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/18/2026S01210054-S2Open ↗
08/13/2026S01210054-S1Open ↗
08/13/2026S01210054-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/23/2026S01210054-I1Open ↗
08/23/2026S01210054-I1Open ↗
08/23/2026S01210054-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026S01210054-I1Open ↗
08/23/2026S01210054-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01210054-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01210054-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S01210054-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026S01210054-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026S01210054-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S01210054-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026S01210054-I1Open ↗