← Back
Multi-story retail building (2+)
1230 BAY STREET
STATEN ISLAND · BIN 5042875
💬 Discuss this project
1931Year Built
3Stories
K2Building Class
R3AZoning
3,075 sfGross Floor Area
1Units
16 Open Violations ▸FDNY Report ↗
Multi-story retail building (2+) · Owner of record: 1230 BAY STREET, LLC · 2,500 sf lot · 1.23 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalGeneral
Roof6p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1230 BAY STREET, LLC103/22/2026
ACE GROUP NY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SANNA & LOCCISANO ARCHITECTS, P.C.307/02/2025
ENTHINK ENGINEERS LLC109/10/2023
GEORGE SIGALOS P.E.101/27/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SANNA LOCCISANO ARCHITECTS P C603/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JONICO CONSTRUCTION LLCGeneral Contractor1007/08/2026
NOCE CONSTRUCTION CORPGeneral Contractor307/08/2026
QUALITY PLUMBING, INCPlumbing207/08/2026
RELIABLE PLBG & HTG CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738407/02/2025
Building Lifecycle
All (80)Filed (5)Permit Issued (10)Signed Off (3)Violation (21)Inspection (14)Special Inspection (27)
05/11/2026
Signed off — Alteration
FILE ALTERATION APPLICATION (NO C OF O) FOR INTERIOR RENOVATION OF THE EXISTING THREE-STORY AND CELLAR MIXED USE BUILDING. SEE COMMENT SECTION AND SITE PLAN FOR FULL SCOPE OF WORK FOR THIS FILING.
S00648709-I1
04/30/2026
Signed off — Alteration
FILE ALTERATION APPLICATION (NO C OF O) FOR INTERIOR RENOVATION OF THE EXISTING THREE-STORY AND CELLAR MIXED USE BUILDING. SEE COMMENT SECTION AND SITE PLAN FOR FULL SCOPE OF WORK FOR THIS FILING.
S00648709-S1
04/30/2026
Signed off — Alteration
FILE ALTERATION APPLICATION (NO C OF O) FOR INTERIOR RENOVATION OF THE EXISTING THREE-STORY AND CELLAR MIXED USE BUILDING. SEE COMMENT SECTION AND SITE PLAN FOR FULL SCOPE OF WORK FOR THIS FILING.
S00648709-S2
03/09/2026
Permit issued — Plumbing
S31515733-S1-PL
03/02/2026
Inspection — Fail-Final PL - Underground
Fail
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/08/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/02/2025
Filed — Alteration
FILE ALTERATION APPLICATION (NO C OF O) FOR INTERIOR RENOVATION OF THE EXISTING THREE-STORY AND CELLAR MIXED USE BUILDING. SEE COMMENT SECTION AND SITE PLAN FOR FULL SCOPE OF WORK FOR THIS FILING.
S00648709-P1
07/01/2025
Special inspection requirement — Wood – Seismic Resistance
06/16/2025
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
06/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
06/16/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
06/16/2025
Special inspection requirement — Structural Cold-Formed Steel
anthony santoro
06/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
anthony santoro
06/16/2025
Special inspection requirement — Structural Steel - Details
anthony santoro
06/16/2025
Special inspection requirement — Structural Steel - High Strength Bolting
anthony santoro
06/16/2025
Special inspection requirement — Structural Steel - Welding
anthony santoro
06/16/2025
Special inspection requirement — Subgrade Inspections
anthony santoro
06/16/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
06/16/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
06/16/2025
Special inspection requirement — Final
anthony santoro
06/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
06/16/2025
Special inspection requirement — Footing and Foundation
anthony santoro
06/16/2025
Special inspection requirement — Structural Wood Frame
anthony santoro
06/16/2025
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
06/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
06/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
06/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
06/16/2025
Special inspection requirement — Fenestration air leakage
anthony santoro
06/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
06/16/2025
Special inspection requirement — Metering
anthony santoro
06/16/2025
Special inspection requirement — Maintenance information
anthony santoro
06/16/2025
Special inspection requirement — Fenestration areas
anthony santoro
06/16/2025
Special inspection requirement — Permanent certificate
anthony santoro
06/16/2025
Special inspection requirement — Insulation placement and R values
anthony santoro
05/06/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/23/2024
Permit issued — Foundation
S00648709-I1-GC-CX
10/21/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/21/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/18/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
10/16/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/30/2024
Permit issued — Structural
S00648709-I1-GC-CX
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/17/2024
Permit issued — Plumbing
S00648709-S1-PL
05/15/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/02/2024
Inspection — Fail-Final PL - Underground
Fail
View inspection ↗
12/01/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/20/2023
Permit issued — Plumbing
