← Back
One family attached or semi-detached
9 CROFT PLACE
STATEN ISLAND · BIN 5034993
💬 Discuss this project
1978Year Built
2Stories
A5Building Class
R3-1Zoning
1,420 sfGross Floor Area
1Units
One family attached or semi-detached · 2,950 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC108/19/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor108/25/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/19/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
09/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
09/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
09/16/2026
Special inspection requirement — Final
Walid Abdulla
09/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
09/16/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/24/2026
Permit issued — Solar
S01446708-I1-SL
08/19/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01446708-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC08/24/2026
1 project · most recent 08/19/2026
General Wiring
FiledStatusContractorScope
08/19/2026CompleteSUNRUN SOLAR ELECTL CORPGeneral Wiring
1 project · most recent 08/19/2026
FiledStatusContractorScope
08/19/2026Signed-offSUNRUN INSTALLATION SVC17 panels, 7.65 kw, 357 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/16/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
09/16/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
09/16/2026FinalWalid Abdullaprogress
09/16/2026Energy Code Compliance InspectionsWalid Abdullaprogress
09/16/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026S01446708-I1Request digital key ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026S01446708-P1Open ↗
09/23/2026S01446708-P1Open ↗
09/23/2026S01446708-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026S01446708-P1Open ↗
09/23/2026S01446708-I1Open ↗
09/23/2026S01446708-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026S01446708-I1Open ↗