← Back
Two stories - detached, small or mid-size
553 TOMPKINS AVENUE
STATEN ISLAND · BIN 5042779
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R3-2Zoning
1,144 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: HIPO HOLDINGS LLC · 2,150 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 22p · 2 filings · 19 docs
Floor 1
Cellar1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JARNS HOLDING707/08/2026
HIPO HOLDINGS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FANG ARCHITECT402/16/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JAYA CONTRACTING INCGeneral Contractor107/08/2026
SMART PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FANG ARCHITECT5513402/16/2023
Building Lifecycle
All (34)Filed (4)Permit Issued (2)Signed Off (2)Violation (3)Inspection (3)Special Inspection (20)
11/29/2024
Violation issued (ECB, closed)
Construction
03/13/2023
Signed off — Alteration
PLUMBING WORK FOR A ONE FAMILY HOUSE.
S00755085-I1
03/02/2023
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING 1-FAMILY HOUSE. NO CHANGE TO EXISTING USE, EGRESS, & OCCUPANCY.
S00753034-I1
03/01/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/16/2023
Filed — Alteration
PLUMBING WORK FOR A ONE FAMILY HOUSE.
S00755085-P1
02/16/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 1-FAMILY HOUSE. NO CHANGE TO EXISTING USE, EGRESS, & OCCUPANCY.
S00753034-P1
02/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
02/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
02/16/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
02/16/2023
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
02/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
02/16/2023
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
02/16/2023
Special inspection requirement — Interior lighting power
DEZHANG FANG
02/16/2023
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
02/16/2023
Special inspection requirement — Maintenance information
DEZHANG FANG
02/16/2023
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
02/15/2023
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
02/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
02/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
02/15/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
02/15/2023
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
02/15/2023
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
02/15/2023
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
02/15/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
02/15/2023
Special inspection requirement — Interior lighting power
DEZHANG FANG
02/15/2023
Special inspection requirement — Maintenance information
DEZHANG FANG
08/08/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/27/2022
Permit issued — Plumbing
S00755085-I1-PL
07/26/2022
Permit issued — General Construction
S00753034-I1-GC
06/09/2022
Filed — Alteration
PLUMBING WORK FOR A ONE FAMILY HOUSE.
S00755085-I1
06/09/2022
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 1-FAMILY HOUSE. NO CHANGE TO EXISTING USE, EGRESS, & OCCUPANCY.
S00753034-I1
09/02/2014
Violation issued (ECB, closed)
Unknown
10/01/2013
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSMART PLBG & HTG CORP07/27/2022
DOB NOWGeneral ConstructionSigned-offJAYA CONTRACTING INC07/26/2022
1 project · most recent 07/28/2022
General Wiring
FiledStatusContractorScope
07/28/2022CompleteINTELOGIC ELECTRIC, INC.General Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/01/2023Pass-Final General Construction Non-Directive 14PassView ↗
08/08/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
02/16/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
02/16/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
02/16/2023Energy Code Compliance InspectionsDEZHANG FANGprogress
02/16/2023Fire-Resistance Rated ConstructionDEZHANG FANGprogress
02/16/2023HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
02/16/2023Insulation placement and R valuesDEZHANG FANGenergy_progress
02/16/2023Interior lighting powerDEZHANG FANGenergy_progress
02/16/2023HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
02/16/2023Maintenance informationDEZHANG FANGenergy_progress
02/16/2023HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
02/15/2023HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
02/15/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
02/15/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
02/15/2023Energy Code Compliance InspectionsDEZHANG FANGprogress
02/15/2023Fire-Resistance Rated ConstructionDEZHANG FANGprogress
02/15/2023Insulation placement and R valuesDEZHANG FANGenergy_progress
02/15/2023HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
02/15/2023HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
02/15/2023Interior lighting powerDEZHANG FANGenergy_progress
02/15/2023Maintenance informationDEZHANG FANGenergy_progress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026S00755085-I1Request digital key ↗
08/24/2026S00755085-P1Request digital key ↗
08/23/2026S00753034-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026S00755085-P1Open ↗
08/24/2026S00755085-I1Open ↗
08/13/2026S00753034-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026S00753034-P1Open ↗
09/01/2026S00753034-P1Open ↗
08/26/2026S00753034-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026S00753034-P1Open ↗
08/27/2026S00755085-I1Open ↗
08/26/2026S00753034-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026S00753034-P1Open ↗
08/13/2026S00753034-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00753034-I1Open ↗