1920Year Built
1.5Stories
K1Building Class
M1-1Zoning
2,606 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: BMF PROPERTIES LLC · 37,193 sf lot · 0.07 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 17p · 2 filings · 20 docs
Cellar8p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BMF PROPERTIES1707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RYAN DESIGN ARCHITECTURE407/16/2025
JIAN ENGINEERING PLLC205/23/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RYAN DESIGN ARCHITECTURE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAXIMUM CONTRACTING INCGeneral Contractor303/21/2026
DANICK ELEC'L CONTR'G CORElectrical103/22/2026
J.B.I. CONSTRUCTION GROUPGeneral Contractor107/08/2026
K.M.D MECHANICAL 1443 LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN DESIGN ARCHITECTURE7159109/30/2022
Building Lifecycle
All (56)Filed (6)Permit Issued (3)Signed Off (2)Violation (1)Inspection (9)Objection (26)Special Inspection (9)
10/03/2025
Signed off — Alteration CO
NO WORK-SUBSEQUENT FILING BEING FILED IN CONJUNCTION WITH S08010188-I1 STRICTLY FOR THE PAPERWORK PURPOSES OF CORRECTING THE PW1 PAPERWORK DETAILS AND SCH A C of O comments corrections , ALL INSPECTIONS WERE PREFORMED UNDER S08010188-I1
S08010188-S1
07/24/2025
Objection raised — Other
07/24/2025
Objection resolved — Addressed
07/16/2025
Filed — Alteration CO
NO WORK-SUBSEQUENT FILING BEING FILED IN CONJUNCTION WITH S08010188-I1 STRICTLY FOR THE PAPERWORK PURPOSES OF CORRECTING THE PW1 PAPERWORK DETAILS AND SCH A C of O comments corrections , ALL INSPECTIONS WERE PREFORMED UNDER S08010188-I1
S08010188-P3
06/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/20/2025
Permit issued — General Construction
S08010188-S1-GC
01/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/04/2024
Filed — Alteration CO
NO WORK-SUBSEQUENT FILING BEING FILED IN CONJUNCTION WITH S08010188-I1 STRICTLY FOR THE PAPERWORK PURPOSES OF CORRECTING THE PW1 PAPERWORK DETAILS AND SCH A C of O comments corrections , ALL INSPECTIONS WERE PREFORMED UNDER S08010188-I1
S08010188-P2
06/05/2024
Objection resolved — Addressed
05/23/2024
Objection raised — Other
05/19/2024
Objection resolved — Addressed
05/17/2024
Objection raised — Other
05/08/2024
Filed — Alteration CO
NO WORK-SUBSEQUENT FILING BEING FILED IN CONJUNCTION WITH S08010188-I1 STRICTLY FOR THE PAPERWORK PURPOSES OF CORRECTING THE PW1 PAPERWORK DETAILS AND SCH A C of O comments corrections , ALL INSPECTIONS WERE PREFORMED UNDER S08010188-I1
S08010188-S1
11/16/2023
Signed off — Alteration
gas piping, new gas meter osp, furnace (2) forced air furnaceS and Hot Water Heater in Cellar, KITCHEN SINK
S00696823-I1
11/01/2023
Violation issued (ECB, closed)
Construction
09/08/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/30/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/26/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/24/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/23/2023
Filed — Alteration
gas piping, new gas meter osp, furnace (2) forced air furnaceS and Hot Water Heater in Cellar, KITCHEN SINK
S00696823-P1
02/14/2023
Permit issued — General Construction
S08010188-I1-GC
12/01/2022
Objection raised — Other
12/01/2022
Objection resolved — Addressed
11/30/2022
Objection resolved — Addressed
11/18/2022
Objection resolved — Addressed
11/03/2022
Objection resolved — Addressed
11/02/2022
Objection resolved — Addressed
11/02/2022
Objection resolved — Addressed
11/02/2022
Objection resolved — Addressed
11/02/2022
Objection resolved — Addressed
11/02/2022
Objection resolved — Addressed
11/02/2022
Objection resolved — Addressed
10/17/2022
Objection raised — Other
10/17/2022
Objection raised — Other
10/17/2022
Objection raised — Other
10/17/2022
Objection raised — Other
10/17/2022
Objection raised — Other
10/17/2022
Objection raised — Other
10/17/2022
Objection raised — Other
10/17/2022
Objection raised — Other
10/17/2022
Objection raised — Other
09/30/2022
Filed — Alteration CO
NO WORK-SUBSEQUENT FILING BEING FILED IN CONJUNCTION WITH S08010188-I1 STRICTLY FOR THE PAPERWORK PURPOSES OF CORRECTING THE PW1 PAPERWORK DETAILS AND SCH A C of O comments corrections , ALL INSPECTIONS WERE PREFORMED UNDER S08010188-I1