S31515733-S1-PL
11/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/11/2023
Permit issued — Plumbing
S00648709-S1-PL
10/05/2023
Permit issued — Mechanical Systems
S00648709-S2-MS
09/29/2023
Permit issued — Structural
S00648709-I1-GC-CX
09/10/2023
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S00930291-I1
08/04/2023
Permit issued — Mechanical Systems
S00648709-S2-MS
07/25/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/17/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/06/2023
Permit issued — Structural
S00648709-I1-GC-CX
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC03/09/2026
DOB NOWFoundationSigned-offJONICO CONSTRUCTION LLC12/23/2024
DOB NOWStructuralSigned-offJONICO CONSTRUCTION LLC09/30/2024
DOB NOWPlumbingSigned-offRELIABLE PLBG & HTG CORP09/17/2024
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC11/20/2023
DOB NOWPlumbingSigned-offRELIABLE PLBG & HTG CORP10/11/2023
DOB NOWMechanical SystemsSigned-offJONICO CONSTRUCTION LLC10/05/2023
DOB NOWStructuralSigned-offJONICO CONSTRUCTION LLC09/29/2023
DOB NOWMechanical SystemsSigned-offTOTAL BLD & CONO MAIN INC08/04/2023
DOB NOWStructuralSigned-offTOTAL BLD & CONO MAIN INC07/06/2023
1 project · most recent 04/22/2025
General Wiring
FiledStatusContractorScope
04/22/2025CompleteTRUE ELECTRIC CORP.General Wiring
1 project · most recent 07/02/2025
Steel Concrete Wood
FiledStatusContractorScope
07/02/2025Signed-offJONICO CONSTRUCTION LLCSteel, Concrete, Wood
1 project · most recent 09/10/2023
Sidewalk Shed
FiledStatusContractorScope
09/10/2023——Sidewalk Shed
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
03/02/2026Fail-Final PL - UndergroundFailView ↗
09/08/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/06/2025Fail-Final General Construction Non-Directive 14FailView ↗
01/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/21/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/21/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/18/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/16/2024Fail-Final CND-Occupancy InspectionFailView ↗
05/15/2024Pass-Final PL - UndergroundPassView ↗
05/02/2024Fail-Final PL - UndergroundFailView ↗
12/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/13/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/25/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/17/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
07/01/2025Wood – Seismic Resistance—special
06/16/2025Concrete - Cast-In-Placeanthony santorospecial
06/16/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
06/16/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
06/16/2025Structural Cold-Formed Steelanthony santorospecial
06/16/2025Structural Stability – Alterations of existing buildingsanthony santorospecial
06/16/2025Structural Steel - Detailsanthony santorospecial
06/16/2025Structural Steel - High Strength Boltinganthony santorospecial
06/16/2025Structural Steel - Weldinganthony santorospecial
06/16/2025Subgrade Inspectionsanthony santorospecial
06/16/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
06/16/2025Energy Code Compliance Inspectionsanthony santoroprogress
06/16/2025Finalanthony santoroprogress
06/16/2025Fire-Resistance Rated Constructionanthony santoroprogress
06/16/2025Footing and Foundationanthony santoroprogress
06/16/2025Structural Wood Frameanthony santoroprogress
06/16/2025Electric vehicle service equipment requirementsanthony santoroenergy_progress
06/16/2025HVAC-R and service water heating equipmentanthony santoroenergy_progress
06/16/2025Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
06/16/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
06/16/2025Fenestration air leakageanthony santoroenergy_progress
06/16/2025HVAC-R and service water piping design and insulationanthony santoroenergy_progress
06/16/2025Meteringanthony santoroenergy_progress
06/16/2025Maintenance informationanthony santoroenergy_progress
06/16/2025Fenestration areasanthony santoroenergy_progress
Latest 25 of 27.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026S00648709-S2Request digital key ↗
08/24/2026S00648709-I1Request digital key ↗
08/24/2026S00648709-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026S00648709-S1Open ↗
08/24/2026S00648709-I1Open ↗
08/24/2026S00648709-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026S00648709-P1Open ↗
08/28/2026S00648709-P1Open ↗
08/28/2026S00648709-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026S00648709-P1Open ↗
08/28/2026S00648709-P1Open ↗
08/28/2026S00648709-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026S00648709-S1Open ↗
08/24/2026S00648709-P1Open ↗
08/24/2026S00648709-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis3
08/24/2026S00648709-S1Open ↗
08/24/2026S00648709-I1Open ↗
08/24/2026S00648709-S2Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026S00648709-I1Open ↗
08/13/2026S00648709-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00648709-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00648709-I1Open ↗