← Back
Two stories - detached, small or mid-size
35 SIDEVIEW AVENUE
STATEN ISLAND · BIN 5036825
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R3XZoning
2,100 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 8,000 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
General
Roof1p · 1 filing · 7 docs
1 job · most recent 05/11/2026
Steel
FiledStatusContractorScope
05/11/2026——Steel
1 job · most recent 05/11/2026
Fence
FiledStatusContractorScope
05/11/2026——Fence
Building Lifecycle
All (40)Filed (1)Violation (9)Objection (10)Special Inspection (20)
06/01/2026
Objection raised — Zoning
06/01/2026
Objection raised — Scope
06/01/2026
Objection raised — Inspections
06/01/2026
Objection raised — Structural
06/01/2026
Objection raised — Zoning
06/01/2026
Objection raised — Energy
06/01/2026
Objection raised — Structural
06/01/2026
Objection raised — Structural
06/01/2026
Objection raised — Other
06/01/2026
Objection raised — Structural
05/11/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
CURB CUT 10'
S01375174-I1
03/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/19/2026
Special inspection requirement — Concrete - Cast-In-Place
03/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/19/2026
Special inspection requirement — Structural Cold-Formed Steel
03/19/2026
Special inspection requirement — Structural Steel - Details
03/19/2026
Special inspection requirement — Subgrade Inspections
03/19/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
03/19/2026
Special inspection requirement — Final
03/19/2026
Special inspection requirement — Footing and Foundation
03/19/2026
Special inspection requirement — Energy Code Compliance Inspections
03/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
03/19/2026
Special inspection requirement — Electric vehicle service equipment requirements
03/19/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/19/2026
Special inspection requirement — Interior lighting power
03/19/2026
Special inspection requirement — Insulation placement and R values
03/19/2026
Special inspection requirement — Fenestration areas
03/19/2026
Special inspection requirement — Air barrier — testing
03/19/2026
Special inspection requirement — Fenestration air leakage
03/19/2026
Special inspection requirement — Air barrier - visual inspection
03/19/2026
Special inspection requirement — Permanent certificate
02/19/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/27/2019
Violation issued (ECB, closed)
Construction
09/04/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/09/2019
Violation issued (ECB, closed)
Construction
06/14/2019
Violation issued (ECB, closed)
Construction
03/18/2019
Violation issued (ECB, closed)
Construction
03/18/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/2019
Violation issued (DOB, closed)
V%*-DOB VIOLATION - DISMISSED
05/12/1998
Violation issued (ECB, closed)
Zoning
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RYAN DESIGN ARCHITECTURE105/11/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
03/19/2026Structural Stability – Alterations of existing buildings—special
03/19/2026Concrete - Cast-In-Place—special
03/19/2026Fire-Resistant Penetrations and Joints—special
03/19/2026Structural Cold-Formed Steel—special
03/19/2026Structural Steel - Details—special
03/19/2026Subgrade Inspections—special
03/19/2026Subsurface Investigations (Borings/Test Pits)—special
03/19/2026Final—progress
03/19/2026Footing and Foundation—progress
03/19/2026Energy Code Compliance Inspections—progress
03/19/2026Fire-Resistance Rated Construction—progress
03/19/2026Electric vehicle service equipment requirements—energy_progress
03/19/2026Fenestration and door U-factor and product ratings—energy_progress
03/19/2026Interior lighting power—energy_progress
03/19/2026Insulation placement and R values—energy_progress
03/19/2026Fenestration areas—energy_progress
03/19/2026Air barrier — testing —energy_progress
03/19/2026Fenestration air leakage—energy_progress
03/19/2026Air barrier - visual inspection—energy_progress
03/19/2026Permanent certificate—energy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/14/2026S01375174-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026S01375174-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026S01375174-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026S01375174-I1Open ↗
08/16/2026S01375174-S2Open ↗
08/16/2026S01375174-S1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026S01375174-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026S01375174-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/14/2026S01375174-I1Open ↗