Two stories - detached, small or mid-size
71 MC CULLY AVENUE
STATEN ISLAND · BIN 5037016
💬 Discuss this project
1985Year Built
2Stories
A1Building Class
R1-2Zoning
2,775 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,336 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 23p · 1 filing · 20 docs
Floor 1
1 job · most recent 05/23/2023
General Wiring
FiledStatusContractorScope
05/23/2023CompleteJ.V.C. ELEC SERVICE CORPGeneral Wiring
Building Lifecycle
All (45)Filed (5)Permit Issued (3)Signed Off (3)Inspection (2)Objection (2)Special Inspection (30)
12/07/2023
Signed off — Alteration
INSTALL NEW WATER/SANITARY PLUMBING SYSTEM IN CONNECTION WITH NEW ENLARGEMENT, TO CONNECT TO EXISTING WATER/SANITARY DRAINAGE SYSTEM, INCLUDING SOIL AND VENT PIPING, HOT AND COLD WATER PIPING AND NEW PLUMBING FIXTURES.
S00864974-I1
12/07/2023
Signed off — Alteration
INSTALL NEW WATER/SANITARY PLUMBING SYSTEM IN CONNECTION WITH NEW ENLARGEMENT, TO CONNECT TO EXISTING WATER/SANITARY DRAINAGE SYSTEM, INCLUDING SOIL AND VENT PIPING, HOT AND COLD WATER PIPING AND NEW PLUMBING FIXTURES.
S00864974-S1
12/04/2023
Special inspection requirement — Permanent certificate
Richard Dailey
12/04/2023
Special inspection requirement — Mechanical Systems
Richard Dailey
12/04/2023
Special inspection requirement — Heating Systems
Richard Dailey
12/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Richard Dailey
12/04/2023
Special inspection requirement — Fire-Resistance Rated Construction
Richard Dailey
12/04/2023
Special inspection requirement — Energy Code Compliance Inspections
Richard Dailey
12/04/2023
Special inspection requirement — Final
Richard Dailey
12/04/2023
Special inspection requirement — Structural Wood Frame
Richard Dailey
12/04/2023
Special inspection requirement — Interior lighting power
Richard Dailey
12/04/2023
Special inspection requirement — Duct leakage testing, insulation and design
Richard Dailey
12/04/2023
Special inspection requirement — Fenestration areas
Richard Dailey
12/04/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Richard Dailey
12/04/2023
Special inspection requirement — HVAC-R and service water heating system controls
Richard Dailey
12/04/2023
Special inspection requirement — Air barrier — testing
Richard Dailey
12/04/2023
Special inspection requirement — Ventilation and air distribution system
Richard Dailey
12/04/2023
Special inspection requirement — Insulation placement and R values
Richard Dailey
12/04/2023
Special inspection requirement — Fenestration air leakage
Richard Dailey
12/04/2023
Special inspection requirement — HVAC-R and service water heating equipment
Richard Dailey
12/04/2023
Special inspection requirement — Maintenance information
Richard Dailey
12/04/2023
Special inspection requirement — Air barrier - visual inspection
Richard Dailey
12/04/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Richard Dailey
11/28/2023
Filed — Alteration
INSTALL NEW WATER/SANITARY PLUMBING SYSTEM IN CONNECTION WITH NEW ENLARGEMENT, TO CONNECT TO EXISTING WATER/SANITARY DRAINAGE SYSTEM, INCLUDING SOIL AND VENT PIPING, HOT AND COLD WATER PIPING AND NEW PLUMBING FIXTURES.
S00864974-P2
11/20/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/08/2023
Signed off — Alteration
S00856019-I1
07/18/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/08/2023
Permit issued — Plumbing
S00864974-S1-PL
06/06/2023
Permit issued — Mechanical Systems
S00864974-I1-GC-CX
06/05/2023
Filed — Alteration
INSTALL NEW WATER/SANITARY PLUMBING SYSTEM IN CONNECTION WITH NEW ENLARGEMENT, TO CONNECT TO EXISTING WATER/SANITARY DRAINAGE SYSTEM, INCLUDING SOIL AND VENT PIPING, HOT AND COLD WATER PIPING AND NEW PLUMBING FIXTURES.