S08010188-I1
09/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Ryan
09/26/2022
Special inspection requirement — Energy Code Compliance Inspections
Daniel Ryan
09/26/2022
Special inspection requirement — Fire-Resistance Rated Construction
Daniel Ryan
09/26/2022
Special inspection requirement — Air barrier - visual inspection
Daniel Ryan
09/26/2022
Special inspection requirement — Fenestration areas
Daniel Ryan
09/26/2022
Special inspection requirement — Exterior lighting power
Daniel Ryan
09/26/2022
Special inspection requirement — Fenestration air leakage
Daniel Ryan
09/26/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Daniel Ryan
09/26/2022
Special inspection requirement — Insulation placement and R values
Daniel Ryan
05/16/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/10/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/10/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/05/2022
Permit issued — Plumbing
S00696823-I1-PL
04/11/2022
Filed — Alteration
gas piping, new gas meter osp, furnace (2) forced air furnaceS and Hot Water Heater in Cellar, KITCHEN SINK
S00696823-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMAXIMUM CONTRACTING INC06/20/2025
DOB NOWGeneral ConstructionPermit IssuedJ.B.I. CONSTRUCTION GROUP02/14/2023
DOB NOWPlumbingSigned-offK.M.D MECHANICAL 1443 LLC05/05/2022
3 projects · most recent 11/10/2023
General Wiring
FiledStatusContractorScope
11/10/2023CancelledDANICK ELEC'L CONTR'G CORGeneral Wiring
11/03/2023CancelledDANICK ELEC'L CONTR'G CORGeneral Wiring
06/08/2023CompleteDANICK ELEC'L CONTR'G CORGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/08/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/30/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/26/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/24/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/16/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/10/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
09/26/2022Fire-Resistant Penetrations and JointsDaniel Ryanspecial
09/26/2022Energy Code Compliance InspectionsDaniel Ryanprogress
09/26/2022Fire-Resistance Rated ConstructionDaniel Ryanprogress
09/26/2022Air barrier - visual inspectionDaniel Ryanenergy_progress
09/26/2022Fenestration areasDaniel Ryanenergy_progress
09/26/2022Exterior lighting powerDaniel Ryanenergy_progress
09/26/2022Fenestration air leakageDaniel Ryanenergy_progress
09/26/2022Fenestration and door U-factor and product ratingsDaniel Ryanenergy_progress
09/26/2022Insulation placement and R valuesDaniel Ryanenergy_progress
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/23/2026S00696823-P1Request digital key ↗
08/23/2026S00696823-I1Request digital key ↗
08/18/2026S08010188-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026S08010188-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026S08010188-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026S00696823-P1Open ↗
08/23/2026S00696823-I1Open ↗
08/18/2026S08010188-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/28/2026S08010188-I1Open ↗
09/28/2026S08010188-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/28/2026S08010188-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist4
08/18/2026S08010188-P2Open ↗
08/15/2026S08010188-I1Open ↗
08/15/2026S08010188-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026S08010188-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026S00696823-P1Open ↗
08/23/2026S00696823-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00696823-I1Open ↗
▸Other Documents14
▸DOB NOWSite Survey: Initial4
08/15/2026S08010188-I1Open ↗
08/15/2026S08010188-S1Open ↗
08/14/2026S08010188-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/15/2026S08010188-I1Open ↗
08/15/2026S08010188-S1Open ↗
08/14/2026S08010188-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/15/2026S08010188-I1Open ↗
08/15/2026S08010188-S1Open ↗
08/14/2026S08010188-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification1
08/15/2026S08010188-I1Open ↗
▸DOB NOWFinal Survey1
08/15/2026S08010188-I1Open ↗