Two family converted from one family
43 BELAIR ROAD
STATEN ISLAND · BIN 5042959
💬 Discuss this project
1910Year Built
2.75Stories
B3Building Class
R3-2Zoning
3,450 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Two family converted from one family · 6,300 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 21p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLUE CITY CONSTRUCTION303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OAMS ARCHITECTURAL DESIGN P.L.L.C.1110/06/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OAMS ARCHITECTURAL DESIGN1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLUE CITY CONSTRUCTIONGeneral Contractor2207/08/2026
DPH PLUMBING & HTG CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I62521110/06/2025
Building Lifecycle
All (85)Filed (10)Permit Issued (16)Signed Off (4)Violation (6)Inspection (7)Objection (12)Special Inspection (30)
08/12/2026
Signed off — Alteration
ALTERATION FILED FOR A HORIZONTAL EXTENSION ON THE CELLAR, FIRST, SECOND & ATTIC FLOOR. PLUMBING WORK FILED UNDER DOB NOW#: S00943898-I1. MECHANICAL FILED UNDER DOB#S00943898-S3. NO CHANGE IN USE, OCCUPANCY, EGRESS.
S00943898-S3
07/22/2026
Signed off — Alteration
ALTERATION FILED FOR A HORIZONTAL EXTENSION ON THE CELLAR, FIRST, SECOND & ATTIC FLOOR. PLUMBING WORK FILED UNDER DOB NOW#: S00943898-I1. MECHANICAL FILED UNDER DOB#S00943898-S3. NO CHANGE IN USE, OCCUPANCY, EGRESS.
S00943898-S2
07/22/2026
Signed off — Alteration
ALTERATION FILED FOR A HORIZONTAL EXTENSION ON THE CELLAR, FIRST, SECOND & ATTIC FLOOR. PLUMBING WORK FILED UNDER DOB NOW#: S00943898-I1. MECHANICAL FILED UNDER DOB#S00943898-S3. NO CHANGE IN USE, OCCUPANCY, EGRESS.
S00943898-I1
01/12/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/21/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
12/21/2025
Special inspection requirement — Structural Wood Frame
INDARDEO PARBHUNATH
12/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
12/21/2025
Special inspection requirement — Insulation placement and R values
INDARDEO PARBHUNATH
12/21/2025
Special inspection requirement — Structural Steel - Welding
INDARDEO PARBHUNATH
12/21/2025
Special inspection requirement — Interior lighting power
INDARDEO PARBHUNATH
12/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
12/21/2025
Special inspection requirement — Concrete - Cast-In-Place
INDARDEO PARBHUNATH
12/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
INDARDEO PARBHUNATH
12/21/2025
Special inspection requirement — Protection of exposed foundation insulation
INDARDEO PARBHUNATH
12/21/2025
Special inspection requirement — Structural Steel - Details
INDARDEO PARBHUNATH
12/21/2025
Special inspection requirement — Footing and Foundation
INDARDEO PARBHUNATH
12/21/2025
Special inspection requirement — Air barrier - visual inspection
INDARDEO PARBHUNATH
12/21/2025
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
12/21/2025
Special inspection requirement — Fenestration air leakage
INDARDEO PARBHUNATH
12/21/2025
Special inspection requirement — Fenestration areas
INDARDEO PARBHUNATH
12/21/2025
Special inspection requirement — Final
NAVEEN KUMAR
11/19/2025
Objection raised — Other
11/19/2025
Objection resolved — Addressed
11/19/2025
Objection resolved — Addressed
10/27/2025
Objection raised — Other
10/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
10/06/2025
Filed — Alteration
ALTERATION FILED FOR A HORIZONTAL EXTENSION ON THE CELLAR, FIRST, SECOND & ATTIC FLOOR. PLUMBING WORK FILED UNDER DOB NOW#: S00943898-I1. MECHANICAL FILED UNDER DOB#S00943898-S3. NO CHANGE IN USE, OCCUPANCY, EGRESS.
S00943898-P7
09/29/2025
Filed — Alteration
ALTERATION FILED FOR A HORIZONTAL EXTENSION ON THE CELLAR, FIRST, SECOND & ATTIC FLOOR. PLUMBING WORK FILED UNDER DOB NOW#: S00943898-I1. MECHANICAL FILED UNDER DOB#S00943898-S3. NO CHANGE IN USE, OCCUPANCY, EGRESS.
