← Back
Two stories - detached, small or mid-size
225 ANDERSON STREET
STATEN ISLAND · BIN 5042888
💬 Discuss this project
1910Year Built
2Stories
A1Building Class
R3-2Zoning
1,140 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,500 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof3p · 1 filing · 12 docs
Floor 12p · 1 filing · 12 docs
Basement2p · 1 filing · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RYAN DESIGN ARCHITECTURE103/06/2026
Building Lifecycle
All (33)Filed (1)Objection (11)Special Inspection (21)
05/11/2026
Special inspection requirement — Maintenance information
04/09/2026
Objection raised — Inspections
04/09/2026
Objection raised — Zoning
04/09/2026
Objection raised — Zoning
04/09/2026
Objection raised — Scope
04/09/2026
Objection raised — Structural
04/09/2026
Objection raised — Scope
04/09/2026
Objection raised — Energy
04/09/2026
Objection raised — Zoning
04/09/2026
Objection raised — Zoning
04/09/2026
Objection raised — Zoning
04/09/2026
Objection raised — Energy
03/06/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INTERIOR RENOVATION AND PROPOSED SIDE EXTENSION ,2ND FLOOR ADDITION AND CONVERSION TO 2 FAMILY IN EXISTING DETACHED HOME alt to meet nb requirements
S01367995-I1
03/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/05/2026
Special inspection requirement — Concrete - Cast-In-Place
03/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/05/2026
Special inspection requirement — Subgrade Inspections
03/05/2026
Special inspection requirement — Final
03/05/2026
Special inspection requirement — Footing and Foundation
03/05/2026
Special inspection requirement — Energy Code Compliance Inspections
03/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
03/05/2026
Special inspection requirement — Fenestration areas
03/05/2026
Special inspection requirement — Air barrier - visual inspection
03/05/2026
Special inspection requirement — Insulation placement and R values
03/05/2026
Special inspection requirement — Air barrier — testing
03/05/2026
Special inspection requirement — Permanent certificate
03/05/2026
Special inspection requirement — Fenestration air leakage
03/05/2026
Special inspection requirement — Interior lighting power
03/05/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/05/2026
Special inspection requirement — Metering
03/05/2026
Special inspection requirement — Electric vehicle service equipment requirements
03/05/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
03/05/2026
Special inspection requirement — Protection of exposed foundation insulation
Nothing on file for this building.
1 project · most recent 03/06/2026
Wood
FiledStatusContractorScope
03/06/2026——Wood
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
05/11/2026Maintenance information—energy_progress
03/05/2026Structural Stability – Alterations of existing buildings—special
03/05/2026Concrete - Cast-In-Place—special
03/05/2026Fire-Resistant Penetrations and Joints—special
03/05/2026Subgrade Inspections—special
03/05/2026Final—progress
03/05/2026Footing and Foundation—progress
03/05/2026Energy Code Compliance Inspections—progress
03/05/2026Fire-Resistance Rated Construction—progress
03/05/2026Fenestration areas—energy_progress
03/05/2026Air barrier - visual inspection—energy_progress
03/05/2026Insulation placement and R values—energy_progress
03/05/2026Air barrier — testing —energy_progress
03/05/2026Permanent certificate—energy_progress
03/05/2026Fenestration air leakage—energy_progress
03/05/2026Interior lighting power—energy_progress
03/05/2026Fenestration and door U-factor and product ratings—energy_progress
03/05/2026Metering—energy_progress
03/05/2026Electric vehicle service equipment requirements—energy_progress
03/05/2026Subsurface Investigations (Borings/Test Pits)—special
03/05/2026Protection of exposed foundation insulation—energy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026S01367995-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/17/2026S01367995-I1Open ↗
08/13/2026S01367995-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01367995-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/17/2026S01367995-S1Open ↗
08/17/2026S01367995-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/17/2026S01367995-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026S01367995-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/17/2026S01367995-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/17/2026S01367995-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/17/2026S01367995-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S01367995-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026S01367995-I1Open ↗