S00864974-P1
06/05/2023
Special inspection requirement — Duct leakage testing, insulation and design
Richard Dailey
06/05/2023
Special inspection requirement — Final
Richard Dailey
06/05/2023
Special inspection requirement — Maintenance information
Richard Dailey
06/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Richard Dailey
06/05/2023
Special inspection requirement — Permanent certificate
Richard Dailey
06/05/2023
Special inspection requirement — Ventilation and air distribution system
Richard Dailey
06/05/2023
Special inspection requirement — Air barrier - visual inspection
Richard Dailey
06/05/2023
Special inspection requirement — HVAC-R and service water heating equipment
Richard Dailey
06/05/2023
Special inspection requirement — Chimneys and vents
Richard Dailey
05/18/2023
Objection resolved — Addressed
05/17/2023
Objection raised — Scope
05/11/2023
Permit issued — Construction Fence
S00856019-I1-FN
04/27/2023
Filed — Alteration
INSTALL NEW WATER/SANITARY PLUMBING SYSTEM IN CONNECTION WITH NEW ENLARGEMENT, TO CONNECT TO EXISTING WATER/SANITARY DRAINAGE SYSTEM, INCLUDING SOIL AND VENT PIPING, HOT AND COLD WATER PIPING AND NEW PLUMBING FIXTURES.
S00864974-I1
04/27/2023
Filed — Alteration
INSTALL NEW WATER/SANITARY PLUMBING SYSTEM IN CONNECTION WITH NEW ENLARGEMENT, TO CONNECT TO EXISTING WATER/SANITARY DRAINAGE SYSTEM, INCLUDING SOIL AND VENT PIPING, HOT AND COLD WATER PIPING AND NEW PLUMBING FIXTURES.
S00864974-S1
04/19/2023
Filed — Alteration
S00856019-I1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TONY SAYAD ARCHITECT511/28/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SURF SIDE PROPERTIES INCGeneral Contractor203/21/2026
CAPITAL CONTR P&H CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROGERS CALVANICO GROUP PL1324411/28/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCAPITAL CONTR P&H CORP06/08/2023
DOB NOWMechanical SystemsSigned-offSURF SIDE PROPERTIES INC06/06/2023
DOB NOWConstruction FenceSigned-offSURF SIDE PROPERTIES INC05/11/2023
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
12/04/2023Permanent certificateRichard Daileyenergy_progress
12/04/2023Mechanical SystemsRichard Daileyspecial
12/04/2023Heating SystemsRichard Daileyspecial
12/04/2023Fire-Resistant Penetrations and JointsRichard Daileyspecial
12/04/2023Fire-Resistance Rated ConstructionRichard Daileyprogress
12/04/2023Energy Code Compliance InspectionsRichard Daileyprogress
12/04/2023FinalRichard Daileyprogress
12/04/2023Structural Wood FrameRichard Daileyprogress
12/04/2023Interior lighting powerRichard Daileyenergy_progress
12/04/2023Duct leakage testing, insulation and designRichard Daileyenergy_progress
12/04/2023Fenestration areasRichard Daileyenergy_progress
12/04/2023HVAC-R and service water piping design and insulationRichard Daileyenergy_progress
12/04/2023HVAC-R and service water heating system controlsRichard Daileyenergy_progress
12/04/2023Air barrier — testing Richard Daileyenergy_progress
12/04/2023Ventilation and air distribution systemRichard Daileyenergy_progress
12/04/2023Insulation placement and R valuesRichard Daileyenergy_progress
12/04/2023Fenestration air leakageRichard Daileyenergy_progress
12/04/2023HVAC-R and service water heating equipmentRichard Daileyenergy_progress
12/04/2023Maintenance informationRichard Daileyenergy_progress
12/04/2023Air barrier - visual inspectionRichard Daileyenergy_progress
12/04/2023Fenestration and door U-factor and product ratingsRichard Daileyenergy_progress
06/05/2023Duct leakage testing, insulation and designRichard Daileyenergy_progress
06/05/2023FinalRichard Daileyprogress
06/05/2023Maintenance informationRichard Daileyenergy_progress
06/05/2023HVAC-R and service water piping design and insulationRichard Daileyenergy_progress
Latest 25 of 49.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026S00856019-I1Request digital key ↗
08/22/2026S00864974-P2Request digital key ↗
08/22/2026S00864974-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00864974-I1Open ↗
08/13/2026S00864974-P2Open ↗
08/13/2026S00864974-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00864974-I1Open ↗
08/13/2026S00864974-P2Open ↗
08/13/2026S00864974-P1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature14
08/28/2026S00864974-S1Open ↗
08/28/2026S00864974-S1Open ↗
08/27/2026S00864974-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/28/2026S00864974-S1Open ↗
08/27/2026S00864974-P1Open ↗
08/27/2026S00864974-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/22/2026S00864974-S1Open ↗
08/22/2026S00864974-P2Open ↗
08/22/2026S00864974-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/22/2026S00864974-P2Open ↗
08/22/2026S00864974-P1Open ↗
08/22/2026S00864974-S1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents9
▸DOB NOWPlot Diagram3
08/13/2026S00864974-I1Open ↗
08/13/2026S00864974-P2Open ↗
08/13/2026S00864974-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00864974-I1Open ↗
08/13/2026S00864974-P2Open ↗
08/13/2026S00864974-P1Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026S00864974-P2Open ↗
08/13/2026S00864974-P1Open ↗
08/13/2026S00864974-I1Open ↗