S00943898-P6
09/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
09/19/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/19/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/15/2025
Signed off — Alteration
ALTERATION FILED FOR A HORIZONTAL EXTENSION ON THE CELLAR, FIRST, SECOND & ATTIC FLOOR. PLUMBING WORK FILED UNDER DOB NOW#: S00943898-I1. MECHANICAL FILED UNDER DOB#S00943898-S3. NO CHANGE IN USE, OCCUPANCY, EGRESS.
S00943898-S4
07/30/2025
Permit issued — Construction Fence
S00943898-S4-FN
07/30/2025
Permit issued — Mechanical Systems
S00943898-S3-MS
07/25/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/21/2025
Special inspection requirement — Structural Steel - Welding
04/21/2025
Special inspection requirement — Structural Steel - Details
04/21/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
04/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
04/21/2025
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
04/21/2025
Special inspection requirement — Final
NAVEEN KUMAR
04/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
04/21/2025
Special inspection requirement — Concrete - Cast-In-Place
INDARDEO PARBHUNATH
04/21/2025
Special inspection requirement — Footing and Foundation
INDARDEO PARBHUNATH
04/21/2025
Special inspection requirement — Structural Wood Frame
INDARDEO PARBHUNATH
04/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
INDARDEO PARBHUNATH
02/26/2025
Permit issued — Plumbing
S00943898-I1-PL
02/26/2025
Violation issued (ECB, closed)
Construction
02/26/2025
Violation issued (ECB, closed)
Construction
02/26/2025
Violation issued (ECB, open)
Construction
11/25/2024
Objection resolved — Addressed
11/22/2024
Objection raised — Other
11/18/2024
Filed — Alteration
ALTERATION FILED FOR A HORIZONTAL EXTENSION ON THE CELLAR, FIRST, SECOND & ATTIC FLOOR. PLUMBING WORK FILED UNDER DOB NOW#: S00943898-I1. MECHANICAL FILED UNDER DOB#S00943898-S3. NO CHANGE IN USE, OCCUPANCY, EGRESS.
S00943898-P3
11/18/2024
Filed — Alteration
ALTERATION FILED FOR A HORIZONTAL EXTENSION ON THE CELLAR, FIRST, SECOND & ATTIC FLOOR. PLUMBING WORK FILED UNDER DOB NOW#: S00943898-I1. MECHANICAL FILED UNDER DOB#S00943898-S3. NO CHANGE IN USE, OCCUPANCY, EGRESS.
S00943898-P4
11/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/14/2024
Filed — Alteration
ALTERATION FILED FOR A HORIZONTAL EXTENSION ON THE CELLAR, FIRST, SECOND & ATTIC FLOOR. PLUMBING WORK FILED UNDER DOB NOW#: S00943898-I1. MECHANICAL FILED UNDER DOB#S00943898-S3. NO CHANGE IN USE, OCCUPANCY, EGRESS.
S00943898-P2
08/01/2024
Permit issued — Mechanical Systems
S00943898-S3-MS
07/26/2024
Permit issued — Structural
S00943898-S2-ST
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offBLUE CITY CONSTRUCTION07/30/2025
DOB NOWMechanical SystemsSigned-offBLUE CITY CONSTRUCTION07/30/2025
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP02/26/2025
DOB NOWMechanical SystemsSigned-offBLUE CITY CONSTRUCTION08/01/2024
DOB NOWStructuralSigned-offBLUE CITY CONSTRUCTION07/26/2024
DOB NOWStructuralSigned-offBLUE CITY CONSTRUCTION07/26/2024
DOB NOWConstruction FenceSigned-offBLUE CITY CONSTRUCTION07/26/2024
DOB NOWGeneral ConstructionSigned-offBLUE CITY CONSTRUCTION07/26/2024
DOB NOWEarth WorkSigned-offBLUE CITY CONSTRUCTION07/26/2024
DOB NOWStructuralSigned-offBLUE CITY CONSTRUCTION06/04/2024
DOB NOWStructuralSigned-offBLUE CITY CONSTRUCTION06/04/2024
DOB NOWEarth WorkSigned-offBLUE CITY CONSTRUCTION06/04/2024
DOB NOWMechanical SystemsSigned-offBLUE CITY CONSTRUCTION06/04/2024
DOB NOWFoundationSigned-offBLUE CITY CONSTRUCTION05/29/2024
DOB NOWConstruction FenceSigned-offBLUE CITY CONSTRUCTION04/24/2024
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP02/09/2024
1 project · most recent 10/06/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/06/2025Signed-offBLUE CITY CONSTRUCTIONVentilation Systems
Ventilation
Panasonic FV-15NFLS1 75 CFM · Exhaust Fan ×2
1 project · most recent 10/06/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/06/2025Signed-offJMW PLUMBING, INCGas, Water/Sanitary
2 projects · most recent 09/29/2024
General Wiring
FiledStatusContractorScope
