← Back
Cape Cod
105 ST JOHNS AVENUE
STATEN ISLAND · BIN 5042941
💬 Discuss this project
1945Year Built
1.5Stories
A0Building Class
R3-2Zoning
938 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
Cape Cod · 9,800 sf lot · 0.1 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 16 docs
Cellar2p · 1 filing · 16 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYX ENGINEERING, PLLC308/05/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PROPERTY DAMAGE RESTORATIONGeneral Contractor407/08/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NYX ENGINEERING, PLLC6118308/05/2024
Building Lifecycle
All (47)Filed (3)Permit Issued (3)Signed Off (2)Violation (2)Inspection (5)Objection (14)Special Inspection (18)
01/13/2025
Signed off — Alteration
PROPOSE INTERIOR AND EXTERIOR RENOVATION TO REPAIR FIRE DAMAGE. RECONSTRUCT REAR EXTENSION AT THE FIRST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00976180-I1
12/17/2024
Signed off — Alteration
PROPOSE INTERIOR AND EXTERIOR RENOVATION TO REPAIR FIRE DAMAGE. RECONSTRUCT REAR EXTENSION AT THE FIRST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00976180-S1
12/12/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/11/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/11/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/06/2024
Permit issued — Plumbing
S00976180-S1-PL
08/24/2024
Objection resolved — Addressed
08/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Xiao Huang
08/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiao Huang
08/23/2024
Special inspection requirement — Concrete - Cast-In-Place
Xiao Huang
08/23/2024
Special inspection requirement — Structural Wood Frame
Xiao Huang
08/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Xiao Huang
08/23/2024
Special inspection requirement — Final
YUNHO LEE
08/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
Xiao Huang
08/23/2024
Special inspection requirement — Insulation placement and R values
Xiao Huang
08/23/2024
Special inspection requirement — Fenestration air leakage
Xiao Huang
08/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Xiao Huang
08/23/2024
Special inspection requirement — Air barrier - visual inspection
Xiao Huang
08/23/2024
Special inspection requirement — Fenestration areas
Xiao Huang
08/23/2024
Special inspection requirement — Interior lighting power
Xiao Huang
08/14/2024
Objection resolved — Addressed
08/14/2024
Objection resolved — Addressed
08/13/2024
Objection raised — Fire_Protection
08/13/2024
Objection raised — Fire_Protection
08/13/2024
Objection raised — Scope
08/05/2024
Filed — Alteration
PROPOSE INTERIOR AND EXTERIOR RENOVATION TO REPAIR FIRE DAMAGE. RECONSTRUCT REAR EXTENSION AT THE FIRST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00976180-P1
07/31/2024
Filed — Alteration
PROPOSE INTERIOR AND EXTERIOR RENOVATION TO REPAIR FIRE DAMAGE. RECONSTRUCT REAR EXTENSION AT THE FIRST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00976180-S1
07/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiao Huang
07/31/2024
Special inspection requirement — Energy Code Compliance Inspections
Xiao Huang
07/31/2024
Special inspection requirement — HVAC-R and service water heating system controls
Xiao Huang
07/31/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Xiao Huang
07/31/2024
Special inspection requirement — HVAC-R and service water heating equipment
Xiao Huang
05/20/2024
Permit issued — Structural
S00976180-I1-GC-CX
04/01/2024
Permit issued — Structural
S00976180-I1-GC-CX
03/15/2024
Objection resolved — Addressed
03/15/2024
Objection resolved — Addressed
03/04/2024
Objection resolved — Addressed
03/04/2024
Objection resolved — Addressed
02/22/2024
Objection raised — Scope
02/22/2024
Objection raised — Inspections
02/22/2024
Objection raised — Zoning
02/22/2024
Objection raised — Zoning
02/08/2024
Filed — Alteration
PROPOSE INTERIOR AND EXTERIOR RENOVATION TO REPAIR FIRE DAMAGE. RECONSTRUCT REAR EXTENSION AT THE FIRST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00976180-I1
07/15/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/18/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP09/06/2024
DOB NOWStructuralSigned-offPROPERTY DAMAGE RESTORATI05/20/2024
DOB NOWStructuralSigned-offPROPERTY DAMAGE RESTORATI04/01/2024
1 project · most recent 12/24/2024
General Wiring
FiledStatusContractorScope
12/24/2024Permit IssuedSURE ELEC'L CONTR'G CORP.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/12/2024Pass-Final General Construction Non-Directive 14PassView ↗
11/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/11/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/11/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
08/23/2024Structural Stability – Alterations of existing buildingsXiao Huangspecial
08/23/2024Fire-Resistant Penetrations and JointsXiao Huangspecial
08/23/2024Concrete - Cast-In-PlaceXiao Huangspecial
08/23/2024Structural Wood FrameXiao Huangprogress
08/23/2024Energy Code Compliance InspectionsXiao Huangprogress
08/23/2024FinalYUNHO LEEprogress
08/23/2024Fire-Resistance Rated ConstructionXiao Huangprogress
08/23/2024Insulation placement and R valuesXiao Huangenergy_progress
08/23/2024Fenestration air leakageXiao Huangenergy_progress
08/23/2024Fenestration and door U-factor and product ratingsXiao Huangenergy_progress
08/23/2024Air barrier - visual inspectionXiao Huangenergy_progress
08/23/2024Fenestration areasXiao Huangenergy_progress
08/23/2024Interior lighting powerXiao Huangenergy_progress
07/31/2024Fire-Resistant Penetrations and JointsXiao Huangspecial
07/31/2024Energy Code Compliance InspectionsXiao Huangprogress
07/31/2024HVAC-R and service water heating system controlsXiao Huangenergy_progress
07/31/2024HVAC-R and service water piping design and insulationXiao Huangenergy_progress
07/31/2024HVAC-R and service water heating equipmentXiao Huangenergy_progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026S00976180-P1Request digital key ↗
08/21/2026S00976180-S1Request digital key ↗
08/21/2026S00976180-I1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026S00976180-I1Open ↗
09/01/2026S00976180-I1Open ↗
09/01/2026S00976180-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026S00976180-P1Open ↗
08/21/2026S00976180-S1Open ↗
08/21/2026S00976180-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026S00976180-I1Open ↗
08/27/2026S00976180-S1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026S00976180-P1Open ↗
08/21/2026S00976180-S1Open ↗
08/21/2026S00976180-I1Open ↗