← Back
Two stories - detached, small or mid-size
3981 VICTORY BOULEVARD
STATEN ISLAND · BIN 5042006
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R3AZoning
2,650 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 8,370 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 19 docs
Floor 23p · 1 filing · 19 docs
Floor 13p · 1 filing · 19 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WILLY C. YUIN ARCH. PLLC103/28/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MAB CONSULTING SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALFONSO'S HOME IMPROVEMENGeneral Contractor304/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDTECH ENGINEERING6369103/28/2024
Building Lifecycle
All (19)Filed (1)Permit Issued (2)Violation (2)Special Inspection (14)
02/19/2025
Permit issued — General Construction
S01009203-I1-GC
09/11/2024
Violation issued (ECB, closed)
Construction
04/05/2024
Permit issued — General Construction
S01009203-I1-GC
03/28/2024
Filed — Alteration
LEGALIZE CONSTRUCTION OF A ONE - STORYROOM EXTENSION TO THE EXISTING ONE - FAMILY RESIDENCE AND CORRECT DOB VIOL.# VI024 - 00313 AND COMPLAINT #518204 INCLUDING EXISTING DORMER & ENTRY DOOR TO EXIST. GARAGE. NO CHANGE IN USE, EGRESS OCCUPAN
S01009203-I1
03/28/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Luis Pichardo
03/23/2024
Special inspection requirement — Subgrade Inspections
Luis Pichardo
03/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Luis Pichardo
03/23/2024
Special inspection requirement — Energy Code Compliance Inspections
RONALD VILLANO
03/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
RONALD VILLANO
03/23/2024
Special inspection requirement — Permanent certificate
RONALD VILLANO
03/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
03/23/2024
Special inspection requirement — Fenestration areas
RONALD VILLANO
03/23/2024
Special inspection requirement — Fenestration air leakage
RONALD VILLANO
03/23/2024
Special inspection requirement — Air barrier - visual inspection
RONALD VILLANO
03/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
RONALD VILLANO
03/23/2024
Special inspection requirement — Lighting in dwelling units
RONALD VILLANO
03/23/2024
Special inspection requirement — Insulation placement and R values
RONALD VILLANO
02/21/2024
Special inspection requirement — Final
RONALD VILLANO
02/07/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedALFONSO'S HOME IMPROVEMEN02/19/2025
DOB NOWGeneral ConstructionPermit IssuedALFONSO'S HOME IMPROVEMEN04/05/2024
1 project · most recent 02/07/2024
General Wiring
FiledStatusContractorScope
02/07/2024Permit IssuedFIRST QUALITY ELECL LLCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
03/28/2024Subsurface Investigations (Borings/Test Pits)Luis Pichardospecial
03/23/2024Subgrade InspectionsLuis Pichardospecial
03/23/2024Structural Stability – Alterations of existing buildingsLuis Pichardospecial
03/23/2024Energy Code Compliance InspectionsRONALD VILLANOprogress
03/23/2024Fire-Resistance Rated ConstructionRONALD VILLANOprogress
03/23/2024Permanent certificateRONALD VILLANOenergy_progress
03/23/2024Fire-Resistant Penetrations and JointsLuis Pichardospecial
03/23/2024Fenestration areasRONALD VILLANOenergy_progress
03/23/2024Fenestration air leakageRONALD VILLANOenergy_progress
03/23/2024Air barrier - visual inspectionRONALD VILLANOenergy_progress
03/23/2024Fenestration and door U-factor and product ratingsRONALD VILLANOenergy_progress
03/23/2024Lighting in dwelling unitsRONALD VILLANOenergy_progress
03/23/2024Insulation placement and R valuesRONALD VILLANOenergy_progress
02/21/2024FinalRONALD VILLANOprogress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026S01009203-I1Request digital key ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026S01009203-I1Open ↗
09/01/2026S01009203-I1Open ↗
09/01/2026S01009203-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026S01009203-I1Open ↗
09/01/2026S01009203-I1Open ↗
09/01/2026S01009203-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026S01009203-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026S01009203-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01009203-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S01009203-I1Open ↗