09/29/2024CompleteJOHN MICHAEL AND SONS ELEGeneral Wiring
05/14/2024Permit IssuedWCK ELECTRIC CORP.General Wiring
1 project · most recent 10/06/2025
Concrete Wood
FiledStatusContractorScope
10/06/2025Signed-offBLUE CITY CONSTRUCTIONConcrete, Wood
1 project · most recent 10/06/2025
Fence
FiledStatusContractorScope
10/06/2025Signed-offBLUE CITY CONSTRUCTIONFence
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
01/12/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/19/2025Fail-Final General Construction Non-Directive 14FailView ↗
09/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/25/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/18/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
12/21/2025Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
12/21/2025Concrete - Cast-In-PlaceINDARDEO PARBHUNATHspecial
12/21/2025Structural Steel - DetailsINDARDEO PARBHUNATHspecial
12/21/2025Subsurface Investigations (Borings/Test Pits)BRIAN FLYNNspecial
12/21/2025Structural Steel - WeldingINDARDEO PARBHUNATHspecial
12/21/2025Footing and FoundationINDARDEO PARBHUNATHprogress
12/21/2025Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
12/21/2025Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
12/21/2025FinalNAVEEN KUMARprogress
12/21/2025Structural Wood FrameINDARDEO PARBHUNATHprogress
12/21/2025Interior lighting powerINDARDEO PARBHUNATHenergy_progress
12/21/2025Air barrier - visual inspectionINDARDEO PARBHUNATHenergy_progress
12/21/2025Insulation placement and R valuesINDARDEO PARBHUNATHenergy_progress
12/21/2025Protection of exposed foundation insulationINDARDEO PARBHUNATHenergy_progress
12/21/2025Fenestration and door U-factor and product ratingsINDARDEO PARBHUNATHenergy_progress
12/21/2025Fenestration air leakageINDARDEO PARBHUNATHenergy_progress
12/21/2025Fenestration areasINDARDEO PARBHUNATHenergy_progress
10/10/2025Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
09/29/2025Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
04/21/2025Insulation placement and R valuesINDARDEO PARBHUNATHenergy_progress
04/21/2025Concrete - Cast-In-PlaceINDARDEO PARBHUNATHspecial
04/21/2025Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
04/21/2025Structural Steel - Details—special
04/21/2025Structural Steel - Welding—special
04/21/2025Subsurface Investigations (Borings/Test Pits)BRIAN FLYNNspecial
Latest 25 of 61.
▾Documents — 115 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/20/2026S00943898-P5Request digital key ↗
08/20/2026S00943898-P3Request digital key ↗
08/20/2026S00943898-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026S00943898-P5Open ↗
08/13/2026S00943898-P6Open ↗
08/13/2026S00943898-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026S00943898-S2Open ↗
08/13/2026S00943898-P6Open ↗
08/13/2026S00943898-P5Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications67
▸DOB NOWProgress Inspector Seal & Signature38
08/27/2026S00943898-P5Open ↗
08/27/2026S00943898-P5Open ↗
08/27/2026S00943898-P5Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/13/2026S00943898-P7Open ↗
08/29/2026S00943898-I1Open ↗
08/27/2026S00943898-P5Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/20/2026S00943898-I1Open ↗
08/20/2026S00943898-P2Open ↗
08/20/2026S00943898-P1Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/20/2026S00943898-P1Open ↗
08/20/2026S00943898-S3Open ↗
08/20/2026S00943898-I1Open ↗
Showing 3 of 10 on file for this type
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT4
08/13/2026S00943898-P5Open ↗
08/13/2026S00943898-P2Open ↗
08/13/2026S00943898-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026S00943898-S2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00943898-S2Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial4
08/13/2026S00943898-P5Open ↗
08/13/2026S00943898-S2Open ↗
08/13/2026S00943898-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026S00943898-S2Open ↗
08/13/2026S00943898-P6Open ↗
08/13/2026S00943898-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026S00943898-P2Open ↗
08/13/2026S00943898-S2Open ↗
08/13/2026S00943898-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00943898-S2Open ↗